ML19260D095

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jul 1979
ML19260D095
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/29/1980
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19260D082 List:
References
NUDOCS 8002070402
Download: ML19260D095 (2)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY t10RTH ANNA POWER STAT!ON MONTHLY OPERATING REPORT MONTH July YEAR 1979 Revised 1-29-80 SUBMITTED:

N%

lN w est SUPERINTEN0gT-OPERAT10t45 APPROVED:

hf[

'(('

~

MANAGER; 1937 197 8002070

OPERATING DATA REPORT DOCKET NO.

9n_139 DATE l/<'9/MO CO WPLETED BY W. R. Madison TELEPHONE (/o3 W94-5151 OPERATING STATUS N

1. Unit Name:

'larth Ann' Uni

  • 1
2. Reporting Penod:

Jul" 1070 I D o " i ' ~M

_m 3, I icenwd Themul Power (31Wt):

077r

,u m 947

4. Nuneplate Rating (Gross MWe):

907

5. Design Electrical Rating (Net MWe):

928

6. Sfaximum Dependable Capacity (Gross MWe):

898

7. 31aximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Give Reasons:

fUA

9. Power Level To which Restricted. !f Any (Net MWe):

II / A

10. Reasons For Restnctions.If Any:

IUA This Month Yr..to-Date Cumulative 744 5.087 10.104 i1. Hours In Reporting Period

12. Number Of Hours Resctor Was Critical 744 4,162.2 8_Plo
13. Reactor Reserve Shutdown Hours 0

ag_7 j a c; q

14. Hours Generstor On4.ine 744 4.075 R_797
15. Unit Reserw Shutdown Hours 0

0 n

16. Gross Thermal Energy Generated (MWH) l.OR7.110
17. Gross Electrical Energy Generated (MWH) 620,228

_ 10 ona 974

?o ini n99 3.466.7sq 7_gg7_3g2

18. Net Electrical Energy Generstad (MWH) 585,439 3.270.1R7

(;_olo 767

19. Unit Semce Factor 100 80.1 pg 4
20. Urut Availability Factor 100 80.I 86.4 8/.6 71.6 76.4
21. Urut Capacity Factcr (Using MDC Net) 60.4 10.9 75.7
22. Unit Capadty Fac%r tUsing DER Net) 0 6.2 3.8
23. Unit Forced Gutage Rate
24. Shutdowns Scheduled Over Next 6 3fonths (Type. Date and Duration of Each):

Rafualinq: Sootarbar_ Octobar_ Nnunmhnr nna n,-n + r.

19, a. -

fuA 25.17 Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units in Ye;r Status IPrior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY

't INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 198 e,m