ML12249A410

From kanterella
Jump to navigation Jump to search
Mid-Cycle Assessment Letter for Quad Cities Nuclear Power Station, Unit 1 and 2
ML12249A410
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/04/2012
From: Ring M
NRC/RGN-III/DRP/B1
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
Download: ML12249A410 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 4, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER - QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2

Dear Mr. Pacilio:

On August 8, 2012, the NRC completed its mid-cycle performance review of Quad Cities Nuclear Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The assessment reflects the integration of the Security Cornerstone into Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

The NRC determined the performance at Quad Cities, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Inspections planned include Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal. Also planned are Post-Fukushima Temporary Instructions (TI) 2515/187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI 2515/188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (630) 829-9703 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254, 50-265 License Nos. DPR-29, DPR-30

Enclosure:

Inspection Plan cc w/encl: Distribution via ListServ

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (630) 829-9703 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254, 50-265 License Nos. DPR-29, DPR-30

Enclosure:

Inspection Plan cc w/encl: Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: Quad Cities MOC 2012 Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E

RIII RIII RIII NAME MRing:rj DATE 08/27/12 OFFICIAL RECORD COPY

Letter to M. Pacilio from M. Ring dated September 4, 2012

SUBJECT:

MID-CYCLE ASSESSMENT LETTER - QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 DISTRIBUTION:

Silas Kennedy RidsNrrDorlLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Quad Cities Inspection / Activity Plan 09/01/2012 - 12/31/2013 TI-187

- TI-187 FLOODING WALKDOWN 2

IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/01/2012 12/30/2012 TI-188

- TI-188 SEISMIC WALKDOWN 2

IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/02/2012 12/31/2012 BI HS

- TRIENNIAL HEAT SINK INSPECTION 2

IP Heat Sink Performance 7111107T 09/17/2012 09/21/2012 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2012 09/28/2012 IP Occupational Dose Assessment 71124.04 09/24/2012 09/28/2012 IP Reactor Coolant System Activity 71151-BI01 09/24/2012 09/28/2012 IP Occupational Exposure Control Effectiveness 71151-OR01 09/24/2012 09/28/2012 IP RETS/ODCM Radiological Effluent 71151-PR01 09/24/2012 09/28/2012 BI OLRQ

- REQUALIFICATION PROGRAM INSPECTION 1

IP Licensed Operator Requalification Program - Annual Review 7111111A 10/15/2012 10/19/2012 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP Occupational ALARA Planning and Controls 71124.02 10/15/2012 10/19/2012 IP Radiation Monitoring Instrumentation 71124.05 10/15/2012 10/19/2012 RENEWAL

- LICENSE RENEWAL INSPECTION 71003 PHASE 2 7

IP Post-Approval Site Inspection for License Renewal 71003 10/22/2012 11/09/2012 BI EPX

- EP EXERCISE INSPECTION / PI VERIFICATION 2

IP Exercise Evaluation 7111401 12/03/2012 12/07/2012 IP Performance Indicator Verification 71151 12/03/2012 12/07/2012 TI INSP

- TI 182 BURIED PIPE PHASE 2 1

IP Inservice Inspection Activities - BWR 7111108G 01/14/2013 01/18/2013 BI MODS

- TRIENNIAL PERM MODS/50.59 1

IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/29/2013 05/17/2013 ISI INSP

- ISI BASELINE 1

IP Inservice Inspection Activities - BWR 7111108G 03/11/2013 03/29/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/18/2013 03/22/2013 IP Occupational ALARA Planning and Controls 71124.02 03/18/2013 03/22/2013 INSP

- OP EXP SS FY2007-03 CRANE AND HEAVY LIFT 1

IP Refueling and Other Outage Activities 7111120 05/06/2013 05/24/2013

Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Quad Cities Inspection / Activity Plan 09/01/2012 - 12/31/2013 ISFSI

- ISFSI INSPECTION - SCHEDULE DEPENDENT 2

IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2013 08/31/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/03/2013 06/07/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP Occupational ALARA Planning and Controls 71124.02 09/16/2013 09/20/2013 IP Reactor Coolant System Activity 71151-BI01 09/16/2013 09/20/2013 IP Occupational Exposure Control Effectiveness 71151-OR01 09/16/2013 09/20/2013 IP RETS/ODCM Radiological Effluent 71151-PR01 09/16/2013 09/20/2013 BI EPR

- EP ROUTINE INSPECTION / PI VERIFICATION 2

IP Alert and Notification System Testing 7111402 10/21/2013 10/25/2013 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 10/21/2013 10/25/2013 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 10/21/2013 10/25/2013 IP Performance Indicator Verification 71151 10/21/2013 10/25/2013 BI OLRQ

- BIENNIAL REQUAL PROGRAM INSPECTION 2

IP Licensed Operator Requalification Program 7111111B 10/07/2013 10/11/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 10/21/2013 10/25/2013 IP Radiological Environmental Monitoring Program 71124.07 10/21/2013 10/25/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/21/2013 10/25/2013 IP Occupational Dose Assessment 71124.04 10/21/2013 10/25/2013 IP Reactor Coolant System Activity 71151-BI01 10/21/2013 10/25/2013 IP Occupational Exposure Control Effectiveness 71151-OR01 10/21/2013 10/25/2013 IP RETS/ODCM Radiological Effluent 71151-PR01 10/21/2013 10/25/2013 OL PREP

- QUAD CITIES INIT PREP 12/2013 3

OL - INITIAL EXAM - 2014 MARCH/APRIL - QUAD W90292 12/16/2013 12/20/2013