ML19260D095
| ML19260D095 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 01/29/1980 |
| From: | Wil Madison VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML19260D082 | List: |
| References | |
| NUDOCS 8002070402 | |
| Download: ML19260D095 (2) | |
Text
.
VIRGINIA ELECTRIC AND POWER COMPANY t10RTH ANNA POWER STAT!ON MONTHLY OPERATING REPORT MONTH July YEAR 1979 Revised 1-29-80 SUBMITTED:
N%
lN w est SUPERINTEN0gT-OPERAT10t45 APPROVED:
hf[
'(('
~
MANAGER; 1937 197 8002070
OPERATING DATA REPORT DOCKET NO.
9n_139 DATE l/<'9/MO CO WPLETED BY W. R. Madison TELEPHONE (/o3 W94-5151 OPERATING STATUS N
- 1. Unit Name:
'larth Ann' Uni
- 1
- 2. Reporting Penod:
Jul" 1070 I D o " i ' ~M
_m 3, I icenwd Themul Power (31Wt):
077r
,u m 947
- 4. Nuneplate Rating (Gross MWe):
907
- 5. Design Electrical Rating (Net MWe):
928
- 6. Sfaximum Dependable Capacity (Gross MWe):
898
- 7. 31aximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Give Reasons:
fUA
- 9. Power Level To which Restricted. !f Any (Net MWe):
II / A
- 10. Reasons For Restnctions.If Any:
IUA This Month Yr..to-Date Cumulative 744 5.087 10.104 i1. Hours In Reporting Period
- 12. Number Of Hours Resctor Was Critical 744 4,162.2 8_Plo
- 13. Reactor Reserve Shutdown Hours 0
ag_7 j a c; q
- 14. Hours Generstor On4.ine 744 4.075 R_797
- 15. Unit Reserw Shutdown Hours 0
0 n
- 16. Gross Thermal Energy Generated (MWH) l.OR7.110
- 17. Gross Electrical Energy Generated (MWH) 620,228
_ 10 ona 974
?o ini n99 3.466.7sq 7_gg7_3g2
- 18. Net Electrical Energy Generstad (MWH) 585,439 3.270.1R7
(;_olo 767
- 19. Unit Semce Factor 100 80.1 pg 4
- 20. Urut Availability Factor 100 80.I 86.4 8/.6 71.6 76.4
- 21. Urut Capacity Factcr (Using MDC Net) 60.4 10.9 75.7
- 22. Unit Capadty Fac%r tUsing DER Net) 0 6.2 3.8
- 23. Unit Forced Gutage Rate
- 24. Shutdowns Scheduled Over Next 6 3fonths (Type. Date and Duration of Each):
Rafualinq: Sootarbar_ Octobar_ Nnunmhnr nna n,-n + r.
19, a. -
fuA 25.17 Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Ye;r Status IPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
't INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 198 e,m