ML17228B402
| ML17228B402 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 01/31/1996 |
| From: | Bohlke W, Rogers J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-96-32, NUDOCS 9602220161 | |
| Download: ML17228B402 (11) | |
Text
CATEGORY j.
REGULATOlOZNFORNATION DISTRIBUTION TEM (RIDE)
ACCESSION NBR:9602220161 DOC.DATE: 96/01/31 NOTARIZED:
NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power a Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power a Light Co.
AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.
Florida Power
& Light Co.
BOHLKE,W.H.
Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
SUBJECT:
Monthly operating repts for Jan 1996 for St Lucie.W/960214 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS E CENTER 0
EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 10 10 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME NORRISFJ AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL
,. 19
V Florida Power &Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 L-96-32 10 CFR 50.36 FEB 14 1996 U.
S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, attached ar'e the January 1996 Operating Data Report, Summary of Operating Experience
- Reports, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Should there be any questions on this information, please contact us
~
Very truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/SL cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments 9602220161
'F60131 PDR ADQCK 05000335 R
OPERATING DATA REPORT OPBRATING STATUS DOCKET NO 50 - 335 DATE 2/ 9/96 PPL LICENSING GROUP JUNO TELEPHONE 407/694/4432
- 1. UNIT NAME:
ST.
LUCIE UNIT 1 2.
REPORTING PERIOD:
JANUARY 1996 3.
LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS HWE):
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
872 7.
MAXIMUM DEPENDABIE CAPACITY (NET MWE):
839 8.
ZF CHANGES OCCUR IN CAPACITY RATINGS (ITBMS NUMBER 3 THROUGH 7)
SINCB LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHZCH RESTRICTED, ZF ANY (NBT MWE) 10.
REASONS FOR RESTRICTIONS, ZP ANY:
MONTHLY YTD CUMULATIVE 11 12 13 14 15 16 17 18 19 20 21 22 23 24 HOURS IN REPORT PERIOD:
NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDO'M HOURS HOURS GENERATOR ON-LZNB UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL BNBRGY GENBRATED (MWH)
GROSS ELECTRICAL ENERGY GBNERATBD (MWH)
NBT ELECTRZCAL ENERGY GENERATED (MWH)
UNIT SBRVICE FACTOR UNIT AVAILABILITYPACTOR CAPACITY PACTOR (USING HDC NET)
CAPACITY PACTOR (USING DER NBT)
UNIT FORCBD OUTAGE RATE SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS Refueling and Maintenance
- April 744 744.0 0.0 744.0 0.0 1999024 650250 616642 100.0 100.0 98.8 99.9 0.0 29, 1996 744 744.0 0.0 744.0 0.0 1999024 650250 616642 100. 0 100.0 98.8 99.9 0.0 167544.0 130784.0 205.3 129365.6 0.0 335475813 110639270 104561915 77.2 77 '
76.5 76.0 5.0
- 25. IP SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATB OF STARTUP:
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie 51 February 13, 1996 J.A.ROGERS (407) 467-7296 REPORT MONTH Unit 1 operated at essentially full power for the entire month.
The unit reduced power for repair of a feedwater valve on January 19 and for waterbox cleaning on January 23.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT:
DATE COMPLETED BY:
TELEPHONE:
50-335 St. Lucie 51 Feb.13, 1996 J.A.ROGERS (407) 467-7296 MONTH DAY 01/01/96 01/02/96 01/03/96 01/04/96 01/05/96 01/06/96 01/07/96 01/08/96 01/09/96 01/10/96 01/11/96 01/12/96 01/13/96 01/14/96 01/15/96 01/16/96 01/17/96 01/18/96 01/19/96 01/20/96 01/21/96 01/22/96 01/23/96 01/24/96 01/25/96 01/26/96 01/27/96 01/28/96 01/29/96 01/30/96 01/31/96 AVERAGE DAILY POWER LEVEL (MWe-Net) 833 826 829 829 825 830 829 833 839 839 837 840 834 839 839 836 831 822 814 815 818 823 806 739 848 847 843 843 840 838 829
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNITNAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 ST LUCIE UNIT I February 13, 1996 J.A.ROGERS (407) 467-7296 0
M No.
Date Type Duration (Hours)
Reason'ethod of Shutting Down Reactor'icensee Event Report
¹ System Code'omponent Code'ause
& Corrective Action to Prevent Recurrence 1/19/96 0.0 N/A HH VALVES Unit 1 reduced power to repair Feedwater Valve LCV-24-A.
1/23/96 0.0 N/A HF HTEXCH Unit 1 reduced power for waterbox cleaning.
F Forced S
Scheduled Reason A - Erluipment failure (exp!ain)
II - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training k License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG416l) 5 Exhibit I - Same Source telssr Fpt.
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 - 389 DATE 2/ 9/96 FPL LICENSING GROUP JUNO TELEPHONE 407/694/4432
- 1. UNIT NAME:
ST.
LUCIE UNIT 2 2.
REPORTING PERIOD:
JANUARY 1996 3.
LICENSED THERHAL POWER (HWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850 5.
DBSIGN BLBCTRICAL RATING (NET HWE):
830 6.
MAXIMUM DBPBNDABLE CAPACITY (GROSS MWE):
882 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
839
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IP ANY (NBT MWE) 10.
RBASONS FOR RESTRICTIONS, IP ANY:
NONTHLY YTD CUMULATZVB 11.
HOURS ZN REPORT PERZOD:
12.
NUMBER OP HOURS RBACTOR WAS CRZTZCAL 13.
REACTOR RESBRVE SHUTDOWN HOURS 14.
HOURS GBNBRATOR ON LINE
- 15. UNIT RBSBRVE SHUTDOWN HOURS 16.
GROSS THERMAL BNBRGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NBT ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE PACTOR
- 20. UNIT AVAILABIIITY FACTOR 21.
CAPACITY FACTOR (USING HDC NET) 22.
CAPACITY PACTOR (USING DER NET)
- 23. UNIT PORCBD OUTAGE RATE 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 700.9 0.0 600.8 0.0 1490632 494400 462636 80.8 80.8 74.1
- 74. 9 7.0 744 700. 9 0.0 600.8 0.0 1490632 494400 462636 80.8 80.8
- 74. 1
- 74. 9 7.0 109441.0 91571.5 0.0 90039.5 0.0 233953354 77555070 73253304 82.3 82.3 80.6
- 81. 1 6.7
- 25. IP SHUT DOWN AT END OP REPORT PERIOD, BSTIMATBD DATE OF STARTUP:
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie I2 February 13, 1996 J.A.ROGERS (407) 467-7296 REPORT MONTH Unit 2 remained off line for Cycle 9 refueling until January 5 when it returned to service and operated at reduced power for reactor startup physics testing.
During power ascension, the unit was manually tripped due to a failed temperature control valve on the generator hydrogen cooling system.
When the unit was returned to service on January 7, reactor power ascension was resumed.
On January 8, power was held at approximately 43 percent to repair the 2A Main Feedwater Pump.
Power ascension resumed January 9 and continued through January 10.
The unit then operated at essentially 100 percent power for the remainder of the month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie ¹2 Feb.13, 1996 Z.A ROGERS (407) 467-7296 DAY 01/01/96 01/02/96 01/03/96 01/04/96 01/05/96 01/06/96 01/07/96 01/08/96 01/09/96 01/10/96 01/11/96 01/12/96 01/13/96 01/14/96 01/15/96 01/16/96 01/17/96 01/18/96 01/19/96 01/20/96 01/21/96 01/22/96 01/23/96 01/24/96 01/25/96
'01/26/96 01/27/96 01/28/96 01/29/96 01/30/96 01/31/96 MONTH AVERAGE DAILY POWER LEVEL (Mwe-Net) 0 0
0 0
61 0
80 300 453 672 817 856 857 854 855 854 856 853 854 855 854 852 837 856 854 854 853 853 853 854 848
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNITNAME:
" DATE:
COMPLETED BY:
TELEPHONE:
K!0 0
50-389 ST LUCIE UNIT2 February 13, 1996 J.A.ROGERS (407) 467-7296 h
No.
Date Type Duration (Hours)
Reason'ethod of Shutting Down Reactor'icensee Event Report
//
System Code'omponent Code'ause Ec Corrective Action to Prevent Recurrence 14 10/9/95 98.1 N/A VESSEL Unit 2 offline for Cycle 9 refueling and maintenance.
1/5/96 0.0 N/A RC FUELXX Unit 2 performing power ascension testing.
1/5/96 45.1 38996-001 HA VALVES Unit 2 removed from service to repair a heat exchanger control valve.
1/8/96 0.0 N/A HH PUMPXX Unit 2 reduced power to repair 2A Main Feedwater Pump.
1/9/96 0.0 N/A RC FUELXX Unit 2 performing power ascension testing.
F Forced S
Schcdulcd Reason A - Equipment failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training g: License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG4II61) 5 Exhibit I - Same Source r6 l 5 sr FPt.