ML17229A136

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2
ML17229A136
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/31/1996
From: Rogers J
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17229A137 List:
References
NUDOCS 9611190301
Download: ML17229A136 (7)


Text

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 11/04/96 FPL LICENSING GROUP - PSL TELEPHONE 561/467/7073 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: OCTOBER 1996
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 872
7. "MAXIMUMDEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9 POWER LEVEL TO WHICH RESTRICTED'F ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, ZF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 745.0 7320.0 174120.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 5163.7 135203.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 745.0 5017.6 133639.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1983487 12958712 346435401
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 652660 4237340 114226360
18. NET ELECTRICAL ENERGY GENERATED (MWH) 619473 3995617 107940890
19. UNIT SERVICE FACTOR 100.0 68.5 76.8
20. UNIT AVAILABILITYFACTOR 100.0 68.5 76.8
21. CAPACITY FACTOR (USING MDC NET) 99.1 65.1 73.9
22. CAPACITY FACTOR (USING DER NET) 100.2 65.8 74.7
23. UNIT FORCED OUTAGE RATE 0.0 3.6 5.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

vsiaiioiax vixsxs (t PDR ADQCK 05000335 R PDR

AVERAGE DAILY POWER LEVEL DOCKET NO. 50 - 335 UNIT Saint Lucio //1 DATE Nov 04, 1996 COMPLETED BY xxxxxxxxxxxxxxxxxxx TELEPHONE I000) 000 - 0000 MONTH October 1996 DAY AVERAGE DAILY POWER LEVEL IMWe-Not) 10/01/96 839 10/02/96 842 10/03/96 842 10/04/96 841 10/05/96 843 10/06/96 843 10/07/96 843 10/08/96 844 10/09/96 842 10/10/96 844 10/11/96 845 10/12/96 846 10/13/96 849 10/14/96 848 10/15/96 849 10/16/96 848 10/17/96 810 10/18/96 615 10/19/96 693 10/20/96 844 10/21/96 848 10/22/96 847 10/23/96 847 10/24/96 847 10/25/96 846 10/26/96 847 10/27/96 847 10/28/96 844 10/29/96 845 10/30/96 845 10/31/96 845

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335

~

UNIT NAME: ST LUCIE UNIX 1 DATE: November 4, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 .

0 ONE No. Date Type'uration (Hours)

Reasons Method of Shutting Reactor'icensee Event Report System Code'omponent Code'ause Ec Corrective Action to Down Prevent Recurrence 17 10/17/96 0.0 N/A HF HTEXCH Unit 1 downpowered to approximately 78% power due to a condenser tube leak.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Prcpamtion of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4I61)

D - Regulatory restriction 4 - Continued E - Operator Training tb License Examination 5 - Load Reduction 5 F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) oslssr Fpl

DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: November 4, 1996 COMPLETED BY: Z.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Unit 1 operated at essentially full power through October 17. On October 17 the unit downpowered to approximately 78% power to repair a condenser tube leak. On October 19 the unit returned to full power operation.

1n accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 11/04/96 FPL LICENSING GROUP - PSL TELEPHONE 561/467/7073 OPERATING STATUS UNIT NAME: ST. LUCIE UNIT 2 REPORTING PERIOD: OCTOBER 1996 LICENSED THERMAL POWER (MWT): 2700 NAMEPLATE RATING (GROSS MWE): 850 DESIGN ELECTRICAL RATING (NET MWE): 830 MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 882 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 IF CHANGES OCCUR IN CAPACITY RATZNGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9 I I POWER LEVEL TO WH CH RESTR CTED g Z F ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 745.0 7320.0 116017.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7111.6 97982.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 745.0 6981.5 96420.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2009207 18444778 250907500
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 657760 6079520 83140190
18. NET ELECTRICAL ENERGY GENERATED (MWH) 623933 5752940 78543608
19. UNIT SERVICE FACTOR 100 95.4 83.1
20. UNIT AVAILABILITYFACTOR 100 95.4 83. 1
21. CAPACITY FACTOR (USING MDC NET) 99.8 93.7 80.7
22. CAPACITY FACTOR (USING DER NET) 100.9 94.7 81.6
23. UNIT FORCED OUTAGE RATE 0.0 3.3 6.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: April 15, 1997 Refueling & Maintenance
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AVERAGE DAILY 7 POWER LEVEL DOCKET NO. 50 - 389 UNIT Saint Lucis ¹2 DATE Nov 04, 1996 COMPLETED BY xxxxxxxxxxxxxxxxxxx TELEPHONE (000) 000 - 0000 MONTH October, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/96 835 10/02/96 835 10/03/96 838 10/04/96 832 10/05/96 838 10/06/96 827 10/07/96 850 10/08/96 838 10/09/96 837 10/10/96 839 10/11/96 838 10/12/96 842 10/13/96 840 10/14/96 841 10/15/96 840 10/16/96 839 10/17/96 838 10/18/96 837 10/19/96 839 10/20/96 840 ~

10/21/96 841 10/22/96 841 10/23/96 839 10/24/96 840 10/25/96 835 10/26/96 839 10/27/96 838 10/28/96 836 10/29/96 820 10/30/96 832 10/31/96 837

UNIT SHUTDOWNS AND POWER'REDUCTIONS DOCKET NO.: 50-339 UNIT NAME: ST LUCIE UN' DATE:

November 4, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 ~

REPORT MONTH Qgfgbg~

No. Date Type Duration (Hours)

Reasons Method of Shutting Reactor'icensee Down Event Report System Code'omponent Code'ause 8c Corrective Action to Prevent Recurrence Unit 2 operated at full power for the entire month.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training k License Examination 5 - Load Reduction 5 F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) 09lssr Frt.