Updated Inspection Plan for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2019005 and 05000265/2019005)
ML19240A380
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/28/2019
From: Kenneth Riemer
Division Reactor Projects III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019005
Download: ML19240A380 (7)


Text

August 28, 2019 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: UPDATED INSPECTION PLAN FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (REPORT 05000254/2019005 AND 05000265/2019005

) Dear Mr. Hanson

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 21 , for the Quad Cities Nuclear Power Station, Units 1 and 2

. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections"), and other changes to the baseline inspection program described in SECY-19-0067, "Recommendations for Enhancing the Reactor Oversight Process." Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 202 The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change B. Hanson - 2 - This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Please contact me at 630-829-9628 with any questions you have regarding this lette

Sincerely,

/RA/ Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects Docket No ; 50-265 and 72-05 3 License No DPR-29 and DPR-30 Enclosure:

Inspection Plan cc: Distribution via LISTSERV