Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr
ML17229A005
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/31/1996
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-202, NUDOCS 9608200050
Download: ML17229A005 (13)


Text

CATEGORY j. I REGULAT . INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9608200050 F'A!.'.,I.s",.p-~35 St, Lucie DOC.DATE: 96/07/31 Plant, Unit 1, Florida NOTARIZED: NO

.Power & Light Co.

DOCKET t 05000335 50-389 St. Lucie Plant, Unit 2, F3.,or'ida Power &'ight Co. 05000389 AUTH. NAML AUTHOR AFFILIATION ROGERSpJ.A. Florida Power & LIght Co.

STALL,J.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for vul 1996 for St Lucie Units 2.W/960812 ltr. 1 &

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 WIENS,L. 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 ENTE 1 1 NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCEsJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

U E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

t TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 August 12, 1996 L-96-202 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, attached are the July 1996 Operating Data, Summary of Operating Experience, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/PTQ cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments

'7608200050 96073i PDR 'ADOCK 05000335

~

R PDR an FPL Group company

OPERATZNG DATA REPORT DOCKET NO 50 - 335 DATE 08/08/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS UNIT NAME: ST. LUCIE UNIT 1 REPORTING PERIOD: JULY 1996 LICENSED THERMAL POWER (MWT): 2700 NAMEPLATE RATING (GROSS MWE): 850 DESIGN ELECTRICAL RATING (NET MWE): 830 MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 872 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 IF CHANGES OCCUR IN CAPACITY RATINGS .(ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD" CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5111 171911.0
12. NUMBER OF HOURS REACTOR WAS CRZTICAL 156.4 2978.9 133018. 8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 144.7 2941.7 131563.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 289881 7692650 341169439
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 93970 2516730 112505750
18. NET ELECTRICAL ENERGY GENERATED (MWH) 78166 2371428 106316701
19. UNIT SERVICE FACTOR 19.4 57.6 76.5
20. UNIT AVAILABILITYFACTOR 19.4 57.6 76.5
21. CAPACITY FACTOR (USING MDC NET) 12. 5 55.3 73.7
22. CAPACITY FACTOR (USZNG DER NET) 12.7 55.9 74.5
23. UNIT FORCED OUTAGE RATE 0.0 2.1 5.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.: 50-335 UNIT: St. Lucie N1 DATE: August 8, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 1 remained offline in Mode 5 until July 25 for Cycle 14 refueling and maintenance. Mode 4 was entered at 2351 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.945555e-4 months <br /> on 7/14/96. Mode 3 was entered at 1345 hours0.0156 days <br />0.374 hours <br />0.00222 weeks <br />5.117725e-4 months <br /> on 7/17/96. Mode 2 was entered at 1505 hours0.0174 days <br />0.418 hours <br />0.00249 weeks <br />5.726525e-4 months <br /> on 7/23/96. Criticality was achieved at 1722 hours0.0199 days <br />0.478 hours <br />0.00285 weeks <br />6.55221e-4 months <br /> on 7/23/96. Mode 1 was entered at 1138 hours0.0132 days <br />0.316 hours <br />0.00188 weeks <br />4.33009e-4 months <br /> on 7/25/96. Unit 1 was placed in service at 2320 hours0.0269 days <br />0.644 hours <br />0.00384 weeks <br />8.8276e-4 months <br /> on 7/25/96 and achieved 100~ power at 1145 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.356725e-4 months <br /> on 7/29/96.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAILY UNIT POWER'EVEL DOCKET NO. 50-335 UNIT: St. Lucie Ql DATE August 8, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96 0 07/02/96 0 07/03/96 0 07/04/96 0 07/05/96 0 07/06/96 0 07/07/96 0 07/08/96 0 07/09/96 0 07/10/96 0 07/11/96 0 07/12/96 0 07/13/96 0 07/14/96 0 07/15/96 0 07/16/96 0 07/17/96 0 07/18/96 0 07/19/96 0 07/20/96 0 07/21/96 0 07/22/96 0 07/23/96 0 07/24/96 0 07/25/96 0 07/26/96 118 07/27/96 382 07/28/96 632 07/29/96 835 07/30/96 844 07/31/96 849

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT 1 DATE: August 8, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH ~ul ~5 No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icenseeEvent Report System Code'omponent Code'ause &, Corrective Action to Dotvn Prevent Recurrence 6/22/96 599.3 N/A RC VESSEL Unit I refueling outage extended for steam generator maintenance.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (exp!ain) I - Manual Preparation of Data Entry 8 - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E -Operator Training & License Examination 5 - Load Reduction 5 F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) tslss7 Frt.

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 08/08/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNXT NAME: ST. LUCIE UNXT 2
2. REPORTING PERIOD: JULY 1996
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAX1MUM DEPEMDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SXNCE LAST REPORT i G IVE REASONS 9 POWER LEVEL TO WHICH RESTRXCTED i I F ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5111 113808.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744 4902.6 95773.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 744 4772.5 94211. 2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2006794 12496938 244959660
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 662030 4134890 81195560
18. NET ELECTRICAL ENERGY GENERATED (MWH) 628432 3908749 76699417
19. UNIT SERVICE FACTOR 100 93.4 82.8
20. UNIT AVAILABXLITYFACTOR 100 93.4 82.8
21. CAPACITY FACTOR (USING MDC NET) 100 91.2 80.3
22. CAPACITY FACTOR (USING DER NET) 100 92.1 81.2
23. UNIT FORCED OUTAGE RATE 0.0 4.8 6.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~ ~

DOCKET NO.: 50-389 UNIT: St. Lucie g2 DATE: August 8, 1996 COMPLETED BY: aT.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAILY UNIT POWER'EVEL DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: August 8, 1996 COMPLETED BY: J.A ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) 07/01/96 840 07/02/96 839 07/03/96 840 07/04/96 842 07/05/96 840 07/06/96 840 07/07/96 846 07/08/96 844 07/09/96 846 07/10/96 850 07/11/96 844 07/12/96 843 07/13/96 843

'07/14/96 837 07/15/96 842 07/16/96 844 07/17/96 851 07/18/96 845 07/19/96 844 07/20/96 853 07/21/96 848 07/22/96 863 07/23/96 836 07/24/96 846 07/25/96 850 07/26/96 851 07/27/96 849 07/28/96 852 07/29/96 840 07/30/96 834 07/31/96 845

UNIT SHUTDOWNS AND POWER REDUCTIONS ~ ~

DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 ~,

DATE: August. 6, 1996 COMPLETED BY: J.A.ROGERS-TELEPHONE: (407) 467-7296 REPORT MONTH LLttr ~95 No. Date Type Duration (Hours)

Reasons Method of Shutting Reactor'icensee Dotvn Event Report

¹ System Code'omponent Code'ause & Corrective Action to Prevent Recurrence Unit 2 operated at full potver for the entire month.

I 3 F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Preparation of Data Entry 8 - Maintenance or Test 2- Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) Ftle (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training &: License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) relssl Fpl