Revised Monthly Operating Rept for Jul 1979
ML19260D095
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/29/1980
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19260D082 List:
References
NUDOCS 8002070402
Download: ML19260D095 (2)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY t10RTH ANNA POWER STAT!ON MONTHLY OPERATING REPORT MONTH July YEAR 1979 Revised 1-29-80 SUBMITTED:

N% lN w est SUPERINTEN0gT-OPERAT10t45 APPROVED:

hf[~

'((' "

MANAGER; 1937 197 8002070

OPERATING DATA REPORT DOCKET NO. 9n_139 DATE l/<'9/MO CO WPLETED BY W. R. Madison TELEPHONE (/o3 W94-5151 OPERATING STATUS N

1. Unit Name: 'larth Ann' Uni
  • 1
2. Reporting Penod: Jul" 1070 I D o " i ' ~M

,. --- _m 3, I icenwd Themul Power (31Wt): 077r , , , , , , , , , ,,_,,.&,_, ,u m

4. Nuneplate Rating (Gross MWe): 947 *
5. Design Electrical Rating (Net MWe): 907
6. Sfaximum Dependable Capacity (Gross MWe): 928
7. 31aximum Dependable Capacity (Net MWe): 898
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Give Reasons:

fUA

9. Power Level To which Restricted. !f Any (Net MWe): II / A
10. Reasons For Restnctions.If Any: IUA This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 744 5.087 10.104
12. Number Of Hours Resctor Was Critical 744 4,162.2 8_Plo
13. Reactor Reserve Shutdown Hours 0 ag_7 j a c; q
14. Hours Generstor On4.ine 744 4.075 ,

R_797

15. Unit Reserw Shutdown Hours 0 0 n
16. Gross Thermal Energy Generated (MWH) l.OR7.110 _ 10 ona 974 ?o ini n99
17. Gross Electrical Energy Generated (MWH) 620,228 , _ , ,

3.466.7sq 7_gg7_3g2

18. Net Electrical Energy Generstad (MWH) 585,439 3.270.1R7 (;_olo 767
19. Unit Semce Factor 100 80.1 pg 4
20. Urut Availability Factor 100 80.I 86.4
21. Urut Capacity Factcr (Using MDC Net) 8/.6 71.6 76.4
22. Unit Capadty Fac%r tUsing DER Net) 60.4 10.9 75.7
23. Unit Forced Gutage Rate 0 6.2 3.8
24. Shutdowns Scheduled Over Next 6 3fonths (Type. Date and Duration of Each):

Rafualinq: Sootarbar_ Octobar_ Nnunmhnr nna n,-n + r. 19 , a. -

25.17 Shut Down At End Of Report Period. Estimated Date of Startup: fuA

26. Units in Ye;r Status IPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY

't INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 198 e,m