Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17241A489 | 7 October 1999 | LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr | |
ML17241A495 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr | |
ML17241A474 | 31 August 1999 | Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. | |
ML17241A459 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr | |
ML17241A430 | 31 July 1999 | Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr | |
ML17241A411 | 16 July 1999 | LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr | |
ML17241A403 | 6 July 1999 | LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr | Shutdown Margin |
ML17241A404 | 6 July 1999 | LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr | Rod Drop Event |
ML17241A409 | 30 June 1999 | Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr | |
ML17241A394 | 30 June 1999 | LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr | |
ML17355A368 | 30 June 1999 | Revised Update to Topical QA Rept, Dtd June 1999 | Safe Shutdown Non-Destructive Examination Fire Barrier Commercial Grade Dedication Coatings Nondestructive Examination Condition Adverse to Quality License Renewal Control of Heavy Loads Early Warning Fire Detection |
ML17241A355 | 4 June 1999 | LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr | |
ML17241A363 | 31 May 1999 | Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr | |
ML17241A332 | 17 May 1999 | LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 | |
ML17241A327 | 6 May 1999 | LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr | Boric Acid Coatings Through Wall Leak Power change |
ML17241A333 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr | |
ML17229B080 | 7 April 1999 | LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr | |
ML17229B084 | 7 April 1999 | Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. | |
ML17229B079 | 7 April 1999 | LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr | Unanalyzed Condition Boric Acid Time of Discovery Coatings |
ML17229B096 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr | |
ML17229B054 | 10 March 1999 | LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr | Enforcement Discretion |
ML17229B046 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr | |
ML17229B005 | 31 January 1999 | Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr | |
ML17229A990 | 20 January 1999 | LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr | |
ML17229A996 | 14 January 1999 | SG Tube Inservice Insp Special Rept. | |
ML17229A982 | 4 January 1999 | LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr | Shutdown Margin |
ML17229A983 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr | Power change |
ML17229A961 | 22 December 1998 | LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr | |
ML17229A956 | 15 December 1998 | LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr | Missed surveillance |
ML17241A358 | 9 December 1998 | Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. | Hot Short Safe Shutdown Boric Acid Packing leak Ultimate heat sink Grab sample Fire Barrier Tornado Missile Hydrostatic Liquid penetrant Through-Wall Leak Grace period |
ML17229A942 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr | |
ML17229A930 | 25 November 1998 | LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage | Hot Short Safe Shutdown |
ML17229A902 | 4 November 1998 | LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr | Power change |
ML17241A493 | 1 November 1998 | Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). | |
ML17229A905 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr | |
ML17229A887 | 19 October 1998 | Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length | |
ML17229A878 | 19 October 1998 | Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length | |
ML17229A877 | 14 October 1998 | LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr | |
ML17229A876 | 14 October 1998 | LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr | Hot Short Safe Shutdown Fire Barrier Fire Protection Program |
ML17229A872 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr | |
ML17229A851 | 2 September 1998 | LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr | Safe Shutdown |
ML17229A861 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr | |
ML18066A277 | 13 August 1998 | Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency | |
ML17229A848 | 7 August 1998 | Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. | |
ML17229A946 | 7 August 1998 | Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. | |
ML17229A830 | 31 July 1998 | Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr | |
ML17229A820 | 29 July 1998 | LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr | |
ML17229A798 | 30 June 1998 | Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr | |
ML17229A770 | 31 May 1998 | Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr | |
ML17229A741 | 28 May 1998 | LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr | Grab sample Offsite Dose Calculation Manual |