ML17223B111
| ML17223B111 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/30/1990 |
| From: | Breen J FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17223B107 | List: |
| References | |
| NUDOCS 9102260054 | |
| Download: ML17223B111 (2) | |
Text
OPERATING STATUS OPERATING DATA REPORT DOCKET Na 50 335 DATE 12/1%/90 COMPLETED BY Ji Ji BREEN TELEPHONE 407/465/3550 1,
UNIT NAME:
ST, LUCIE UNIT 1
2, REPORTING PERIOD t NOVEMBER 1990 3
LXCENSED THERMAL POWER (MWT):
2700 4,
NAMEPLATE RATING (GROSS MME) i 850 5o DESIGN FLECTRIC*L RATXNG (NET MHE) +
830 6.
MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE);
872 MAXIMUM DEPENDABLE CAPACITY (NET MHE)!
839 Bi IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT>
GIVE REASONS
'OHER LEVEL TO WHICH RESTRICTED~
XF ANY (NET MHE) 10.
REASONS FOR RESTRICTIONS ~
XF ANY e MONTHLY
-YTD-CUMULATIVE ii, HOURS IN REPORT PERIOD',
12 o NUMBER OF HOURS REACTOR HAS CRITICAL 13m REACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LXNE 15'NIT RESERVE SHUTDOHN HOURS 16'ROSS THERMAL ENERGY GENERATED (MHH) 17, GROSS ELECTRXCAL ENERGY GENERATED (MPH) 18'ET ELECTRICAL ENERGY GENERATED (MNH) 19.
UNXT SERVICE FA'CTOR 20 i UNXT AVAXLABILXTYFACTOR 21'APACITY FACTOR (USXNG MOC NET) 22'APACXTY FACTOR.(USXNG DER NET) 23'NXT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 720eO 0+0 720+0 OoO 1943136 654080 621821 iepip 100+0 102 i 9 104'
.Oea 8016 4825i9 OiO 4723.4 Owe 12333068 4109430 3870868 58i9 58i9 57+6 58o2
-- I Se5 122232oO 92214i5 205i3 91360o4 39 i 3 235290708 77552500 73269733 74+7 74 i 8 74i4 73 4 3 25 IF SHUT DOWN AT END OF REPORT PERIOD~
ESTIMATED DATE OF STARTUP'91022 CK P5PPP335
'R
OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 389 DATE 12/ i9/9e COMPLETED BY J, J, BREEN TELEPHONE 407/465/3550 1,
UNIT NAMF:
ST o LUCIE UNIT 2 2 o REPORTING PERIOD'OVEMBER 1990
'.3.
LICENSED THERMAL POHER
<MAT):
2700 NAMEPLATE RATING
< GROSS MME) o 850 5.
DESIGN ELECTRICAL RATING (NET MHE)o 830 6o MAXIMUM DEPENDABLE CAPACITY (GROSS MHE):
882 7.
MAXIMUM DEPENDABLE CAPACITY (NET MME) f 839 8,
XF CHANGES OCCUR XN CAPACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT~
GXVE REASONS'.
POHER LEVEL TO WHICH RESTRICTED ~ IF ANY
< NET MHE)
LQi REASONS FOR RESTRXCTXONSr IF ANY'ONTHLY
-YTD-CUMULATIVE iio HOURS XN REPORT PERIODS l:2i NUMBER OF HOURS REACTOR HAS CRXTXCAL l3o REACTOR RESERVE SHUTDOWN HOURS L4i HOURS GENERATOR'N-LINE L5i UNIT RESER'VE SHUTDOHN HOURS f6'ROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY. GENERATED (MWH) 18'ET ELECTRXCAL ENERGY GENERATED (MNH) 19 i UNXT SERVICE FACTOR 20.
UNZT AVAXLABILITYFACTOR 21'APACXTY FACTOR (USXNG MDC NET) 22'APACXTY FACTOR (USXNG DER NET) 23'NXT FORCED OUTAGE RATE 24, SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 45' 0+0 OoO OiO 0
. 0
-7288 OoO OiO OoO OiO 0+0 8016 5987i4 OiO 5839i8 OiO 15415909 5113870 4822084 72i9 72' 7io7 72@5 10 i8 64129ie 54156+3 OiO 53194' 0+0 139213305 46365780 43835198 82o9 82i9 83i2 83+2 5i9 25, IF SHUT DOWN AT END OF REPORT PERIOD~
ESTXMATED DATE OF STARTUP'2/4/90