Revised Monthly Operating Rept for Sept 1979
ML19260D088
Person / Time
Site: North Anna 
Issue date: 01/29/1980
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19260D082 List:
References
NUDOCS 8002070388
Download: ML19260D088 (2)


Text

.

bl1 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH SeotemberVEAR 1979 Revised 1-29-80 SUBMITTED:

N D3 a b %,_

SUPERINTENDENT - OPERATIONS APPROVED:

' ((

MANAGES) 1937 193 g&)2cP7Q380

OPERATING DATA REPORT DOCKET NO.

DATE 1/?q/90 COMPLETED BY W. R. Madison TELEPHONE f/031844-5151 OPERATING STATUS N t'5

1. Unit Name:

North Anna. Unir 1 snntorehar lo7o (onyignej)

2. Reporting Period:

3.1.acensed Thermal Power (MWt):

?775 m, _

947

4. Nameplate Rating (Gross MWe):

90/

S. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):

928 898 7'. Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe):

N/A tyA

10. Reasons For Restrictions,if Any:

\\

This Month Yr. to-Date Gmulative l1. Hours in Reporting Period 720 6.961 11_ qc;q

12. Number Of Hours Rescror Was Critical 582.2 5.478.4 10.16; 9
13. Resctor Reserve Shutdown Hours 2.8 51.5 14R.3
14. Hours Generator On.Line SR7.2 6 401 8 in OR1 9
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1.i34,368 14,083,118 26.279.913
17. Gross Electrical Energy Generated (MWH) 345,793 4.449.912 R.146.144 320,744 4,188.866 7.853.446
18. Net Electrical Energy Generated (MWH) 80.7 82.4 86.9
19. Umt Service Factor 80.7 82.4 86.9
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 49.6 71.2 7E.6
22. Unit Capacity Factor (Using DER Net) 49.1 70.5 74 R
23. Unit Forced Outage Rate 0.5 4.8 3.3
24. Shutdowns Scheduled Over Next 6' Months (Type. Date,and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

D n e' n d o v-17 10'O

26. Units In Test Status IPrior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY dO, jlNITIAL ELECTRICITY

' COMMERCIAL OPERA TION 1937 194 (0/77 )