ML112440368

From kanterella
Jump to navigation Jump to search
Report 22 - Turkey Point
ML112440368
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/01/2011
From:
NRC/RGN-II
To:
Shared Package
ML112440358 List:
References
Download: ML112440368 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2011 11:23:30 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point DRP/BR3

- SPECIAL INSPECTION TEAM 7

3, 4 IP Special Inspection 93812 08/15/2011 09/23/2011 OL EXAM

- INITIAL EXAM PREP 4

3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 10/31/2011 11/04/2011 OL-RQ

- REQUAL INSPECTION 2

3, 4 IP Licensed Operator Requalification Program 7111111B 11/14/2011 11/18/2011 OL EXAM

- INITIAL EXAM - WEEK 1 4

3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/05/2011 12/09/2011 PSB1-RP

- OCCUPATIONAL DOSE ASSESSMENT 1

3, 4 IP Occupational Dose Assessment 71124.04 12/05/2011 12/09/2011 OL EXAM

- INITIAL EXAM - WEEK 2 4

3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/12/2011 12/16/2011 EPU INSP

- EXTENDED POWER UPRATE 2

3 IP Power Uprate 71004 01/01/2012 07/09/2012 PSB1-RP

- PUBLIC RADIATION SAFETY BASELINE 4

3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/23/2012 01/27/2012 3, 4 IP Radiological Environmental Monitoring Program 71124.07 01/23/2012 01/27/2012 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 01/23/2012 01/27/2012 3, 4 IP Performance Indicator Verification 71151 01/23/2012 01/27/2012 EB3 ISI

- UNIT 3 INSERVICE INSPECTION 1

3 IP Inservice Inspection Activities - PWR 7111108P 02/06/2012 02/10/2012 EB3-LR

- UNIT 3 POST APPROVAL LR - PHASE 1 2

3 IP Post-Approval Site Inspection for License Renewal 71003 02/13/2012 02/17/2012 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

3, 4 IP Alert and Notification System Testing 7111402 02/13/2012 02/17/2012 3, 4 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 02/13/2012 02/17/2012 3, 4 IP Emergency Action Level and Emergency Plan Changes 7111404 02/13/2012 02/17/2012 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/13/2012 02/17/2012 3, 4 IP Performance Indicator Verification 71151 02/13/2012 02/17/2012 PSB1-RP

- RADIOLOGICAL HAZARD ASSESSMENT 1

3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/27/2012 03/02/2012 MODS

- MODIFICATIONS INSPECTION 4

3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/16/2012 04/20/2012 3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/30/2012 05/04/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 09/01/2011 11:23:30 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point EB3 LR

- POST APPROVAL LR INSPECTION - PHASE 2 6

3, 4 IP Post-Approval Site Inspection for License Renewal 71003 05/21/2012 05/25/2012 3, 4 IP Post-Approval Site Inspection for License Renewal 71003 06/04/2012 06/08/2012 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

3, 4 IP Problem Identification and Resolution 71152B 07/16/2012 07/20/2012 3, 4 IP Problem Identification and Resolution 71152B 07/30/2012 08/03/2012 EB3 ISI

- TP 4 ISI 1

3, 4 IP Inservice Inspection Activities - PWR 7111108P 11/12/2012 11/16/2012 LR71003

- TP4 PHASE 1 LICENSE RENEWAL 2

3, 4 IP Post-Approval Site Inspection for License Renewal 71003 11/12/2012 11/16/2012 7111108

- TP4 SGISI 1

4 IP Inservice Inspection Activities - PWR 7111108P 11/15/2012 11/19/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.