UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 3, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
ANNUAL ASSESSMENT LETTER - QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (05000254/2010001; 05000265/2010001)
Dear Mr. Pardee:
On February 11, 2010, the NRC staff completed its performance review of Quad Cities Nuclear Power Station, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information.
A separate letter designated and marked as "Official Use Only -- Security Information" will include the Security Cornerstone review and resultant inspection plan.
Overall, Quad Cities Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
Additional inspections scheduled include: independent spent fuel storage installation operation, triennial engineering permanent modifications and 50.59, biennial problem identification and resolution, and post-approval license renewal. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.
C. Pardee In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30
Enclosure:
Quad Cities Inspection/Activity Plan cc w/encl: Distribution via ListServe
C. Pardee In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30
Enclosure:
Quad Cities Inspection/Activity Plan cc w/encl: Distribution via ListServe DOCUMENT NAME: G:\\1-SECY\\1-WORK IN PROGRESS\\2009 EOC LETTERS\\QUAD CITIES 2009 EOC LETTER.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E
RIII RIII RIII NAME MRing:cms DATE 03/03/10 OFFICIAL RECORD COPY
Letter to C. Pardee from M. Ring dated March 3, 2010
SUBJECT:
ANNUAL ASSESSMENT LETTER - QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (05000254/2010001; 05000265/2010001)
DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMQuad Cities RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates Start End Inspection Activity Title No. of Staff on Site Quad Cities BI ENG
- ENGINEERING INSERVICE INSPECTION 1
IP Inservice Inspection Activities - BWR 7111108G 03/15/2010 04/02/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/29/2010 04/02/2010 IP Occupational ALARA Planning and Controls 71124.02 03/29/2010 04/02/2010 IP Occupational Dose Assessment 71124.04 03/29/2010 04/02/2010 IP Occupational Exposure Control Effectiveness 71151-OR01 03/29/2010 04/02/2010 BI ENG
- TRIENNIAL ENGINEERING PERM MODS/50.59 3
IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/26/2010 05/14/2010 ISFSI
- ISFSI INSPECTION 3
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2010 09/30/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 06/07/2010 06/17/2010 IP Occupational Dose Assessment 71124.04 06/07/2010 06/17/2010 IP Public Radiation Safety 71124.07 06/07/2010 06/17/2010 BI PI&R
- BIENNIAL PI&R INSPECTION 4
IP Identification and Resolution of Problems 71152B 08/09/2010 09/03/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/13/2010 09/17/2010 IP Occupational Dose Assessment 71124.04 09/13/2010 09/17/2010 IP Reactor Coolant System Activity 71151-BI01 09/13/2010 09/17/2010 BI EP
- EP EXERCISE INSPECTION / PI VERIFICATION 3
IP Exercise Evaluation 7111401 11/15/2010 11/19/2010 IP Drill/Exercise Performance 71151-EP01 11/15/2010 11/19/2010 IP ERO Drill Participation 71151-EP02 11/15/2010 11/19/2010 IP Alert & Notification System 71151-EP03 11/15/2010 11/19/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 12/06/2010 12/10/2010 IP RETS/ODCM Radiological Effluent 71151-PR01 12/06/2010 12/10/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiation Monitoring Instrumentation 71124.05 03/14/2011 03/18/2011 RENEWAL
- LICENSE RENEWAL 71003 - PHASE 1 - U1 1
IP Post-Approval Site Inspection for License Renewal 71003 05/09/2011 06/04/2011
Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates Start End Inspection Activity Title No. of Staff on Site Quad Cities BI ENG
- ENGINEERING INSERVICE INSPECTION - U1 1
IP Inservice Inspection Activities - BWR 7111108G 05/09/2011 06/09/2011 OL PREP
- QUAD CITIES INIT PREP - 05/2011 3
OL - INITIAL EXAM - MAY/JUN 2011 - QUAD W90225 05/09/2011 05/13/2011 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 05/16/2011 05/20/2011 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/16/2011 05/20/2011 IP Occupational ALARA Planning and Controls 71124.02 05/16/2011 05/20/2011 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/16/2011 05/20/2011 IP Occupational Exposure Control Effectiveness 71151-OR01 05/16/2011 05/20/2011 OL EXAM
- QUAD CITIES INIT EXAM - MAY-JUNE/2011 3
OL - INITIAL EXAM - MAY/JUN 2011 - QUAD W90225 05/30/2011 06/10/2011