VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH December YEAR 1979 Revised 1-29-80 SUBMITTED:
hD G.. o n A SUPERINTENDEST - OPERATIONS APPROVED:
M W s W - l-MANAGER 3 1937 187 8002070 33 0
OPERATING DATA REPORT DOCKET NO.60-179 DATE I/ N HO COMPLETED BY I4 P M'dison TELEPHONE
/031844-5151 OPERATING STATUS North Anna, Unit 1 Notes December 1979 (Revised)
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
977R
- 4. Nameplate Rating (Gross'MWe):
Qa7 907
- 5. Design Electrical Rating (Net MWe):
928
- 6. Maximum Dependable Capacity (Gross MWe):
898 7'. Maximum Dependable Capacity (Net MWe):
- 3. If Changes Occur in Capacity Ratings (Items Number 3 nrough 7) Since I_ut Report. Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
nis Month Yr.-to-Date Cumulative 744 8.760 17.777 i1. Hours In Reporting Period 0
5.478.4 in 165 7
- 12. Number Of Hours Reactor Was Critical 0
51.5 148.3
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 0
6.401 5 in nq7 9
- 15. Unit Reserve Shutdown Hours 0
o n
0 1 a.0R 3.118 26 770 - 417
- 16. Gross Thermal Energy Generated (MWH) 0 4.445.917 g.346_14q
- 17. Gross Electrical Energy Generated (MWH) 0 4,188,866 7,853.446
- 18. Net Electrical Energy Generated (MWH) 0 61.7 73.0
- 19. Umt Service Factor O
61.7 73.0
- 20. Unit Avulability Factor 0
53.7 63.5
- 21. Unit Capacity Factor (Using MDC Net)
U 52./
62.8
- 22. Unit Capacity Factor (Using DER Net)
U 4.8 3.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
H in
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
Im"'"y in icon
- 26. Units In Test Status (Prior to Commerci:1 Operation):
Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 188
-m