Inspection / Activity Plan Page 1 of 2 03/04/2011 07:06:20 Report 22 03/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point OL EXAM
- INITIAL RETAKE EXAM WEEK 1
3 TURKEY POINT/MARCH 2011 RETAKE EXAM AT POWER FACILITIES V23384 03/02/2011 03/04/2011 ISFSI
- INSPECTION OF ISFSI CRANE 3
3, 4 IP Preoperational Testing Of An ISFSI 60854 03/14/2011 03/18/2011 EB3 ISI
- UNIT 4 IN-SERVICE INSPECTION 1
4 IP Inservice Inspection Activities - PWR 7111108P 03/28/2011 04/01/2011 PSB1-RP
- OCCUPATIONAL RP WK 1 3
3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/11/2011 04/15/2011 3, 4 IP Occupational ALARA Planning and Controls 71124.02 04/11/2011 04/15/2011 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/11/2011 04/15/2011 3, 4 IP Occupational Dose Assessment 71124.04 04/11/2011 04/15/2011 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/11/2011 04/15/2011 3, 4 IP Performance Indicator Verification 71151 04/11/2011 04/15/2011 PSB1-RP
- OCCUPATIONAL RP WK 2 5
3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/18/2011 04/22/2011 3, 4 IP Occupational ALARA Planning and Controls 71124.02 04/18/2011 04/22/2011 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/18/2011 04/22/2011 3, 4 IP Occupational Dose Assessment 71124.04 04/18/2011 04/22/2011 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/18/2011 04/22/2011 3, 4 IP Performance Indicator Verification 71151 04/18/2011 04/22/2011 TI-177
- TI-177 3
3 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 06/20/2011 06/24/2011 ISFSI
- ISFSI DRY RUN 6
3, 4 IP Preoperational Testing Of An ISFSI 60854 06/20/2011 06/25/2011 CDBI
- COMPONENT DESIGN BASES INSPECTION 5
3, 4 IP Component Design Bases Inspection 7111121 06/27/2011 07/01/2011 3, 4 IP Component Design Bases Inspection 7111121 07/11/2011 07/14/2011 3, 4 IP Component Design Bases Inspection 7111121 07/25/2011 07/29/2011 3, 4 IP Component Design Bases Inspection 7111121 08/08/2011 08/12/2011 DRP/RPB3
- 95001 SUPPLEMENTAL INSPECTION 2
4 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 07/11/2011 07/15/2011 ISFSI
- ISFSI FIRST LOADING CAMPAIGN 3
3, 4 IP Operation Of An ISFSI 60855 07/11/2011 07/15/2011 OL EXAM
- INITIAL EXAM PREP 4
3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 10/31/2011 11/04/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 03/04/2011 07:06:20 Report 22 03/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point OL-RQ
- REQUAL INSPECTION 2
3, 4 IP Licensed Operator Requalification Program 7111111B 11/14/2011 11/18/2011 OL EXAM
- INITIAL EXAM - WEEK 1 4
3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/05/2011 12/09/2011 OL EXAM
- INITIAL EXAM - WEEK 2 4
3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/12/2011 12/16/2011 EB3 ISI
- UNIT 3 INSERVICE INSPECTION 1
3 IP Inservice Inspection Activities - PWR 7111108P 01/16/2012 01/20/2012 EB3-LR
- UNIT 3 POST APPROVAL LR - PHASE 1 1
3 IP Post-Approval Site Inspection for License Renewal 71003 01/23/2012 01/27/2012 PSB1-RP
- PUBLIC RADIATION SAFETY BASELIN 3
3, 4 IP Occupational Dose Assessment 71124.04 01/30/2012 02/03/2012 3, 4 IP Radiation Monitoring Instrumentation 71124.05 01/30/2012 02/03/2012 3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/30/2012 02/03/2012 3, 4 IP Radiological Environmental Monitoring Program 71124.07 01/30/2012 02/03/2012 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
3, 4 IP Alert and Notification System Testing 7111402 02/13/2012 02/17/2012 3, 4 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 02/13/2012 02/17/2012 3, 4 IP Emergency Action Level and Emergency Plan Changes 7111404 02/13/2012 02/17/2012 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/13/2012 02/17/2012 3, 4 IP Performance Indicator Verification 71151 02/13/2012 02/17/2012 EB3 LR
- POST APPROVAL LR INSPECTION - PHASE 2 6
3, 4 IP Post-Approval Site Inspection for License Renewal 71003 05/21/2012 05/25/2012 3, 4 IP Post-Approval Site Inspection for License Renewal 71003 06/04/2012 06/08/2012 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 5
3, 4 IP Identification and Resolution of Problems 71152B 06/18/2012 06/22/2012 3, 4 IP Identification and Resolution of Problems 71152B 06/25/2012 06/29/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.