ML17223B112

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Dec 1990 for St Lucie Units 1 & 2
ML17223B112
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/31/1990
From: Breen J
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17223B107 List:
References
NUDOCS 9102260056
Download: ML17223B112 (2)


Text

QF'ERATING DATA REPORT I

DOCVET NQ 50 335 DATE igg) 4 COHPLETEO BY JAP hREEN OPERATING STATUS TELEPHONE 407/465/3550

i. UNI'r NAME; sr, LucIE uNIT REF'ORTING PERIOD: DECEMBER 1998 1
3. LICENSED THERMAL F'OWER < MWT): 2700 NAMEPLATE RATING (GROSS MWE) i 850 5 DESXGN ELECTRICAL RATING (NET MWE): 830 6~ MAXIMUM DEPENDABLE CAF'ACITY (GROSS MWE) o 872 7o MAXIMUM DEF'ENDABLE CAPACITY ( NET MWE ) o 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS <ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT 1 GIVE REASONS t POWER LEVEL TO WHICH RESTRXCTEDE IF ANY (NET MWE)

10. REASONS FOR RESTRICTIONS TF ANY:

MONTHLY -YTD- CUMULATTUE ii, 12.

HOURS XN REPORT PERXOD; NUMBER OF HOURS REACTOR WAS CRITICAL 744 744+0 8760 5569o9 122976.0 92958+5 13m REACTOR RESERVE SHUTDOWN HOURS OiO Oie 2 0543 14 HOURS GENERATOR ON-LINE 744iO 5467o4 92104.4 15'NIT RESERVE SHUTDOWN HOURS 0+0 OiO 39~3 16'ROSS THERMAL ENERGY GENERATED (MWH) 1951346 14284414 237242054 17'ROSS ELECTRICAL ENERGY GENERATED (MWH) 656140 4765570 78208640 18'ET ELECTRICAL ENERGY GENERATED <MWK) 623009 4493877 73892742 19 o UNIT SERVICE FACTOR 100+0 6Z.4 74 '

20 o UNXT A VAXLABXLITYFACTOR 100oO 62.4 74.9 21'APACITY FACTOR (USXNG MDC NET) 99+8 61' 74 '

22 CAF'ACITY FACTOR (USXNG DER NET) 100 61+8 73+4

~3, UNIT FORCED OUTAGE RATE ~.O Q,3

4. sHuTDOWNS sCHEDuLED OVER NEXT 6 MONTHS :

25, XF SHUT DOWN AT END OF REPORT PERIOD~ ESTIMATED DATE OF STARTUP:

'9102260056 910214 PDR ADQCK 05000335

~

R PDR

OPERATING DATA REPORT DOCKET NO 50 38 DATE COMPLETED BY J~5. BREEN TELEPHONE 407/465/3550 OPERATING STATUS 1 ~ lJNXT NAME: ST ~ LUCIE lJNXT 2 REPORTING PERIOD: DECEMBER 1998

3. LICENSED THERMAL POWER (MWT) o 270()
4. NAMEPI ATE RATING (GROSS MWE): 850
5. DESXGN ELECTRICAL RATING <NET MWE) o 830 6o MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)o 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPAC1TY RATXNGS (XTEMS NUMBER 3 THROUGH 7)

$ 1NCE LAST REPORT ~ GIVE REASONS LEVEL TO WHICH RESTRICTED~ XF ANY (NET MWE)

'OWER

10. REASONS FOR RESTRICTIONS~ XF ANY'ONTHLY

-YTD- CUMULATIVE 11 o HOURS XN REPORT PERIOD f 744 8760 64873.0

12. NUMBER OF HOURS REACTOR WAS CRITXCAL 704+0 6691.4 54860.3 13m REACTOR RESERVE SHUTDOWN HOURS 0' OoO 0 ~ 0
14. HOURS GENERATOR ON-LINE 649i8 6489i6 53844 '

15'NIT RESERVE SHUTDOWN HOURS OiO OoO 0 '

16+ GROSS THERMAL ENERGY GENERATED <MWH) 1575775 16991685 140789081 17 o GROSS ELECTRICAL ENERGY GENERATED (MWH) 531140 5645010 46896920 18'ET ELECTRICAL ENERGY GENERATED <MWH) 498905 5320989 44334103 19o UNXT SERVXCE FACTOR 87+3 74+1 83-()

20 ~ UNIT AVAXLABXLITYFACTOR 87i3 74oi 83.0'3.4 21 o CAPACITY FACTOR (USING MDC NET) 79i9 72e4 22+ CAPACITY FACTOR <USING DER NET) 80i8 73o2 83.i, 23+ UNXT FORCED OUTAGE RATE w.4 I o.X s.'I 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS ~

25 o IF SHUT DOWN AT END OF REPORT PERIOD e ESTIMATED DATE OF STARTUP: