VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH June YEAR 1979 Revised 1-29-80 SUBMITTED:

N '.3 $ _s < w,r -

SUPERINTENDENT'y OPERATIONS APPROVED:

7

/  % \

MANAGE

. 1937 199 800207o N'0 ?

OPERATING DATA REPORT DOCKET NO. 50-338 DATE I/79/MO COMPLETED BY w. n. :adison TELEPHONE /ou 894-5151 OPERATING STATUS thrth Annn. Unit 1 N kS

1. Unit Name:
2. Reporting Penod: June 1979 (Revised)

' 3. Licensed Thermal Power (MWt):

2776 _ _.. . ,

, , m1 ,s % -

4. Nameplate Rating (Grou MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 99R
7. Maximan Dependable Capacity (Net MWe): 808 .
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasor:s: I N/A
9. Power Level To Which Restricted,if Any (Net MWe): 'I / A
10. Reasons For Restrictions, ta Any- N/A This Month Yr..to-Data Cumulative I1. Hours In Reporting Period 720 4.141 4.160
12. Number Of Hours Reactor Was Critical 720 1 40R ? R nos
13. Reactor Reserve Shutdown Hours 0 ,

48.7 145 5

14. Hours Generator On.Line 720 1.111 1 7_091
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1.945.Ra7 R.916.R45 91.111.600 17 Gross Electrical Energy Generated (MWH) 617.547 _ _ .

2.846.527 6.746.064

18. Net Electrical Energy Generated (MWH) 583.847 7.684,748 6.349.378
19. Unit Service Factor 100 76.7 85.3
20. Unit Avadability Factor 100 76.7 85.3
21. Unit Capacity Factor (Using MDC Net) 40 1 69 R 75_5
22. Unit Capacity Factor (Using DER Net) R9.4 68.1 74.R
23. Unit Forced Outage Rate 0 7.5 4.1
24. Shutdowns Sche.iuled Over Next 6 Months (Type. Date, and Duration of Each):

Refuelina: September, October, Novettber: 11 weeks

25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY _

COMMERCIAL OPERATION 1937 g, n 200