ML17229A171

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr
ML17229A171
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/1996
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-325, NUDOCS 9612230051
Download: ML17229A171 (14)


Text

CATEGORY 1 i u REGULATO INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION.NBR:9612230051 'OC.DATE: 96/11/30 NOTARIZED: NO DOCKET I FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power & fight Co.

STALL,J.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Nov 1996 for St.Lucie Units 1 & 2.W/961216 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

G RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 WIENS,L. 1 1 INTERNA 1 1 AEOD/SPD/RRAB 1 1 ILE CENTER 01 1 1 NRR/DRPM/PECB 1 1 OC/DBA PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 41S-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL . 11

Florida Power & Light Company, P.O. Box128, Fort Pierce, FL34S54.0128 December 16, 1996 L-96-325 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the November 1996, Operating Data Report, Summary of Operating Experience Reports, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie II, USNRC 9hi223005f 961130 PDR ADOCK 05000335 PDR an FPL Group company

~ ~

7

'I y F

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 12/05/96 FPL LICENSING GROUP - PSL TELEPHONE 561/467/7296 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: NOVEMBER 1996
3. LICENSED THERMAL POWER (MWT): 2700 4, NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720.0 8040.0 174840.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5883.7 135923.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 720.0 5737.6 134359.2
15. UNZT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1918570 14877282 348353971
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 635420 4872760 114861780
18. NET ELECTRICAL ENERGY GENERATED (MWH) 603328 4598945 108544218
19. UNIT SERVICE FACTOR 100.0 71.4 76.9
20. UNIT AVAILABILITYFACTOR 100. 0 71.4 76.9
21. CAPACITY FACTOR (USING MDC NET) 99.9 68.2 74.0
22. CAPACITY FACTOR (USING DER NET) 101. 0 68.9 74.8
23. UNIT FORCED OUTAGE RATE 0.0 3.1 5.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AVERAGE DAILY T POWER LEVEL DOCKET NO. 50 - 335 UNIT Saini Lucio //1 DATE Dec 06, 1996 COMPLETED BY J.A. Rogers TELEPHONE I561) 467 - 7296 MONTH November, 1996 DAY AVERAGE DAILY POWER LEVEL IMWe-Net) 11/01/96 844 11/02/96 846 11/03/96 846 11/04/96 547 11/05/96 825 1 1/06/96 846 11/07/96 815 11/08/96 845 11/09/96 847 11/10/96 849 11/11/96 851 11/12/96 853 11/13/96 853 11/14/96 853 11/15/96 853 11/16/96 849 1 1/17/96 857 11/18/96 853 11/19/96 851 11/20/96 848 11/21/96 851 11/22/96 847 1 1/23/96 850 11/24/96 849 11/25/96 851 11/26/96 853 11/27/96 848 11/28/96 852 11/29/96 853 11/30/96 855

UNTT SHUTDOWNS AND POWER REDUCTlONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT.1 DATE: December 5, 1996 COMPLETED BY: J.A. Rogers TELEPHONE: (407)467-7296 REPORT MONTH v NO. Date Type'uration Reason'ethod of System Code'omponent Cause & Corrective (Hours) Shutting Reactor'icenseeEvent Codes Action to=

Down Report I Prevent Recurrence 18 Za/4/g6 0.0 N/A HF HTEXCH Unit 1 downpowered to approximately 62%

power to clean lA turbine cooling water heat exchanger.

4 F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG-0161)

D - Regulatory restriction 4 - Continued E - Operator Training a License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain) 099991 FÃr

1 VMMARX OF OPERATI EXPE IE E DOCKET NO.: 50-335 UNIT: St. Lucie 51 DATE: December 5, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ov mber 1 6 Unit 1 operated at essentially full power through November 4. On November 4 the unit downpowered to approximately 60% power to clean the 1A turbine cooling water heat exchanger. On November 5 the unit returned to full power operation.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 12/05/96 FPL LICENSING GROUP - PSL TELEPHONE 561/467/7296 OPERATING STATUS UNIT NAME: ST. LUCIE UNIT 2 REPORTING PERIOD: NOVEMBER 1996 LICENSED THERMAL POWER (MWT): 2700 NAMEPLATE RATING (GROSS MWE): 850 DESIGN ELECTRICAL RATING (NET MWE): 830 MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 882 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 IF CHANGES, OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 ' 8040.0 116737. 0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7831.6 98702.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 720.0 7701.5 97140.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1939625 20384403 252847125
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 638060 6717580 87778250
18. NET ELECTRICAL ENERGY GENERATED (MWH) 605351 6358291 79140959
19. UNIT SERVICE FACTOR 100 95.8 83.2
20. UNIT AVAILABILITYFACTOR 100 95.8 83.2
21. CAPACITY FACTOR (USING MDC NET) 100.2 94.3 80.8
22. CAPACITY FACTOR (USING DER NET) 101.3 95.3 81.7
23. UNIT FORCED OUTAGE RATE 0.0 3.0 6.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: April 15, 1997 Refueling & Maintenance
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AVERAGE DAILY T POWER LEVEL

~ ~

DOCKET NO. 50 - 389 UNIT Saint Lucio //2 DATE Doc 06, 1996 COMPLETED BY J.A.Rogers TELEPHONE I561) 467 - 7296 MONTH Novemher, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe.Not) 1 1/01/96 838 11/02/96 839 11/03/96 840 11/04/96 841 11/05/96 811 11/06/96 838 11/07/96 840 11/08/96 840 1 1/09/96 841 1 1/10/96 842 1 1/11/96 844 11/12/96 844 11/13/96 846 1 1/14/96 845 11/15/96 844 1 1/16/96 845 1 1/17/96 846 11/18/96 845 1 1/19/96 843 1 1/20/96 843 1 1/21/96 841 11/22/96 840 11/23/96 841 1 1/24/96 843 1 1/25/96 828 11/26/96 842 11/27/96 842 11/28/96 844 1 1/29/96 841 11/30/96 845

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 ~

DATE: November 4, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH v mber No. Date Type'uration (Hours)

Reason'ethod of Shutting Reactor'icenseeEvent System Code'omponentCode'ause & Corrective Action to Down Report ¹ Prevent Recurrence Unit 2 operated at full power for the entire month.

F Forced Reason Method Exhibit G - Xnstructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG-0161)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit ) - Same Source G - Operational Error (Exp)ain)

H - Other (Explain) 091$ $ 7 FtL

~ ~

UMMARY OF OPERATI G EXPERIE C DOCKET NO.: 50-389 UNIT: St. Luci.e 42 DATE: December 6, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH o embe 1 Unit 2 operated at essentially full power for the entire month In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

~'

I I