b d
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH August YEAR 1979 Revised 1-29-80 SUBMITTED:
\\ Sd E.E.w.,A SUPERINTENDENL - OPERATIONS APPROVED:
MANAGE 8
/
1937 195 800207e
<399
OPERATING DATA REPORT DOCI(IT NO.
50-3P DATE l/d' Y COMPLETED BY W. R. TIIdison TELEPHONE
/ud)m4-5151 OPERATING STATUS North Anna, Unit 1 N
5
- 1. Unit Name:
- 2. Reporting Period:
Aono' 1070 / Pn "i c o rn 2775
- - --,1. Licensed Thermal Power (MWt):
' ~~
~~~'
N'
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
907 928
- 6. Maximum Dependable Capacity (Gross MWe):
898 7'. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report. Give Reasons:
N /A
- 9. Power Level To Which Restricted. If Any (Net MWe):
M/A
- 10. Reasons For Restrictioni,If Any:
N/A This Month Yr..to-Date Cumulative 744 5.811 10 Ra9
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 744 4,896.2 9.581
- 13. Reactor Reserve Shutdown Hours 0
4A 7 1as c
- 14. Hours Generator On-Line 744 4.810 1 4 471
- 15. Unit Resen e Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,044,516 12.948.750 29_14s Aac
- 17. Gross Electrical Energy Generated (MWH) 633.164 4 1n0 llo o nno ccc
- 18. Net Electrical Energy Generated (MWH) 597,915 1 RA9 177 7 q19 7no
- 19. Unit Service Factor 100 R? 6 A7 1
- 20. Unit Availabdity Factor 100 92.6 87.3 89.5 73.9 77.3
- 21. Unit Capacity Fsetor IUsing MDC Net) 88.6 73.1 76.6
- 22. Unit Capreity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
5.3 3.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
Refuelinc; Seoternber. Octobar. Nnvernbe r _ naromhor-19 4..nn te e
- 25. If Shur Do vn At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status iPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY
(,
INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 196 t oi- >