Text
i
\\
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH June YEAR 1979 Revised 1-29-80 SUBMITTED:
N '.3
$ _s < w,r -
SUPERINTENDENT'y OPERATIONS APPROVED:
7
/
% \\
MANAGE 1937 199 800207o N'0 ?
OPERATING DATA REPORT DOCKET NO.
50-338 DATE I/79/MO COMPLETED BY
- w. n. :adison TELEPHONE
/ou 894-5151 OPERATING STATUS N kS
- 1. Unit Name:
thrth Annn. Unit 1
- 2. Reporting Penod:
June 1979 (Revised) 2776
' 3. Licensed Thermal Power (MWt):
m1,s % -
947
- 4. Nameplate Rating (Grou MWe):
907
- 5. Design Electrical Rating (Net MWe):
99R
- 6. Maximum Dependable Capacity (Gross MWe):
808
- 7. Maximan Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasor:s:
I N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
'I / A N/A
- 10. Reasons For Restrictions, ta Any-This Month Yr..to-Data Cumulative I1. Hours In Reporting Period 720 4.141 4.160
- 12. Number Of Hours Reactor Was Critical 720 1 40R ?
R nos
- 13. Reactor Reserve Shutdown Hours 0
48.7 145 5
- 14. Hours Generator On.Line 720 1.111 1 7_091
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1.945.Ra7 R.916.R45 91.111.600 17 Gross Electrical Energy Generated (MWH) 617.547 2.846.527 6.746.064
- 18. Net Electrical Energy Generated (MWH) 583.847 7.684,748 6.349.378
- 19. Unit Service Factor 100 76.7 85.3
- 20. Unit Avadability Factor 100 76.7 85.3
- 21. Unit Capacity Factor (Using MDC Net) 40 1 69 R 75_5
- 22. Unit Capacity Factor (Using DER Net)
R9.4 68.1 74.R 0
7.5 4.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Sche.iuled Over Next 6 Months (Type. Date, and Duration of Each):
Refuelina: September, October, Novettber: 11 weeks N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 200 g, n