VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH December YEAR 1979 Revised 1-29-80 SUBMITTED:

hD G .. o n A SUPERINTENDEST - OPERATIONS APPROVED:

M W s W - l-MANAGER 3 1937 187 8002070 33 0

OPERATING DATA REPORT DOCKET NO.60-179 DATE I/ N HO COMPLETED BY I4 P M'dison TELEPHONE /031844-5151 OPERATING STATUS North Anna, Unit 1 Notes

2. Reporting Period: December 1979 (Revised)
3. Licensed Thermal Power (MWt): 977R ,
4. Nameplate Rating (Gross'MWe): Qa7
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 928 7'. Maximum Dependable Capacity (Net MWe):

898

3. If Changes Occur in Capacity Ratings (Items Number 3 nrough 7) Since I_ut Report. Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A nis Month Yr.-to-Date Cumulative i1. Hours In Reporting Period 744 8.760 17.777
12. Number Of Hours Reactor Was Critical 0 5.478.4 in 165 7
13. Reactor Reserve Shutdown Hours 0 51.5 148.3
14. Hours Generator On-Line 0 6.401 5 in nq7 9
15. Unit Reserve Shutdown Hours 0 o n
16. Gross Thermal Energy Generated (MWH) 0 1 a .0R 3.118 26 770 - 417
17. Gross Electrical Energy Generated (MWH) 0 _,

4.445.917 g.346_14q 0 4,188,866 7,853.446

18. Net Electrical Energy Generated (MWH)
19. Umt Service Factor 0 61.7 73.0
20. Unit Avulability Factor O 61.7 73.0
21. Unit Capacity Factor (Using MDC Net) 0 53.7 63.5
22. Unit Capacity Factor (Using DER Net)

U 52./ 62.8

23. Unit Forced Outage Rate U 4.8 3.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): .'

H in

25. If Shur Down At End Of Report Period. Estimated Date of Startup: Im"'"y in icon
26. Units In Test Status (Prior to Commerci:1 Operation): Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 188 -m