VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH August YEAR 1979 Revised 1-29-80 SUBMITTED:

\\ Sd E.E.w.,A SUPERINTENDENL - OPERATIONS APPROVED:

MANAGE 8

/

1937 195 800207e

<399

OPERATING DATA REPORT DOCI(IT NO.

50-3P DATE l/d' Y COMPLETED BY W. R. TIIdison TELEPHONE

/ud)m4-5151 OPERATING STATUS North Anna, Unit 1 N

5

1. Unit Name:
2. Reporting Period:

Aono' 1070 / Pn "i c o rn 2775

- - --,1. Licensed Thermal Power (MWt):

' ~~

~~~'

N'

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

907 928

6. Maximum Dependable Capacity (Gross MWe):

898 7'. Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report. Give Reasons:

N /A

9. Power Level To Which Restricted. If Any (Net MWe):

M/A

10. Reasons For Restrictioni,If Any:

N/A This Month Yr..to-Date Cumulative 744 5.811 10 Ra9

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 744 4,896.2 9.581
13. Reactor Reserve Shutdown Hours 0

4A 7 1as c

14. Hours Generator On-Line 744 4.810 1 4 471
15. Unit Resen e Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2,044,516 12.948.750 29_14s Aac
17. Gross Electrical Energy Generated (MWH) 633.164 4 1n0 llo o nno ccc
18. Net Electrical Energy Generated (MWH) 597,915 1 RA9 177 7 q19 7no
19. Unit Service Factor 100 R? 6 A7 1
20. Unit Availabdity Factor 100 92.6 87.3 89.5 73.9 77.3
21. Unit Capacity Fsetor IUsing MDC Net) 88.6 73.1 76.6
22. Unit Capreity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

5.3 3.5

24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

Refuelinc; Seoternber. Octobar. Nnvernbe r _ naromhor-19 4..nn te e

25. If Shur Do vn At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status iPrior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY

(,

INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 196 t oi- >