CATEGORY 1 REGULATO INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR:9704170116 DOG.DATE: 97/03/31 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.
Florida Power
& Light Co.
STALL,J.A.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
SUBJECT:
Monthly operating repts for Mar 1997 for St. Lucie, Units 1
& 2.W/970410 ltr.
'DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
E RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: ACRS LE CE E
01 OC/DBA PAD EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME WIENSiL.
AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 0
Y D
0' NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
N C
Florida Power &Light Company, 6501 South Ocean Orive, Jensen Beach, FL 34957 April 10, 1997 L-97-97 10 CFR 50.36 U.
S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the March
- 1997, Operating Data
- Report, Summary of Operating Experience
- Reports, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Should there be any questions on this information, please contact use V
Very truly yours, J.
A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9704i70116 970331 PDR ADQCK 05000335I 8
PDR an FPL Group company tt!!ti!Itj!I!t!!ltd!!'ll!!t!!t!!!
1 J3 ff
AVERAGE DAIL IT POWER LEVEL MONTH March, 1997 DOCKET NO.
50 - 335 UNIT Saint Lucio ¹1 DATE Apr 01, 1997 COMPLETED BY J. A. Rogers TELEPHONE (561) 467 - 7296 DAY 03/01/97 03/02/97 03/03/97 03/04/97 03/05/97 03/06/97 03/07/97 03/08/97 03/09/97 03/10/97 03/11/97 03/12/97 03/13/97 03/14/97 03/15/97 03/16/97 03/17/97 03/18/97 03/19/97 03/20/97 03/21/97 03/22/97 03/23/97 03/24/97 03/25/97 03/26/97 03/27/97 03/28/97 03/29/97 03/30/97 03/31/97 AVERAGE DAILY POWER LEVEL (MWo.Net) 846 844 847 424 0
0 322 830 844 845 844 843 844 845 845 844 845 845 845 844 845 846 845 844 845 844 842 843 842 843 843
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 - 335 DATE 04/03/97 FPL LICENSING GROUP
" PSL TELEPHONE 561/467/7296 UNIT NAME: ST.
LUCIE UNIT 1 REPORTING PERIOD:
MARCH 1997 LICENSED THERMAL POWER (MWT):
2700 NAMEPLATE RATING (GROSS MWE):
850 DESIGN ELECTRICAL RATING (NET MWE):
830 MAXIMUMDEPENDABLE CAPACITY (GROSS MWE):
872 MAXIMUMDEPENDABLE CAPACITY (NET MWE):
839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST
- REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 1 0 REASONS FOR RESTRICTIONS i IF ANY MONTHLY
-YTD-CUMULATIVE 11.
HOURS IN REPORT PERIOD:
12.
NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS GENERATOR ON LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
CAPACITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 744. 0 685.6 0.0 679.4 0.0 1806777 595420 563110 91.3 91.3 90.2 91.2 8.7 2160.0 2101.6 0.0 2095.4 0.0 5611455 1858240 1762672 97.0 97.0 97.3 98.3 3.0 177744.0 136769.2 0.0 137192.5 0.0 355940438 117376270 110929985 77.2 77.2 74.4 75.2 5.0 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 ST LUCIE UNIT 1 April 3,1997 O'.A. Rogers (561)467 7296 REPORT MONTH M 1
7 No.
Date Types'uration (Hours)
Reason'ethod of Shutting Down Reactor'icensee Event Report g
System Code'omponent Code'ause 6 Corrective Action to Prevent Recurrence 3/C/97 64.6 N97-003 CKTBRK Unit 1 offline (reactor trip) due to a loss of electrical power to the 1A2 Reactor Coolant Pump.
F Forced S
Scheduled 2
Reason A - Equipment failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - operator Training a License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit 1 - Same Source 091S47 PPL
UMMARY OF OPERATI G EXPERIE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie 51 April 2, 1997 J.A.ROGERS (561) 467-7296 Unit 1 operated at full power through March 3.
On March 4
a reactor trip occurred when a breaker opened and caused the 1A2 reactor coolant pump to de-energize.
The unit returned to power on March 7 and reached full power on March 8.
The unit operated at essentially full power for the remainder of the month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
1
AVERAGE DAIL IT POWER LEVEL MONTH March, 1997 DOCKET NO.
50 - 389 UNIT Saint Lucio I)'2 DATE Apr 01, 1997 COMPLETED BY J. A. Rogers TELEPHONE (561) 467 - 7296 DAY 03/01/97 03/02/97 03/03/97 03/04/97 03/05/97 03/06/97 03/07/97 03/08/97 03/09/97 03/10/97 03/11/97 03/12/97 03/13/97 03/14/97 03/15/97 03/16/97 03/17/97 03/18/97 03/19/97 03/20/97 03/21/97 03/22/97 03/23/97 03/24/97 03/25/97 03/26/97 03/27/97 03/28/97 03/29/97 03/30/97 03/31/97 AVERAGE DAILY POWER LEVEL (MWe-Not) 839 841 841 843 843 842 841 841 841 841 840 839 838 840 840 839 840 842 843 840 839 841 839 826 835 838 836 835 836 837 837
C OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 - 389 DATE 04/03/97 FPL LICENSING GROUP PSL TELEPHONE 561/467/7296 UNIT NAME: ST.
LUCIE UNIT 2 REPORTING PERIOD:
MARCH 1997 LICENSED THERMAL POWER (MWT):
2700 NAMEPLATE RATING (GROSS MWE):
850 DESIGN ELECTRICAL RATING (NET MWE):
830 MAXIMUMDEPENDABLE CAPACITY (GROSS MWE):
882 MAXIMUMDEPENDABLE CAPACITY (NET MWE):
839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST
- REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10.
REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE 11.
HOURS IN REPORT, PERIOD:
12.
NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS GENERATOR ON LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
CAPACITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 744.0 744.0 0.0 744.0 0.0 2007053 658050 624280 100. 0 100. 0 100.0 100.0 0.0 2160.0 2160.0 0.0 2160.0 0.0 5759905 1890260 1792439 100.0 100.0 98.9 100.0 0.0 119641.0 101602.2 0.0 100044.2 0.0 260611037 90328760 81559903 83.6 83.6 81.3 82.1 6.2 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: April 14, 1997 Refueling
& Maintenance 2 5 IF SHUT DOWN AT END OF REPORT PERIOD ~
ESTIMATED DATE OF STARTUP
UNIT SHUTDOWNS AND POWER REDUCTIONS 5
s DOCKET NO.:
50-389 UNIT NAME:
ST LUCIE UNIT 2 DATE:
April 3, 1997 COMPLETED BY:
J.A.ROGERS TELEPHONE:
(561) 467-7296 REPORT MONTH NO.
Date Type Duration (Hours)
Reason'ethod of Shutting Down Reactor'icensee Event Report I System Code'omponent Codes Cause
& Corrective Action to Prevent Recurrence Unit 2 operated at essentially full power for the entire month of March.
F Forced S Scheduled Reason A - Equipment failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source 091sss FPL
~
~
V UMMARY OF OPERAT EXPERIE E
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie $ 2 April 3, 1997 aT.A.ROGERS (561) 467-7296 Unit 2 operated at essentially full power for the entire month of March.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.