ML17223B111

From kanterella
Revision as of 21:48, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Nov 1990 for St Lucie Units 1 & 2
ML17223B111
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/1990
From: Breen J
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17223B107 List:
References
NUDOCS 9102260054
Download: ML17223B111 (2)


Text

OPERATING DATA REPORT DOCKET Na 50 335 DATE 12/1%/90 COMPLETED BY Ji Ji BREEN TELEPHONE 407/465/3550 OPERATING STATUS 1, UNIT NAME: ST, LUCIE UNIT 1 2, REPORTING PERIOD t NOVEMBER 1990 3 LXCENSED THERMAL POWER (MWT): 2700 4, NAMEPLATE RATING (GROSS MME) i 850 5o DESIGN FLECTRIC*L RATXNG (NET MHE) + 830

6. MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE); 872 MAXIMUM DEPENDABLE CAPACITY (NET MHE)! 839 Bi IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT> GIVE REASONS LEVEL TO WHICH RESTRICTED~ XF ANY (NET MHE)

'OHER

10. REASONS FOR RESTRICTIONS ~ XF ANY e MONTHLY - YTD- CUMULATIVE ii, 12 o HOURS IN REPORT PERIOD',

NUMBER OF HOURS REACTOR HAS CRITICAL 720 720eO 8016 4825i9 122232oO 92214i5 13m REACTOR RESERVE SHUTDOWN HOURS 0+0 OiO 205i3 14'OURS GENERATOR ON-LXNE 720+0 4723.4 91360o4 15'NIT RESERVE SHUTDOHN HOURS OoO Owe 39 i 3 16'ROSS THERMAL ENERGY GENERATED (MHH) 1943136 12333068 235290708 17, GROSS ELECTRXCAL ENERGY GENERATED (MPH) 654080 4109430 77552500 18'ET ELECTRICAL ENERGY GENERATED (MNH) 621821 3870868 73269733

19. UNXT SERVICE FA'CTOR iepip 58i9 74+7 20 i UNXT A VAXLABILXTYFACTOR 100+0 58i9 74 i 8 21'APACITY FACTOR (USXNG MOC NET) 102 i 9 57+6 74i4 22'APACXTY FACTOR.(USXNG DER NET) 104' 58o2 73 4 3 23'NXT FORCED OUTAGE RATE .Oea -- I Se5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 IF SHUT DOWN AT END OF REPORT PERIOD~ ESTIMATED DATE OF STARTUP'91022 CK P5PPP335

'R

OPERATING DATA REPORT DOCKET NO 50 389 DATE 12/ i9/9e COMPLETED BY J, J, BREEN TELEPHONE 407/465/3550 OPERATING STATUS 1, UNIT NAMF: ST o LUCIE UNIT 2 2 o REPORTING PERIOD'OVEMBER 1990

'.3. LICENSED THERMAL POHER <MAT): 2700 NAMEPLATE RATING < GROSS MME) o 850

5. DESIGN ELECTRICAL RATING (NET MHE)o 830 6o MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MME) f 839 8, XF CHANGES OCCUR XN CAPACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT~ GXVE REASONS'.

POHER LEVEL TO WHICH RESTRICTED ~ IF ANY < NET MHE)

LQi REASONS FOR RESTRXCTXONSr IF ANY'ONTHLY

-YTD- CUMULATIVE iio HOURS XN REPORT PERIODS 720 8016 64129ie l:2i NUMBER OF HOURS REACTOR HAS CRXTXCAL 45' 5987i4 54156+3 l3o REACTOR RESERVE SHUTDOWN HOURS 0+0 OiO OiO L4i HOURS GENERATOR'N-LINE OoO 5839i8 53194' L5i UNIT RESER'VE SHUTDOHN HOURS OiO OiO 0+0 f6'ROSS THERMAL ENERGY GENERATED (MWH) 0 15415909 139213305

17. GROSS ELECTRICAL ENERGY. GENERATED (MWH) 0 5113870 46365780 18'ET

.

ELECTRXCAL ENERGY GENERATED (MNH) -7288 4822084 43835198 19 i UNXT SERVICE FACTOR OoO 72i9 82o9

20. UNZT A VAXLABILITYFACTOR OiO 72' 82i9 21'APACXTY FACTOR (USXNG MDC NET) OoO 7io7 83i2 22'APACXTY FACTOR (USXNG DER NET) OiO 72@5 83+2 23'NXT FORCED OUTAGE RATE 0+0 10 i8 5i9 24, SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25, IF SHUT DOWN AT END OF REPORT PERIOD~ ESTXMATED DATE OF STARTUP'2/4/90