ML17228B420

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr
ML17228B420
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/29/1996
From: Bohlke W, Rogers J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-65, NUDOCS 9603210192
Download: ML17228B420 (13)


Text

CATEGORY. j.

REGULRTie INFORMATION DISTRIBUTIONOISTEM (RIDE)

ACCESSION NBR:9603310192 DOC.DATE: 96/02/29 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-359 St. Lucie Plant, Unit 2, Flor'da Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS,J.AD Florida Power & Light Co.

BOHLKE,H.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Feb 1996 for St Lucie Units 1 &

2.W/960312 ltr.

DISTRIBUTION CODE: IE24D. COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 1 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCEFJ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL MRXDSM RECXPXENTSl PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN GD 5(EKT. 416"20S3) TO ELXMXNATB YOUR NAME FROM DXSTRXBUTXON LXSTS FOR DOCUMENTS YOU DON'T NBEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL .19

N Florida Power & Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 L-96-65 10 CFR 50.36 NAR 12 1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the February 1996, Operating Data, Summary of Operating Experience, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions Reports for St.. Lucie'nits 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/SL Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9'f AAo>

9i0321O>m 9eOaV9 PDR ADaCK OSOOO33S R POR an FPL Group company

4 qpaf 'J~

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 3/ 6/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCZE UNIT 1
2. REPORTING PERIOD: FEBRUARY 1996
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9 ~ I POWER LEVEL TO WHICH RESTR CTED ~ IF ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY "YTD" CUMULATIVE

11. HOURS IN REPORT PERIOD: 696 1440 168240.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 657.8 1401. 8 131441. 8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205. 3
14. HOURS, GENERATOR ON-LINE 632.4 1376.4 129998.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1656379 3655403 337132192
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 541339 1191589 111180609
18. NET ELECTRICAL ENERGY GENERATED (MWH) 510704 1127346 105072619
19. UNIT SERVICE FACTOR 90.9 95.6 77.3
20. UNIT AVAILABILITYFACTOR 90.9 95.6 77.3
21. CAPACITY FACTOR (USING MDC NET) 87.5 93.3 76.5
22. CAPACITY FACTOR (USING DER NET) 88.4 94.3 76.0
23. UNIT FORCED OUTAGE RATE 9.1 4.4 5.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS Refueling and Maintenance - April 29, 1996 25 IF SHUT DOWN AT END OF REPORT PERIOD ~ ESTIMATED DATE OF STARTUP '

DOCKET NO.: 50-335 UNIT: St. Lucie gl DATE: March 11, 1996 COMPLETED BY: J'.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 1 operated at full power for the first week of the month. The unit reduced power for waterbox cleaning February 8 through 10. On February 22, the unit downpowered to recover a dropped control element assembly (CEA) . The unit was manually tripped and the CEA power supply was replaced. The unit was returned to service on February 25.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-335 UNIT: St. Lucie g1 DATE March 11, 1996 COMPLETED BY: Z.A.ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/96 821 02/02/96 817 02/03/96 819 02/04/96 817 02/05/96 831 02/06/96 835 02/07/96 839 02/08/96 795 02/09/96 557 02/10/96 715 02/11/96 835 02/12/96 834 02/13/96 838 02/14/96 833 02/15/96 837 02/16/96 835 02/17/96 842 02/18/96 843 02/19/96 842 02/20/96 843 02/21/96 838 02/22/96 414 02/23/96 0 02/24/96 0 02/25/96 484 02/26/96 846 02/27/96 836 02/28/96 854 02/29/96 844

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT 1 DATE: March 11, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Down Event Report

//

System Code'omponent Code'ause & Corrective Action to Prevent Recurrence 2/8/96 0.0 N/A HF HTEXCH Unit 1 reduced power for waterbox cleaning.

2/22/96 3.2 N/A RC CONROD Unit I reduced power to due to dropped control element assembly.

2/22/96 63.6 96-002 RC CONROD Unit 1 removed from service due to dropped control element assembly.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training ttt, License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain)

NI5sr FFt

OPERATING DATA REPORT DOCKET NO 50 " 389 DATE 3/ 6/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: FEBRUARY 1996
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM.DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

S INCE LAST REPORTS GIVE REASONS

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10 REASONS FOR RESTRI CT IONS i I F ANY MONTHLY - YTD- CUMULATIVE
11. HOURS IN REPORT PERIOD: 696 1440 110137.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 696.0 1396.9 92267.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 696.0 1296.8 90735.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1866281 3356914 235819636
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 620620 1115020 78175690
18. NET ELECTRICAL ENERGY GENERATED (MWH) 588788 1051424 73842092
19. UNIT SERVICE FACTOR 100.0 90.1 82.4
20. UNIT AVAILABILITYFACTOR 100. 0 90.1 82.4 21 'APACITY FACTOR (USING MDC NET) 100.8 87.0 80.7
22. CAPACITY FACTOR (USING DER NET) 101.9 88.0 81.2
23. UNIT FORCED OUTAGE RATE 0.0 3.4 6.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.: 50-389 UNIT: St. Lucie g2 DATE: March 11, 1996 COMPLETED BY: Z.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month of February.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT: St. Luci.e 52 DATE: March 11, 1996 COMPLETED BY: J.A ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) 02/01/96 849 02/02/96 849 02/03/96 849 02/04/96 853 02/05/96 855 02/06/96 856 02/07/96 856 02/08/96 859 02/09/96 857 02/10/96 847 02/11/96 846 02/12/96 845 02/13/96 847 02/14/96 848 02/15/96 847 02/16/96 842 02/17/96 848 02/18/96 847 02/19/96 848 02/20/96 855 02/21/96 816 02/22/96 839 02/23/96 834 02/24/96 839 02/25/96 834 02/26/96 829 02/27/96 832 02/28/96 853 02/29/96 855

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: March 11, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Down Event Report

¹ System Code'omponent Code'ause & Corrective Action to Prevent Recurrence Unit 2 operated at full power for the entire month.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training th License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) 0915sr Fpt.

e. 0-y