bl1 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH SeotemberVEAR 1979 Revised 1-29-80 SUBMITTED:
N D3 a b %,_
SUPERINTENDENT - OPERATIONS APPROVED:
' ((
MANAGES) 1937 193 g&)2cP7Q380
OPERATING DATA REPORT DOCKET NO.
DATE 1/?q/90 COMPLETED BY W. R. Madison TELEPHONE f/031844-5151 OPERATING STATUS N t'5
- 1. Unit Name:
North Anna. Unir 1 snntorehar lo7o (onyignej)
- 2. Reporting Period:
3.1.acensed Thermal Power (MWt):
?775 m, _
947
- 4. Nameplate Rating (Gross MWe):
90/
S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
928 898 7'. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
N/A tyA
- 10. Reasons For Restrictions,if Any:
\\
This Month Yr. to-Date Gmulative l1. Hours in Reporting Period 720 6.961 11_ qc;q
- 12. Number Of Hours Rescror Was Critical 582.2 5.478.4 10.16; 9
- 13. Resctor Reserve Shutdown Hours 2.8 51.5 14R.3
- 14. Hours Generator On.Line SR7.2 6 401 8 in OR1 9
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1.i34,368 14,083,118 26.279.913
- 17. Gross Electrical Energy Generated (MWH) 345,793 4.449.912 R.146.144 320,744 4,188.866 7.853.446
- 18. Net Electrical Energy Generated (MWH) 80.7 82.4 86.9
- 19. Umt Service Factor 80.7 82.4 86.9
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 49.6 71.2 7E.6
- 22. Unit Capacity Factor (Using DER Net) 49.1 70.5 74 R
- 23. Unit Forced Outage Rate 0.5 4.8 3.3
- 24. Shutdowns Scheduled Over Next 6' Months (Type. Date,and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
D n e' n d o v-17 10'O
- 26. Units In Test Status IPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY dO, jlNITIAL ELECTRICITY
' COMMERCIAL OPERA TION 1937 194 (0/77 )