ML17229A265

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2
ML17229A265
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/28/1997
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-70, NUDOCS 9703190366
Download: ML17229A265 (13)


Text

CATEGORY j.

REGULAT INFORMATION DISTRIBUTIO SYSTEN (RIDS)

ACCESSION NBR FAGlk; 50-.335 50-3SV AUTH. NAME ROGERS'.

A.

STAL'Ls J. A.

REC IP. NA!'1E 9703190366 DOC. DATE: V7/02/28 NOTARIZED:

NO St.

Lucie Planti Unit 1> Florida Power 4~ Light Co.

St.

Lucie Plant, Unit 2i Florida Power i< Light Co.

AUTHOR AFFILIATION Florida Power '. Light Co.

Florida Pou!er 5 Light Co.

RECIP IENT AFFILIATION DOCKET 0 05000335 050003SP

SUBJECT:

Monthly operating repts for Feb 1997

%or St Lucie Units 1

2. W/970313 1 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

REC IP IENT ID CODE/NANE PD2-3 PD INTERNAL:

ACRS CENTER O

COPIES LTTR ENCL 1

1 1

1 1

1 1

1 REC IP IEiNT ID CODE/NAl'1E

'i)IENSE L.

AEOD/SPD/RRAB NRR/DRPN/PECB RGN2 COPIES LTTR EiNCL 1

1 1

1 1

1 1

1 0

EXTERNAL: LITCO BRYCEi J H

NRC PDR NQAC D

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK/

ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 1 1 ENCL 11

~

V'

Florida Power &Light Company, 6501 South Ocean Orive, Jensen Beach, FL34957 FPL March 13, 1997 L-97-70 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the February

1997, Operating Data
Report, Summary of Operating Experience
Reports, Average Daily Unit Power
Level, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us

~

Very truly yours, J.

A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc:

Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9703190366 970228 ~(

PDR ADOCK 05000335 PDR lllIIIIIIIfIIIIIIIIIIIIIIII'IIIIIIIIIllillllll an FPL Group company

J

OPERATING DATA REPORT

'OPERATING STATUS DOCKET NO 50 - 335 DATE 03/05/97 FPL LICENSING GROUP

- PSL TELEPHONE 561/467/7296 1.

2.

3.

4.

5.

6.

7.

8.

UNIT NAME: ST.

LUCZE UNIT 1 REPORTING PERIOD:

FEBRUARY 1997 LICENSED THERMAL POWER (MWT):

2700 NAMEPLATE RATZNG (GROSS MWE):

850 DESIGN ELECTRICAL RATING (NET MWE):

830 MAXIMUMDEPENDABLE CAPACITY (GROSS MWE):

872 MAXIMUMDEPENDABLE CAPACITY (NET MWE):

839 ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST

REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10.

REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE 11.

HOURS IN REPORT PERIOD:

12.

NUMBER OF HOURS REACTOR WAS CRITICAL 13.

REACTOR RESERVE SHUTDOWN HOURS 14.

HOURS GENERATOR ON LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GENERATED (MWH) 17.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.

NET ELECTRICAL ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAZLABILITYFACTOR 21.

CAPACITY FACTOR (USING MDC NET) 22.

CAPACITY FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE RATE 672.0 672.0 0.0 672.0 0.0 1806998 599270 569184 100. 0 100.0 100.0 100.0 0.0 1416.0 1416.0 0.0 1416.0 0.0 3804678 1262820 1199562 100.0 100.0 100.0 100. 0 0.0 177000.0 138083.6 0.0 136513. 1 0.0 354133661 116780850 110366875

77. 1
77. 1 74.3 75.1 4.9 24.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

25.

ZF SHUT DOWN AT END OF REPORT

PERIOD, ESTIMATED DATE OF STARTUP:

Y F

PE TX EXPERIE E

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie g1 March 5, 1997 aT.A.ROGERS (561) 467-7296 REPORT MONTH br Unit 1 returned to full power on February 1 after repair of a leak on the turbine cooling water hydrogen cooler.

The unit operated at essentially full power for the remainder of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

UNIT:

DATE COMPLETED BY:

TELEPHONE:

50-335 St. Lucie ¹1 Mar 5, 1996 J.A.ROGERS (561) 467-7296 MONTH DAY 02/01/97 02/02/97 02/03/97 02/04/97 02/05/97 02/06/97 02/07/97 02/08/97 02/09/97 02/10/97 02/11/97 02/12/97 02/13/97 02/14/97 02/15/97 02/16/97 02/17/97 02/18/97 02/19/97 02/20/97 02/21/97 02/22/97 02/23/97 02/24/97 02/25/97 02/26/97 02/27/97 02/28/97 AVERAGE DAILY POWER LEVEL (MWe-Net) 799 853 852 852 851 850 849 853 850 852 853 853 851 856 853 851 853 855 854 851 846 841 840 839 840 840 840 840

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 ST LUCIE UNIT 1 March 5, 1997 J.A. Rogers (561)467-7296 REPORT MONTH eb No.

Date Duration (Hours)

Reason'ethod of Shutting Down Reactor'icensee Event Report I System Code'omponent Code'ause 6 Corrective Action to Prevent Recurrence 1/31/g7 0.0 N/A HF HTEXCH Unit l was at approximately 86% power to -repair a leak on the turbine cooling water hydrogen cooler and returned to full power on February l.

1 F

Forced S

Scheduled 2

Reason A - Equipment failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training 6 License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - continued 5 - Load Reduction 9 - Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (MUREG-0161) 5 Exhibit 1 - Same Source 091999 F91

OPERATING DATA REPORT OPERATZNG STATUS DOCKET NO 50 - 389 DATE 03/05/97 FPL LICENSING GROUP

- PSL TELEPHONE 561/467/7296 UNIT NAME: ST.

LUCIE UNIT 2 REPORTING PERIOD:

FEBRUARY 1997 LICENSED THERMAL POWER (MWT):

2700 NAMEPLATE RATING (GROSS MWE):

850 DESIGN ELECTRICAL RATING (NET MWE):

830 MAXIMUMDEPENDABLE CAPACITY (GROSS MWE):

882 MAXIMUMDEPENDABLE CAPACITY (NET MWE):

839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST

REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 1 0 REASONS FOR RESTRICTIONS

~ IF ANY MONTHLY

-YTD-CUMULATIVE 11.

HOURS IN REPORT PERIOD:

12.

NUMBER OF HOURS REACTOR WAS CRITICAL 13.

REACTOR RESERVE SHUTDOWN HOURS 14.

HOURS GENERATOR ON LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GENERATED (MWH) 17.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 18 'ET ELECTRICAL ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 21.

CAPACITY FACTOR (US1NG MDC NET) 22.

CAPACITY FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE RATE 672.0 672.0 0.0 672.0 0.0 1775137 581660 551315 100. 0 100. 0 97.8 98.8 0.0 1416.0 1416.0, 0.0 1416.0 0.0 3752852 1232210 1168159 100.0 100.0 98.3 99.4 0.0 118897.0 100862.2 0.0 99300.2 0.0 258603984 89670710 80935623 83.5 83.5 81.1 82.0 6.3 24.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: April 14, 1997 Refueling 6 Maintenance

25. IF SHUT DOWN AT END OF REPORT
PERZOD, ESTIMATED DATE OF STARTUP:

~

~

UMMA Y F

PERA EXPE IE DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 St. Lucie ¹2 March 5, 1997 aT.A.ROGERS (561) 467-7296 REPORT MONTH Febr Unit 2 operated "at essentially full power until February 18.

On February 18 the unit downpowered to approximately 15% for maintenance on the main feedwater regulator valve controller.

The unit returned to full power on February 19 and operated at full power for the remainder of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAILY IT POWER LEVEL MONTH February, 1997 DOCKET NO.

50 - 389 UNIT Saint Lucio //2 DATE Mar 05, 1997 COMPLETED BY J. A. Rogers TELEPHONE I561) 467 - 7296 DAY 02/01/97 02/02/97 02/03/97 02/04/97 02/05/97 02/06/97 02/07/97 02/08/97 02/09/97 02/1 0/97 02/1 1/97 02/1 2/97 02/13/97 02/1 4/97 02/1 5/97 02/16/97 02/1 7/97 02/1 8/97 02/1 9/97 02/20/97 02/21/97 02/22/97 02/23/97 02/24/97 02/25/97 02/26/97 02/27/97 02/28/97 AVERAGE DAILY POWER LEVEL (MWo.Net) 845 846 842 843 841 841 839 841 841 842 842 844 845 842 842 842 843 312 782 840 840 840 839 839 839 842 838 841

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 ST LUCIE UNIT 2 March 5, 1997 J.A.ROGERS (561) 467-7296 REPORT MONTH No.

Date Type'uration (Hours)

Reason'ethod of Shutting Down Reactor'icensee Event Report ¹ System Code'omponent Code'ause

&. Corrective Action to Prevent Recurrence 2/1S/97 16.3 N/A INSTRU Unit 2 downpowered for maintenance on the main feedwater regulator valve controller.

F Forced S Scheduled Reason A - Equipment failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training k License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source 091947 F97

C H

L

/