ML17228B526

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr
ML17228B526
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/31/1996
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-145, NUDOCS 9606210072
Download: ML17228B526 (15)


Text

7.

4 REGULATO 1

INFORMATION,DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9606210072 DOC.DATE: 96/05/31 NOTARIZED: NO DOCKET St. Lucie Plant, Unit 1, Florida Power a Light Co. 'ACIL:S0-335 05000335 50-389, St. Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH. NAME " AUTHOR AFFILIATION ROGERS,J.A. Florida Power a Light Co.

STALL,J.A.  : Florida Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for May 1996 for St Lucie Units 1 &

2.W/960612 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 WIENS i L. 1 1 INTERNAL: RS 1 1 AEOD/SPD/RRAB 1 1 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCEiJ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIP1ENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EX'15-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Florida Power 5 Light Company, P.O. Box128, Fort Pierce, FL34854-0128 L-96-145 3Ull 12 1596 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the May 1996, Operating Data, Summary of Operating Experience, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact US ~

Very truly yours, J. A. Stall, Vice President St. Lucie Plant JAS/SL Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 96062i0072 96053i PDR ADGCK 05000335I R PDR I, an FPL Group company

r E

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 6/ 7/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS UNIT NAME: ST. LUCIE UNIT 1 REPORTING PERIOD: MAY 1996 LICENSED THERMAL POWER (MWT): 2700 NAMEPLATE RATZNG (GROSS MWE): 850 DESIGN ELECTRICAL RATING (NET MWE): 830 MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 872 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST I

REPORT i G VE REASONS 9 POWER LEVEL TO WHICH RESTRI CTED i IF ANY (NET MWE )

10 REASONS FOR RESTRICTIONS i IF ANY MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 3647 170447.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2822.5 132862.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 0.0 2797.0 131418.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 7402769 340879558
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 2422760 112411780
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 2293262 106238535
19. UNIT SERVICE FACTOR 0.0 76.7 77. 1
20. UNIT AVAZLABILITYFACTOR 0.0 76.7 77.1
21. CAPACITY FACTOR (USING MDC NET) 0.0 74.9 74.3
22. CAPACITY FACTOR (USING DER NET) 0.0 75.7 75.1
23. UNIT FORCED OUTAGE RATE 0.0 2.2 5.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 7/19/96.

DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: June 7, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 1 remained offline for the entire month for Cycle 14 refueling and maintenance.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE dune 7, 1996 COMPLETED BY: aT.A.ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/96 05/02/96 05/03/96 05/04/96 05/05/96 05/06/96 05/07/96 05/08/96 05/09/96 05/10/96 05/11/96 05/12/96 05/13/96 05/14/96 05/15/96 05/16/96 05/17/96 05/18/96 05/19/96 05/20/96 05/21/96 05/22/96 05/23/96 05/24/96 05/25/96 05/26/96 05/27/96 05/28/96 05/29/96 05/30/96 05/31/96

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: June 7, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH hhy ~K No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down ¹ Prevent Recurrence 4/29/96 744 N/A RC VESSEL Unit l offline for Cycle 14 refueling and maintenance.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment fai!ure (explain) I - Manual preparation of Data Entry 8 - Maintenance or Test 2 - htanual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG416l)

D - Regulatory restriction 4 - Continued E - Operator Training g: License Examination 5 - Load Reduction 5 F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) 0915sr FPL

K .r OPERATING DATA REPORT DOCKET NO 50 " 389 DATE 6/ 7/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: MAY 1996
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTZONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 3647 112344. 0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744 3603.9 94474.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 744 3487.4 92926.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1984529 9123215 241585937
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 655450 3025530 80086200
18. NET ELECTRICAL ENERGY GENERATED (MWH) 621508 2861813 75652481
19. UNIT SERVICE FACTOR 100 95.6 82.7
20. UNIT AVAILABILITYFACTOR 100 95.6 82.7
21. CAPACITY FACTOR (USING MDC NET) 99.6 93.5 80.3
22. CAPACITY FACTOR '(USING DER NET) 100 94. 5 81.1
23. UNIT FORCED OUTAGE RATE 0.0 1.7 6.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25. ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.: 50-389 UNXT: St. Lucie ¹2 DATE: June 7, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT: St. Lucie N2 DATE: June 7, 1996 COMPLETED BY: J.A ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) 05/01/96 847 05/02/96 848 05/03/96 848 O5/O4/96 849 05/05/96 850 05/06/96 847 05/07/96 850 05/08/96 850 05/09/96 849 05/10/96 842 05/11/96 845 05/12/96 850 05/13/96 848 05/14/96 847 05/15/96 843 05/16/96 846 05/17/96 843 05/18/96 843 05/19/96 847 05/20/96 847 05/21/96 846 05/22/96 848 05/23/96 843 05/24/96 795 05/25/96 720 05/26/96 727 05/27/96 846 05/28/96 842 05/29/96 848 05/30/96 846 05/31/96 798

~ ~

tg I

)

~ J UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 ~ ~

UNIT NAME: ST LUCIE UNIT 2 DATE: June 7, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH hfay ~5 No. Date Type Duration (Hours)

Reasons Method of Shutting Reactor'icensee Down Event Report System Code'omponent Code'ause & Corrective Action to Prevent Recurrence Unit 2 operated at full power for the entire month.

I 2 3 4 F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Preparation of Data Entry I) - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG41161)

D - Regulatory restriction 4 - Continued E - Operator Training g: License Examination 5 - Load Reduction F - Admmistrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) tslssl FPt.