ML17228B420
| ML17228B420 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/29/1996 |
| From: | Bohlke W, Rogers J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-96-65, NUDOCS 9603210192 | |
| Download: ML17228B420 (13) | |
Text
CATEGORY. j.
REGULRTie INFORMATION DISTRIBUTIONOISTEM (RIDE)
ACCESSION NBR:9603310192 DOC.DATE: 96/02/29 NOTARIZED:
NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-359 St. Lucie Plant, Unit 2, Flor'da Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION ROGERS,J.AD Florida Power
& Light Co.
BOHLKE,H.H.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
SUBJECT:
Monthly operating repts for Feb 1996 for St Lucie Units 1
2.W/960312 ltr.
DISTRIBUTION CODE: IE24D.
COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS RGN2 EXTERNAL: LITCO BRYCEFJ H
NRC PDR COPIES LTTR ENCL 1
1 10 10 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL MRXDSM RECXPXENTSl PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN GD 5(EKT. 416"20S3)
TO ELXMXNATB YOUR NAME FROM DXSTRXBUTXON LXSTS FOR DOCUMENTS YOU DON'T NBEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL
.19
N
Florida Power & Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 L-96-65 10 CFR 50.36 NAR 12 1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the February
- 1996, Operating
- Data, Summary of Operating Experience, Average Daily Unit Power
- Level, and Unit Shutdowns and Power Reductions Reports for St.. Lucie'nits 1 and 2.
Should there be any questions on this information, please contact us
~
Very truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/SL Attachments cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9'f AAo>
9i0321O>m 9eOaV9 PDR ADaCK OSOOO33S R
POR an FPL Group company
4 qpaf 'J~
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 - 335 DATE 3/ 6/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432
- 1. UNIT NAME:
ST.
LUCZE UNIT 1 2.
REPORTING PERIOD:
FEBRUARY 1996 3.
LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUMDEPENDABLE CAPACITY (GROSS MWE):
872 7.
MAXIMUMDEPENDABLE CAPACITY (NET MWE):
839
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9
~
POWER LEVEL TO WHICH RESTRICTED ~ IF ANY (NET MWE) 10.
REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY "YTD" CUMULATIVE 11.
HOURS IN REPORT PERIOD:
12.
NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS, GENERATOR ON-LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
CAPACITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS Refueling and Maintenance
- April 29, 1996 696 657.8 0.0 632.4 0.0 1656379 541339 510704 90.9 90.9 87.5 88.4 9.1 1440 1401. 8 0.0 1376.4 0.0 3655403 1191589 1127346 95.6 95.6 93.3 94.3 4.4 168240.0 131441. 8 205. 3 129998.0 0.0 337132192 111180609 105072619 77.3 77.3 76.5 76.0 5.1 2 5 IF SHUT DOWN AT END OF REPORT PERIOD
~
ESTIMATED DATE OF STARTUP '
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie gl March 11, 1996 J'.A.ROGERS (407) 467-7296 REPORT MONTH Unit 1 operated at full power for the first week of the month.
The unit reduced power for waterbox cleaning February 8 through 10.
On February 22, the unit downpowered to recover a dropped control element assembly (CEA).
The unit was manually tripped and the CEA power supply was replaced.
The unit was returned to service on February 25.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
UNIT:
DATE COMPLETED BY:
TELEPHONE:
50-335 St. Lucie g1 March 11, 1996 Z.A.ROGERS (407) 467-7296 MONTH DAY 02/01/96 02/02/96 02/03/96 02/04/96 02/05/96 02/06/96 02/07/96 02/08/96 02/09/96 02/10/96 02/11/96 02/12/96 02/13/96 02/14/96 02/15/96 02/16/96 02/17/96 02/18/96 02/19/96 02/20/96 02/21/96 02/22/96 02/23/96 02/24/96 02/25/96 02/26/96 02/27/96 02/28/96 02/29/96 AVERAGE DAILY POWER LEVEL (MWe-Net) 821 817 819 817 831 835 839 795 557 715 835 834 838 833 837 835 842 843 842 843 838 414 0
0 484 846 836 854 844
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNITNAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 ST LUCIE UNIT 1 March 11, 1996 J.A.ROGERS (407) 467-7296 REPORT MONTH No.
Date Type Duration (Hours)
Reason'ethod of Shutting Down Reactor'icensee Event Report
//
System Code'omponent Code'ause
& Corrective Action to Prevent Recurrence 2/8/96 0.0 N/A HF HTEXCH Unit 1 reduced power for waterbox cleaning.
2/22/96 3.2 N/A RC CONROD Unit I reduced power to due to dropped control element assembly.
2/22/96 63.6 96-002 RC CONROD Unit 1 removed from service due to dropped control element assembly.
F Forced S
Scheduled Reason A - Equipment failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training ttt, License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG4161)
Exhibit I - Same Source NI5sr FFt
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 " 389 DATE 3/ 6/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432
- 1. UNIT NAME:
ST.
LUCIE UNIT 2 2.
REPORTING PERIOD:
FEBRUARY 1996 3.
LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUMDEPENDABLE CAPACITY (GROSS MWE):
882 7.
MAXIMUM.DEPENDABLE CAPACITY (NET MWE):
839
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
S INCE LAST REPORTS GIVE REASONS 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 1 0 REASONS FOR RESTRI CTIONS i IF ANY MONTHLY
-YTD-CUMULATIVE 11.
HOURS IN REPORT PERIOD:
12.
NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS GENERATOR ON-LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21 'APACITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 696 696.0 0.0 696.0 0.0 1866281 620620 588788 100.0 100. 0 100.8 101.9 0.0 1440 1396.9 0.0 1296.8 0.0 3356914 1115020 1051424 90.1 90.1 87.0 88.0 3.4 110137.0 92267.5 0.0 90735.5 0.0 235819636 78175690 73842092 82.4 82.4 80.7 81.2 6.6
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie g2 March 11, 1996 Z.A.ROGERS (407) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month of February.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Luci.e 52 March 11, 1996 J.A ROGERS (407) 467-7296 DAY 02/01/96 02/02/96 02/03/96 02/04/96 02/05/96 02/06/96 02/07/96 02/08/96 02/09/96 02/10/96 02/11/96 02/12/96 02/13/96 02/14/96 02/15/96 02/16/96 02/17/96 02/18/96 02/19/96 02/20/96 02/21/96 02/22/96 02/23/96 02/24/96 02/25/96 02/26/96 02/27/96 02/28/96 02/29/96 MONTH AVERAGE DAILY POWER LEVEL (Mwe-Net) 849 849 849 853 855 856 856 859 857 847 846 845 847 848 847 842 848 847 848 855 816 839 834 839 834 829 832 853 855
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNITNAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 ST LUCIE UNIT 2 March 11, 1996 J.A.ROGERS (407) 467-7296 REPORT MONTH No.
Date Type Duration (Hours)
Reason'ethod of Shutting Down Reactor'icensee Event Report
¹ System Code'omponent Code'ause
& Corrective Action to Prevent Recurrence Unit 2 operated at full power for the entire month.
F Forced S Scheduled Reason A - Equipment failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training th License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG4161)
Exhibit I - Same Source 0915sr Fpt.
e.
0-y