ML17228B465

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for March 1996 for Slp
ML17228B465
Person / Time
Site: Saint Lucie  
Issue date: 03/31/1996
From: Bohlke W, Rogers J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-95, NUDOCS 9604190139
Download: ML17228B465 (18)


Text

CATEGORY 1 REGULQT INFORMATION DISTRIBUTION ~ZSTEM (RIDS)

ACC'-.SSXON 'NBA:9604190139 DOC.DATE,: 96/03/31 NOTARIZED:

NO FACIES.'50-335 St!. Lucie:, Plant, Unit: l, Florida<TPower S Light Co.

50-389 St. Luci'e',Plant.,

Unit. 2, Florida Power s Light Co.

AUTH.NAME AUTHOR AFFILIATION ROGE'RS,J.A.

Florida Power s

L ght Co.

BOHLKE,W.H.

Florida Power s Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389 SUBJECT.: Monthly operating repts for March 1996 for SLP.W/960412 ltr.

DISTRIBUTION CODE:

ZE24D COPIES RECEIVED:LTR I

ENCL I

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL'SS~.

L

~Nag 1

RGN2 EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN SD-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL 19

Florida Power &Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 f4 1 2 l996 L-96-95 10 CFR 50.36 U.

S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the March

1996, Operating
Data, Summary of Operating Experience, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us

~

Ve truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/SL Attachments cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant

) ARAN.

9604i90i39 96033i PDR ADQCK 05000335 PDR an FPL Group company

<i~

C' v

4 J'

OPERATING DATA RBPORT OPERATING STATUS DOCKET NO 50 - 335 DATE 4/ 4/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432

1. UNIT NAME:

ST.

LUCIE UNIT 1 2.

REPORTING PERIOD:

HARCH 1996 3.

LICENSED THERMAL POWER (MWT):

2700 4,

NAMEPLATB RATING (GROSS MWE):

850 5.

DESIGN ELECTRICAL RATING (NBT MWE):

830 6.

MAXIMUM DBPBNDABLB CAPACITY (GROSS MWE):

872 7.

MAXIMUM DEPENDABLE CAPACITY (NBT HWE):

839 8.

ZF Ci(ANGES OCCUR ZN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, ZF ANY (NET MWE) 10.

RBASONS POR RESTRZCTZONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE 11.

HOURS ZN REPORT PERIOD:

12.

NUMBER OF HOURS REACTOR WAS CRITICAL 13.

RBACTOR RBSERVE SHUTDOWN HOURS 14.

HOURS GENBRATOR ON-LINE

15. UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GENERATED (MWH) 17.

GROSS BLBCTRICAL ENERGY GENERATED (MWH) 18.

NET ELECTRICAL ENERGY GENERATED (HWH)

19. UNIT SERVICE PACTOR
20. UNIT AVAILABILITYPACTOR 21.

CAPACITY FACTOR (USING MDC NET) 22.

CAPACITY PACTOR (USING DER NET)

23. UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHEDULBD OVER NEXT 6 MONTHS Refueling and Maintenance

- April 29, 744 744.0 0.0 744.0 0.0 1924701 632781 599307 100. 0 100.0 96.0 97.1 0.0 1996 2184 2145. 8 0.0 2120.4 0.0 5580104 1824370 1726653

97. 1
97. 1 94.2 95.3 2.9 168984.0 132185.8 205.3 130742.0 0.0 339056893 111813390 105671926 77.4 77.4 76.6
76. 1 5.1 25.

ZF SHUT DOWN AT END OP RBPORT PERIOD, ESTIMATED DATE OF STARZUP:

c

(

~

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie 51 April 4, 1996 O'.A.ROGERS (407) 467-7296 REPORT MONTH Unit 1 operated at full power throughout most of the month.

The unit operated at reduced power for waterbox cleaning during the period of March 24 through March 29.

The unit returned to full power on March 29.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

~

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT:

DATE COMPLETED BY:

TELEPHONE:

50-335 St. Lucie 51 April 3, 1996 J.A.ROGERS (407) 467-7296 MONTH DAY 03/01/96 03/02/96 03/03/96 03/04/96 03/05/96 03/06/96 03/07/96 03/08/96 03/09/96 03/10/96 03/11/96 03/12/96 03/13/96 03/14/96 03/15/96 03/16/96 03/17/96 03/18/96 03/19/96 03/20/96 03/21/96 03/22/96 03/23/96 03/24/96 03/25/96 03/26/96 03/27/96 03/28/96 03/29/96 03/30/96 03/31/96 AVERAGE DAILY POWER LEVEL (MWe-Net) 839 845 843 843 842 846 839 840 843 833 830 838 850 846 842 837 833 840 841 842 839 841 838 784 481 513 680 710 776 849 849

0

/

~

II J

I n'I 4I t

UNIT SHU~TDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNITNAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 ST LUCIE UNIT 1 April 4, 1996.

J.A.ROGERS (407) 467-7296 REPORT MONTHhfgz3~ti No.

Date Type Duration (Hours)

Reason'ethod of Shutting Down Reactor'icensee Event Report

//

System Code'omponent Code'ause

& Corrective Action to Prevent Recurrence 3/24/96 0.0 B

N/A HF HTEXCH Unit I reduced power for waterbox cleaning.

F Forced S

Scheduled Reason A - Equipment failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training 4 License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

Exhibit G - Instructions for Preparation ofData Enny Sheets Licensee Event Report (LER) File (NUREG4I161)

Exhibit I - Same Source oslsss Fpt.

~

~

~

~

I

OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 - 389 DATE 4/ <</96 PPL LICENSING GROUP - ilUNO TELEPHONE 407/694/4432

1. UNIT NAME:

ST.

LUCIS UNIT 2 2.

RBPORTING PERIOD:

MARCH 1996 3.

LICENSED THERMAL POWER (MWT):

2700 4.

NAHEPLATB RATING (GROSS MWB):

850 5.

DBSZGN ELECTRICAI RATING (NET MWB):

830 6.

MAXIMUMDBPBNDABLE CAPACITY (GROSS MWE):

882 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWB):

839 8 ~

ZF CHANGES OCCUR IN CAPACITY RATINGS (ZTBMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RBSTRICTED, IF ANY (NET MWE) 10.

REASONS FOR RESTRICTIONS, ZP ANY:

MONTHLY,

-YTD-CUMULATIVE 11.

HOURS IN RBPORT PERIOD:

12.

NUMBER OF HOURS RBACTOR WAS CRITICAL 13.

REACTOR RESERVE SHUTDOWN HOURS 14.

HOURS GENBRATOR ON-LINE

15. UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GENERATED (MWH) 17.

GROSS ELECTRICAL ENERGY GENERATED (HWH) 18.

NET ELECTRICAL ENERGY GENBRATBD (HWH)

19. UNIT SBRVICB FACTOR
20. UNIT AVAILABILITYFACTOR 21.

CAPACITY PACTOR (USING MDC NET) 22.

CAPACITY FACTOR (USING DER NET)

23. UNIT FORCED OUTAGB RATB 24.

SHUTDOWNS SCHEDULED OVBR NEXT 6 MONTHS 744 744. 0 0.0 744.0 0.0 1997485 668680 634666 100. 0 100.0 101 ~ 7 102.8 0.0 2184 2140. 9 0.0 2040.8 0.0 5354398 1783700 1686090 93.4 93.4 92.0 93.0 2.2 110881. 0 93011. 5 0.0 91479. 5 0.0 237817120 78844370 74476758 82.5 82.5 80.9 81.3 6.6

25. IP SHUT DO'Af AT END OF REPORT PERIOD, BSTZMATED DATE OF STARTUP:

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 St. Lucie ¹2 April 4, 1996 aT.A.ROGERS (407) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month of March.

In accordance with the recgxirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

~

C

-P

~

~

~ ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 St. Lucie ¹2 Apri1 3, 1996 aT.A ROGERS (407) 467-7296 DAY 03/01/96 03/02/96 03/03/96 03/04/96 03/05/96 03/06/96 03/07/96 03/08/96 03/09/96 03/10/96 03/11/96 03/12/96 03/13/96 03/14/96 03/15/96 03/16/96 03/17/96 03/18/96 03/19/96 03/20/96 03/21/96 03/22/96 03/23/96 03/24/96 03/25/96 03/26/96 03/27/96 03/28/96 03/29/96 03/30/9'6 03/31/96 MONTH AVERAGE DAILY POWER LEVEL (Mwe-Net) 851 856 855 854 856 855 856 853 854 854 855 855 856 858 854 848 850 853 854 851 854 853 853 851 844 851 855 850 858 847 848

t

t. N

\\

k

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNITNAME:

DATE:

COMPLETED BY TELEPHONE:

50-339 t

ST LUCIE UNIT 2 April 4, 1996; J.A.ROGERS (407) 467-7296 REPORT MONTHMllK~l225 No.

Date Type Duration (Hours)

Reason'ethod of Shutting Down Reactor'icensee Event Report System Code'omponent Code'ause

&Corrective Action to Prevent Recurrence Unit 2 operated at full power for the entire month.

F Forced S

Scheduled Reason A - Equipmcnt failum (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training 4 License Examination F - Administrative G - Operational Error (Exp!ain)

H - Other (Explain)

Method 1 - Manual 2 - Manual See 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Shccts Licensee Event Report (LER) File (NURE64161) 5 Exhibit 1 - Same Source tslssr FPt.

<<t

/

II X

'I+

r'

,I E