ML17223B106

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jan 1991 for St Lucie Units 1 & 2 & Revised Repts for Sept-Dec 1990
ML17223B106
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/14/1991
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17223B107 List:
References
L-91-47, NUDOCS 9102260040
Download: ML17223B106 (2)


Text

,ACCELERATED DISTRIBUTION DEMONSTTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9102260040 DOC.DATE: 91/02/14 NOTARIZED:

NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power Sr Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards monthly operating repts for Jan 1991 for St Lucie Units 1

6 2

6 revised repts for Sept-Dec 1990.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED LTR ENCL SIZE:=.

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

DOCKET 05000335 05000389 "R

D RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DL LPEB10 EXTERNAL EGGG BRYCE iJ H

NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 D

D

'S R

D NOTE TO ALL"RIDS" RECIPIENTS:

~ ~,~

~

A D

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 26 ENCL 26

P.O. Box 128, Ft. Pierce, FL 349544128 4

1991 L-91-47 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 Gentlemen:

Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1991 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

There was a calculation error in line 23 in the Unit 1 October Report, which was carried through December.

Also the same error was made in the Unit 2 report for the months of September and December.

These errors have been corrected and the corrected copies are attached to this report.

Very truly yours, D. A.

S ger Vice P esident St.

ie Plant DAS:JJB:kw cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL f350 a9102260040 910l31

<PDR ADOCK 05000335

'R'DR an FPL Group company