| Site: | North Anna |
| Issue date: | 01/29/1980 |
| From: | Wil Madison VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML19260D082 | List: |
| References | |
| NUDOCS 8002070412 | |
| Download: ML19260D101 (2) | |
Text
...... _ _.. -
t k
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH May YEAR 1979 Revised 1-29-80 SUBMITTED:
D E : -,..A SUPERINTE DENT - OPERATIONS APPROVED:
[
(-
Tfl MANAGER s '
1937 201 8002070 e
>$/%
~
OPERATING DATA REPORT 50-338 DOCKET NO.
DATE 1//9/6u COMPLETED BY W R f4dison TELEPHONE
/o w M-5151 OPERATING STATUS N0S
- 1. Unit Name:
North Ann' Mnit 1 MdV 1979 (Revised)
- 2. Reportmg Period:
- 3. Licemed Thermal Power (MW ):
2775
- 4. Nameplate Rating (Gross MWe):
947 907
- 5. Design Electrical Rating (Net MWe):
928
- 6. Maximum Dependable Capacity (Gross MWe):
898
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To which Restricted,If Any (Net MWe):
" /o
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr..to.Da t e Cumulative
- 11. Hours in Reporting Period 744 3.627 8.640
- 12. Number Of Houn Resctor Was Critical
/02.2 2,688.2
/,3/5
- 13. Reactor Reserve Shutdown Houn 11.8 48.7 145.5
- 14. Houn Generator On.Line 671.3 2,611.7 7.263
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1.815.377 6 071 01o 10 167 na1
- 17. Grou Electrical Energy Genented (MWH) 580,855 2.2P9.070 6.129.507
- 13. Net Electrical Energy Genented (MWH) 54/,621 2,100,901 5,765,481
- 19. Unit Service Factor 90*2
/2 I 84 I
- 20. Unit Avidability Factor 90.2 72.1 84.1 82.0 64.6 74.3
- 21. Unit Capacity Factor (Using MDC Net) 81.2 63.9 73.6
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 6.0 9.3 4.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eachi:
Reserve Station Sorvice Tie-in: cossibiv,1olv 1070: 10 d,vc
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
N/A
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION 1937,202 ec-