ML17228B465

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr
ML17228B465
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/31/1996
From: Bohlke W, Rogers J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-95, NUDOCS 9604190139
Download: ML17228B465 (18)


Text

CATEGORY 1 REGULQT ... INFORMATION DISTRIBUTION ~ZSTEM (RIDS)

ACC'-.SSXON 'NBA:9604190139 DOC.DATE,: 96/03/31 NOTARIZED: NO DOCKET FACIES.'50-335 St!. Lucie:, Plant, Unit: l, Florida<TPower S Light Co. 05000335 50-389 St. Luci'e',Plant., Unit. 2, Florida Power s Light Co. 05000389 AUTH.NAME AUTHOR AFFILIATION ROGE'RS,J.A. Florida Power s L ght Co.

BOHLKE,W.H. Florida Power s Light Co.

RECIP.NAME RECIPIENT AFFILIATION SUBJECT.: Monthly operating repts for March 1996 for SLP.W/960412 ltr.

DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR I ENCL I SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL 'SS~. 10 10 AEOD/SPD/RRAB 1 1 L ~Nag 1 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19

Florida Power & Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 f4 1 2 l996 L-96-95 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the March 1996, Operating Data, Summary of Operating Experience, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Ve truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/SL Attachments cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC

) ARAN.

9604i90i39 96033i PDR ADQCK 05000335 PDR '

an FPL Group company

<i~

C' v

4 J'

OPERATING DATA RBPORT DOCKET NO 50 - 335 DATE 4/ 4/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: HARCH 1996
3. LICENSED THERMAL POWER (MWT): 2700 4, NAMEPLATB RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NBT MWE): 830
6. MAXIMUM DBPBNDABLB CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NBT HWE): 839
8. ZF Ci(ANGES OCCUR ZN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, ZF ANY (NET MWE)
10. RBASONS POR RESTRZCTZONS, IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOURS ZN REPORT PERIOD: 744 2184 168984.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2145. 8 132185.8
13. RBACTOR RBSERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENBRATOR ON-LINE 744.0 2120.4 130742.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1924701 5580104 339056893
17. GROSS BLBCTRICAL ENERGY GENERATED (MWH) 632781 1824370 111813390
18. NET ELECTRICAL ENERGY GENERATED (HWH) 599307 1726653 105671926
19. UNIT SERVICE PACTOR 100. 0 97. 1 77.4
20. UNIT AVAILABILITYPACTOR 100.0 97. 1 77.4
21. CAPACITY FACTOR (USING MDC NET) 96.0 94.2 76.6
22. CAPACITY PACTOR (USING DER NET) 97.1 95.3 76. 1
23. UNIT FORCED OUTAGE RATE 0.0 2.9 5.1
24. SHUTDOWNS SCHEDULBD OVER NEXT 6 MONTHS Refueling and Maintenance - April 29, 1996
25. ZF SHUT DOWN AT END OP RBPORT PERIOD, ESTIMATED DATE OF STARZUP:

c

( ~

DOCKET NO.: 50-335 UNIT: St. Lucie 51 DATE: April 4, 1996 COMPLETED BY: O'.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 1 operated at full power throughout most of the month. The unit operated at reduced power for waterbox cleaning during the period of March 24 through March 29. The unit returned to full power on March 29.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

~ ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT: St. Lucie 51 DATE April 3, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/96 839 03/02/96 845 03/03/96 843 03/04/96 843 03/05/96 842 03/06/96 846 03/07/96 839 03/08/96 840 03/09/96 843 03/10/96 833 03/11/96 830 03/12/96 838 03/13/96 850 03/14/96 846 03/15/96 842 03/16/96 837 03/17/96 833 03/18/96 840 03/19/96 841 03/20/96 842 03/21/96 839 03/22/96 841 03/23/96 838 03/24/96 784 03/25/96 481 03/26/96 513 03/27/96 680 03/28/96 710 03/29/96 776 03/30/96 849 03/31/96 849

0 / ~

II n'I J

I 4I t

UNIT SHU~TDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT 1 DATE: April 4, 1996 .

COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH hfgz3~ti No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Down Event Report

//

System Code'omponent Code'ause & Corrective Action to Prevent Recurrence 3/24/96 0.0 B N/A HF HTEXCH Unit I reduced power for waterbox cleaning.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Preparation of Data Enny B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4I161)

D - Regulatory restriction 4 - Continued E - Operator Training 4 License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) oslsss Fpt.

~ ~

~ ~

I

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 4/ <</96 PPL LICENSING GROUP - ilUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIS UNIT 2
2. RBPORTING PERIOD: MARCH 1996
3. LICENSED THERMAL POWER (MWT): 2700
4. NAHEPLATB RATING (GROSS MWB): 850
5. DBSZGN ELECTRICAI RATING (NET MWB): 830
6. MAXIMUM DBPBNDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWB): 839 8 ~ ZF CHANGES OCCUR IN CAPACITY RATINGS (ZTBMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RBSTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, ZP ANY:

MONTHLY, -YTD- CUMULATIVE

11. HOURS IN RBPORT PERIOD: 744 2184 110881. 0
12. NUMBER OF HOURS RBACTOR WAS CRITICAL 744. 0 2140. 9 93011. 5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENBRATOR ON-LINE 744.0 2040.8 91479. 5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1997485 5354398 237817120
17. GROSS ELECTRICAL ENERGY GENERATED (HWH) 668680 1783700 78844370
18. NET ELECTRICAL ENERGY GENBRATBD (HWH) 634666 1686090 74476758
19. UNIT SBRVICB FACTOR 100. 0 93.4 82.5
20. UNIT AVAILABILITYFACTOR 100.0 93.4 82.5
21. CAPACITY PACTOR (USING MDC NET) 101 ~ 7 92.0 80.9
22. CAPACITY FACTOR (USING DER NET) 102.8 93.0 81.3
23. UNIT FORCED OUTAGB RATB 0.0 2.2 6.6
24. SHUTDOWNS SCHEDULED OVBR NEXT 6 MONTHS
25. IP SHUT DO'Af AT END OF REPORT PERIOD, BSTZMATED DATE OF STARTUP:

DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: April 4, 1996 COMPLETED BY: aT.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month of March.

In accordance with the recgxirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

~ C

-P

~ ~~ ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: Apri1 3, 1996 COMPLETED BY: aT.A ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) 03/01/96 851 03/02/96 856 03/03/96 855 03/04/96 854 03/05/96 856 03/06/96 855 03/07/96 856 03/08/96 853 03/09/96 854 03/10/96 854 03/11/96 855 03/12/96 855 03/13/96 856 03/14/96 858 03/15/96 854 03/16/96 848 03/17/96 850 03/18/96 853 03/19/96 854 03/20/96 851 03/21/96 854 03/22/96 853 03/23/96 853 03/24/96 851 03/25/96 844 03/26/96 851 03/27/96 855 03/28/96 850 03/29/96 858 03/30/9'6 847 03/31/96 848

t

t. N

\

k

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-339 t UNIT NAME: ST LUCIE UNIT 2 DATE: April 4, 1996; COMPLETED BY J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH MllK~l225 No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down Prevent Recurrence Unit 2 operated at full power for the entire month.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipmcnt failum (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual See Shccts Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NURE64161)

D - Regulatory restriction 4 - Continued E - Operator Training 4 License Examination 5 - Load Reduction 5 F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Exp!ain)

H - Other (Explain) tslssr FPt.

<<t X

/ II

'I+

r'

,I E