Revised Monthly Operating Rept for Dec 1979
ML19260D083
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/29/1980
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19260D082 List:
References
NUDOCS 8002070370
Download: ML19260D083 (2)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH December YEAR 1979 Revised 1-29-80 SUBMITTED:

hD G.. o n A SUPERINTENDEST - OPERATIONS APPROVED:

M W s W - l-MANAGER 3 1937 187 8002070 33 0

OPERATING DATA REPORT DOCKET NO.60-179 DATE I/ N HO COMPLETED BY I4 P M'dison TELEPHONE

/031844-5151 OPERATING STATUS North Anna, Unit 1 Notes December 1979 (Revised)

2. Reporting Period:
3. Licensed Thermal Power (MWt):

977R

4. Nameplate Rating (Gross'MWe):

Qa7 907

5. Design Electrical Rating (Net MWe):

928

6. Maximum Dependable Capacity (Gross MWe):

898 7'. Maximum Dependable Capacity (Net MWe):

3. If Changes Occur in Capacity Ratings (Items Number 3 nrough 7) Since I_ut Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

nis Month Yr.-to-Date Cumulative 744 8.760 17.777 i1. Hours In Reporting Period 0

5.478.4 in 165 7

12. Number Of Hours Reactor Was Critical 0

51.5 148.3

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 0

6.401 5 in nq7 9

15. Unit Reserve Shutdown Hours 0

o n

0 1 a.0R 3.118 26 770 - 417

16. Gross Thermal Energy Generated (MWH) 0 4.445.917 g.346_14q
17. Gross Electrical Energy Generated (MWH) 0 4,188,866 7,853.446
18. Net Electrical Energy Generated (MWH) 0 61.7 73.0
19. Umt Service Factor O

61.7 73.0

20. Unit Avulability Factor 0

53.7 63.5

21. Unit Capacity Factor (Using MDC Net)

U 52./

62.8

22. Unit Capacity Factor (Using DER Net)

U 4.8 3.3

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

H in

25. If Shur Down At End Of Report Period. Estimated Date of Startup:

Im"'"y in icon

26. Units In Test Status (Prior to Commerci:1 Operation):

Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 188

-m