ML17229A399

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr
ML17229A399
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/30/1997
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-178, NUDOCS 9707150348
Download: ML17229A399 (13)


Text

CATEGORY 1 REGULATC INFORMATION DISTRIBUTION STER (BIDS)

ACCESSION NBR:970 7150348 DOC.DATE: 97/06/30 NOTARIZED: NO DOCKET I FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. ,05000335 n 5,0-.389 St. Lucie Plant, Unit 2, Florida Power a Light Co. 05000389 AUTISM. gAME AUTHOR AFFIIIATION ROGERS,J.A. Florida Power a Light Co.

STALL,J.A. Florida Power s Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for June 1997 for St Lucie.W/970710 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL Monthly Operating Report (per Tech Specs)

SIZE:'ITLE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 WIENS,L. 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 LE CRN 01 1 1 NRR/DRPM/PECB 1 1 OC 1 1 RGN2 1 1

. EXTERNAL: LITCO BRYCEFJ H 1 1 NOAC 1 NRC PDR 1 1 NOTE TO ALL nRZDSn RECIPIENTS PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D"5(EXT. 415.-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL'l

/

1 11 I ~ I 3 I IR A

~

~

1 J

A H

Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL34S57 ml July 10, 1997 L-97-178 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2

~LR'Wa Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the June 1997, Operating Data Report, Summary of Operating Experience Report, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident, Inspector, USNRC, St. Lucie Plant lllllllllllllllllllllllllllllllJlllllll 9707i50348 970630 PDR" ADOCK 05000335 R PDR an FPL Group company

l f

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 07/01/97 FPL LICENSING GROUP - PSL TELEPHONE 561/467/7296 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: JUNE 1997
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, ZF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720.0 4343.0 179927.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4193. 5 140861.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 720.0 4179.0 139276.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1942678 11228927 361539910
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 635230 3695030 119213060
18. NET ELECTRICAL ENERGY GENERATED (MWH) 603028 3503772 112671085
19. UNIT SERVICE FACTOR 100 96.2 77.4
20. UNIT AVA1LABZLITYFACTOR 100 96.2 77.4
21. CAPACITY FACTOR (USING MDC NET) 99.8 96.2 74.6
22. CAPACITY FACTOR (USING DER NET) 100 97 ' 75.5
23. UNIT FORCED OUTAGE RATE 0.0 3.8 4.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: October 20, 1997 Refueling Outage
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

RY F PERAT EXPERIE CE DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: July 1, 1997 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 Unit 1 operated at essentially full power for the entire month of June.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAIL UNIT POWER LEVEL DOCKET NO. 50- 335 UNIT Saint Lucie ¹1 DATE Jul 01, 1997 COMPLETED BY J.A.ROGERS TELEPHONE (561) 467 - 7296 MONTH June, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe.Net) 06/01/97 839 06/02/97 841 06/03/97 846 06/04/97 836 06/05/97 833 06/06/97 837 06/07/97 837 06/08/97 836 06/09/97 839 06/10/97 839 06/11/97 836 06/12/97 828 06/13/97 839 06/14/97 840 06/15/97 842 06/16/97 840 06/17/97 837 06/18/97 838 06/19/97 837 06/20/97 839 06/21/97 837 06/22/97 834 06/23/97 848 06/24/97 830 06/25/97 832 06/26/97 836 06/27/97 838 06/28/97 839 06/29/97 839 06/30/97 836

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE .UNIT 1 ~

DATE: July 1, 1997 COMPLETED BY: J.A. Rogers TELEPHONE: (561)467-7296 No Date Type'uration (Hours)

Reason'ethod of Reactor'ystem Shutting Licensee Event Code'omponentCode'ause & Corrective Action to Down Report 5 Prevent Recurrence Unit 1 operated at essentially full power for the entire month of June.

F Forced Reason Method Exhibit G - Znstructions f'r S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG-0161)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

ONS47 PPT

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 07/01/97 FPL LICENSING GROUP - PSL TELEPHONE 561/467/7296 OPERATING STATUS UNIT NAME: ST. LUCIE UNIT 2

2. REPORTING PERIOD: JUNE 1997
3. LICENSED THERMAL POWER (MWT): 2700 4, NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR ZN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9 ~ POWER LEVEL TO WHICH RESTRICTED'F ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, ZF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720.0 4343.0 121824. 0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3378.3 102824.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LZNE 720.0 3339.4 101223.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1939625 8844550 263695682
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 640900 2905920 91344420
18. NET ELECTRICAL ENERGY GENERATED (MWH) 608100 2748383 82515853
19. UNIT SERVICE FACTOR 100.0 76.9 83.1
20. UNIT AVAILABILITYFACTOR 100.0 76 ' 83.1
21. CAPACITY FACTOR (USING MDC NET) 100.0 75.4 80.7
22. CAPACITY FACTOR (USING DER NET) 100.0 76.2 81.6
23. UNIT FORCED OUTAGE RATE 0.0 0.0 6.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

P T PE E DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: July 1, 1997 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month of June.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAI UNIT POWER LEVEL DOCKET NO. 50 - 389 UNIT Saint Lucio ¹2 DATE Jul 01, 1997 COMPLETED BY J.A. ROGERS TELEPHONE (561) 467 - 7296 MONTH Juno, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe.Not) 06/01/97 846 06/02/97 846 06/03/97 846 06/04/97 844 06/05/97 842 06/06/97 835 06/07/97 829 06/08/97 844 06/09/97 846 06/10/97 846 06/11/97 847 06/12/97 847 06/13/97 848 06/14/97 849 06/15/97 851 06/16/97 848 06/17/97 845 06/18/97 849 06/19/97 847 06/20/97 849 06/21/97 843 06/22/97 844 06/23/97 845 06/24/97 846 06/25/97 838 06/26/97 835 06/27/97 845 06/28/97 844 06/29/97 847 06/30/97 845

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT- 2 DATE: July 1,1997 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 No. Date Type'uration Reason'ethod of System Code'omponent Cause (* Corrective (Hours) Shutting Reactor'icenseeEvent Codes Action to Down Report I Prevent Recurrence Unit 2 operated at essentially full power for the entire month of June.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG-0161)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain) 091sss ppL