 Issue dateTitleTopic
ML17241A4897 October 1999LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr
ML17241A49530 September 1999Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr
ML17241A47431 August 1999Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr.
ML17241A45931 August 1999Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr
ML17241A43031 July 1999Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr
ML17241A41116 July 1999LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr
ML17241A4036 July 1999LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 LtrShutdown Margin
ML17241A4046 July 1999LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 LtrRod Drop Event
ML17241A40930 June 1999Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr
ML17241A39430 June 1999LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr
ML17355A36830 June 1999Revised Update to Topical QA Rept, Dtd June 1999Safe Shutdown
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Coatings
Nondestructive Examination
Condition Adverse to Quality
License Renewal
Control of Heavy Loads
Early Warning Fire Detection
ML17241A3554 June 1999LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr
ML17241A36331 May 1999Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr
ML17241A33217 May 1999LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11
ML17241A3276 May 1999LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 LtrBoric Acid
Coatings
Through Wall Leak
Power change
ML17241A33330 April 1999Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr
ML17229B0807 April 1999LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr
ML17229B0847 April 1999Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines.
ML17229B0797 April 1999LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 LtrUnanalyzed Condition
Boric Acid
Time of Discovery
Coatings
ML17229B09631 March 1999Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr
ML17229B05410 March 1999LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 LtrEnforcement Discretion
ML17229B04628 February 1999Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr
ML17229B00531 January 1999Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr
ML17229A99020 January 1999LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr
ML17229A99614 January 1999SG Tube Inservice Insp Special Rept.
ML17229A9824 January 1999LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 LtrShutdown Margin
ML17229A98331 December 1998Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 LtrPower change
ML17229A96122 December 1998LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr
ML17229A95615 December 1998LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 LtrMissed surveillance
ML17241A3589 December 1998Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209.Hot Short
Safe Shutdown
Boric Acid
Packing leak
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Hydrostatic
Liquid penetrant
Through-Wall Leak
Grace period
ML17229A94230 November 1998Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr
ML17229A93025 November 1998LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 OutageHot Short
Safe Shutdown
ML17229A9024 November 1998LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 LtrPower change
ML17241A4931 November 1998Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project).
ML17229A90531 October 1998Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr
ML17229A88719 October 1998Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length
ML17229A87819 October 1998Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length
ML17229A87714 October 1998LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr
ML17229A87614 October 1998LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 LtrHot Short
Safe Shutdown
Fire Barrier
Fire Protection Program
ML17229A87230 September 1998Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr
ML17229A8512 September 1998LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 LtrSafe Shutdown
ML17229A86131 August 1998Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr
ML18066A27713 August 1998Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency
ML17229A8487 August 1998Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr.
ML17229A9467 August 1998Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr.
ML17229A83031 July 1998Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr
ML17229A82029 July 1998LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr
ML17229A79830 June 1998Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr
ML17229A77031 May 1998Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr
ML17229A74128 May 1998LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 LtrGrab sample
Offsite Dose Calculation Manual