ML17229A471

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr
ML17229A471
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/31/1997
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-235, NUDOCS 9709160180
Download: ML17229A471 (13)


Text

CATEGORY 1 REGUDATC ~ ZNFORMATZON DZSTRZBUTZON TEM (RZDS)

ACCESSION NBR:9709160180 DOC.DATE: 97/08/31 NOTARIZED: NO DOCKET I FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME , AUTHOR AFFILIATION ROGERS,J.A. Florida Power & Light Co.

STALI,J.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for August 1997 for St Lucie.

N/970908 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 WIENSFL. 1 1 .0 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 LE 'CEN 1 1 NRR/DRPM/PECB 1 1 1 1 RGN2 1 1 oc/DBA/PAD'XTERNAL:

LITCO BRYCEFJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

U E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DlSTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

Florida Power 5 Light Company, 6501 South Ocean Drive, Jensen Beach. FL 34957 September 8, 1997 L-97-235 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, attached are the August 1997, Operating Data Report, Summary of Operating Experience Report, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/tlt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant

'Ir709'i60i80 9'70831 PDR ADQCK 05000335 R PDR 160658 llllllllllllllllllllllllll~lllllljlilllll an FPL Group company

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 09/04/97 FPL LICENSING GROUP - PSL TELEPHONE 561/467/7296 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: AUGUST 1997
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATlNG (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXZMUM DEPENDABLE CAPACITY (NET MWE): 839
8. ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHZCH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744.0 5831.0 181415.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5681.5 142349. 1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LZNE 744.0 5667.0 140764.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2007449 15205412 365534395
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 654300 4997030 120515060
18. NET ELECTR1CAL ENERGY GENERATED (MWH) 620897 4739066 113906379
19. UNIT SERVICE FACTOR 100 97.2 77.6
20. UNIT AVAILABILITYFACTOR 100 97.2 77.6
21. CAPACITY FACTOR (USING MDC NET) 99.5 96.9 74.8
22. CAPACITY FACTOR (USING DER NET) 100 97.9 75.7
23. UNIT FORCED OUTAGE RATE 0.0 2.8 4.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: October 20, 1997 Refueling Outage 25 IF SHUT DOWN AT END OF REPORT PERIOD g ESTIMATED DATE OF STARTUP

UMMARY F PERAT EXPE IENCE DOCKET NO.:

UNIT:

DATE:

I'0-335 St. Lucie I1 September 4, 1997 COMPLETED BY: LT.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH 1 7 Unit 1 operated at essentially full power for the entire month of August.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50 - 335 UNIT Saint Lucio //1 DATE Sep 03, 1997 COMPLETED BY J. A. Rogers TELEPHONE (561) 467 - 7296 MONTH August, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Not) 08/01/97 838 08/02/97 837 08/03/97 836 08/04/97 838 08/05/97 839 08/06/97 838 08/07/97 836 08/08/97 835 08/09/97 836 08/10/97 837 08/1 1/97 836 08/12/97 837 08/1 3/97 835 08/1 4/97 838 08/15/97 834 08/16/97 834 08/17/97 832 08/1 8/97 832 08/1 9/97 836 08/20/97 832 08/21/97 822 08/22/97 834 08/23/97 834 08/24/97 835 08/25/97 833 08/26/97 837 08/27/97 829 08/28/97 832 08/29/97 835 08/30/97 832 08/31/97 832

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT 1 DATE: Sept. 4,. 1997 COMPLETED BY: J.A. Rogers TELEPHONE: (561)467-7296 REPORT MONTH No Date Type~ Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Down Event Report I System Code'omponentCode'ause & Corrective Action to Prevent Recurrence Unit l operated at essentially full power for the entire month of August.

2 F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (MUREG-0161)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain) 6915I7 FPL

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 09/04/97 FPL LICENSING GROUP - PSL TELEPHONE 561/467/7296 OPERATING STATUS UNIT NAME: ST. LUCIE UNIT 2 REPORTING PERIOD: AUGUST 1997 LICENSED THERMAL POWER (MWT): 2700 NAMEPLATE RATING (GROSS MWE): 850 DESIGN ELECTRICAL RATING (NET MWE): 830 MAXZMUM DEPENDABLE CAPACITY (GROSS MWE): 882 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: II

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, XF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744.0 5831. 0 123312.0
12. NUMBER OF HOURS REACTOR WAS CRXTZCAL 744.0 4866.3 104312.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 744.0 4827.4 102711. 6
15. UNZT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2006859 12857522 267708654
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 664490 4234080 92672580
18. NET ELECTRICAL ENERGY GENERATED (MWH) 630490 4008498 83775968
19. UNIT SERVICE FACTOR 100.0 82.8 83.3
20. UNIT AVAILABILITYFACTOR 100.0 82.8 83.3
21. CAPACITY FACTOR (USING MDC NET) 100.0 81.9 81.0
22. CAPACITY FACTOR (USING DER NET) 100.0 82.8 81.9
23. UNIT FORCED OUTAGE RATE 0.0 a, 0.0 6.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

25 IF SHUT DOWN AT END OF REPORT PERIOD~ ESTXMATED DATE OF STARTUP

F PERATI EXPERIE E DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: September 4, 1997 COMPLETED BY: aT.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Au st Unit 2 operated at essentially full power for the entire month of August.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period,.

AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50 - 389 UNIT Saint Lucia //2 DATE Sep 03, 1997 COMPLETED BY J. A. Rogers TELEPHONE (561) 467 - 7296 MONTH August, 1997 r

DAY AVERAGE DAILY POWER LEVEL (MWe.Net) 08/01/97 851 08/02/97 851 08/03/97 851 08/04/97 851 08/05/97 850 08/06/97 851 08/07/97 849 08/08/97 850 08/09/97 849 08/10/97 849 08/11/97 848 08/12/97 849 08/13/97 853 08/14/97 842 08/15/97 850 08/16/97 846 08/17/97 847 08/18/97 844 08/19/97 849 08/20/97 847 08/21/97 846 08/22/97 847 08/23/97 849 08/24/97 848 08/25/97 840 08/26/97 841 08/27/97 844 08/28/97 847 08/29/97 844 08/30/97 847 08/31/97 841

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE. UNIT 2 DATE: Sept.4, 1997 COMPLETED BY: J. A. Rogers TELEPHONE: (561) 467-7296 No Date Duration Reason'ethod of System Code'omponent Cause r Corrective (Hours) Shutting Reactor'icensee Event Codes Action to Down Report I Prevent Recurrence Unit 2 operated at essentially full popover for the entire month of August..

1 2 3 4 F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (MUREG-0161)

D - Regulatory restriction 4 -. Continued E - Operator Training & License Examination 5 - Load Reduction 5 F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

M ii +v xr