Revised Monthly Operating Rept for Oct 1979
ML19260D085
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/29/1980
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19260D082 List:
References
NUDOCS 8002070379
Download: ML19260D085 (2)


Text

. '

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH ocensor. YEAR 197o Revised 1-29-80 SUBMITTED:

M3 [$xm h SUPERINTENDENT - OPERATIONS APPROVED:

'

hff t l'h MANAGER J 1937 19I 8002070 339

. .

OPERATING DATA REPORT DOCKET NO. 50-338 DATE l//9/W COMPLETED BY W. R. Madison TELTPHONE (/03)894-5151 OPERATING STATUS florth Anna, Unit 1 Notes

1. Unit Name:
2. Reporting Period: October 1979 (Revised) -
3. Licensed Thermal Power (MWt): 2776 *

-

4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Ratmg (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 928
7. Maximum Dependable Capacity (Net MWe):

898

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted If Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A

.

.

'

'

This Month Yr..to.Date Cumulative 745 7,296 12,313 l1. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 0 6 47R 4 10 169 9
13. Reactor Reserve Shrtdown Houn 0 51.5 148.3
14. Hours Genentor On Line 0 5,401.5 10.053.2 0 0 0'
15. Unit Reserve Shutdown Houn
16. Gross Thermal Energy Generated (MWH) 0 14,083,118 26.279.913 l~. Gross Electzical Energy Generated (MWH) 0 _ _ .

4.445.912 8.346.344

18. Net Elecmcal Energy Generated (MWH) 0 4.1R8.866 7.851.446
19. Unit Semce Factor 0 74.0 81.6
20. Urut Availabdity Factor 0 74.0 81.6
21. Unit Capacity Factor (Using MDC Net) 0 63.9 71.0 U 63.3 70.3
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0 4.8 3.3

'

24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of E2ch):

N/A December 17, 1979

25. If Shur Down At End Of Report Period. Estimated Date of Startup.
26. Units in Test Status t Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY

, NITIAL ELECTRICITY MMERCIAL OPERATION

.

1937 192 m