ML20183A285
| ML20183A285 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 07/01/2020 |
| From: | James Neurauter NRC/RGN-III/DRS/EB1 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| IR 2020011 | |
| Download: ML20183A285 (10) | |
See also: IR 05000254/2020011
Text
July 01, 2020
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: QUAD CITIES NUCLEAR POWER STATION REQUEST FOR INFORMATION
FOR AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE
INSPECTION (TEAM): INSPECTION REPORT 05000254/2020011 AND
Dear Mr. Hanson:
On August 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial
baseline Design Bases Assurance Inspection (Team) at Quad Cities Nuclear Power Station.
This inspection will be performed in accordance with NRC Baseline Inspection Procedure
The Design Bases Assurance Inspection focuses on the design, maintenance, and operation of
risk significant components with low margin, or associated with an accident scenario, or a
specific system. The inspection also monitors the implementation of modifications to structures,
systems, and components as modifications to one system may also affect the design bases and
functioning of interfacing systems as well as introduce the potential for common cause failures.
The components and modifications to be reviewed during this baseline inspection will be
identified as part of the preparation for the inspection and finalized during the inoffice
preparation week that occurs prior to the first onsite inspection week. In addition, operating
experience issues, associated with the component samples, will also be selected for review.
The inspection team may request scenarios to be performed on the simulator. This request
would require support from your simulator staff to validate scenarios, simulator time, and a crew
to perform the actions which would most likely occur during the second onsite week. The team
will work closely with your staff early on during the inspection process to ensure this activity can
be accomplished with minimal impact.
The inspection will include 2 weeks onsite. The inspection team will consist of six NRC
inspectors who will focus on engineering/maintenance/operations of the selected components
and modifications. The current inspection schedule is as follows:
Preparation week:
August 24 - 28, 2020
Onsite weeks:
August 31 - September 4, 2020, and September 14 - 18, 2020
Experience with previous baseline design/modification inspections of similar depth and length
has shown that this type of inspection is extremely resource intensive, both for the NRC
inspectors and the licensee staff. In order to minimize the inspection impact on the site and to
ensure a productive inspection for both parties, we have enclosed a request for information
needed for the inspection.
B. Hanson
- 2 -
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into four groups:
The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than July 17, 2020.
The lead inspector will communicate the initial selected set of samples no later than
July 31, 2020.
The second group of documents requested is those items needed to support our in-
office preparation activities. This set of documents should be provided to the lead
inspector at the Regional Office no later than August 14, 2020. During the in-office
preparation activities, the team may identify additional information needed to support the
inspection.
The third group includes the additional information above as well as plant specific
reference material. This information should be available to the team onsite on
August 31, 2020.
The last group includes supporting information to be provided throughout the inspection.
Specifically, corrective action documents and questions developed during the inspection
are requested to be provided as the documents are generated.
In addition, the enclosure includes information and requests addressing inspection logistics.
The lead inspector for this inspection is James Neurauter. We understand that our licensing
contact for this inspection is Richard Swart of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at 630-829-9828 or via e-mail at james.neurauter@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
B. Hanson
- 3 -
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
James E. Neurauter, Senior Reactor Inspector
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-254; 50-265
Enclosure:
Design Bases Assurance Inspection
Document Request
cc: Distribution via LISTSERV
B. Hanson
- 4 -
Letter to Bryan C. Hanson from James E. Neurauter, dated July 01, 2020.
SUBJECT: QUAD CITIES NUCLEAR POWER STATION REQUEST FOR INFORMATION
FOR AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE
INSPECTION (TEAM): INSPECTION REPORT 05000254/2020011;
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMQuadCities Resource
RidsNrrDroIrib Resource
Kenneth OBrien
DRPIII
DRSIII
ADAMS Accession Number: ML20183A285
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
OFFICE
RIII
NAME
JNeurauter:mb via
DATE
07/01/2020
OFFICIAL RECORD COPY
Enclosure
DESIGN BASES ASSURANCE INSPECTION (TEAMS)
REQUEST FOR INFORMATION
I. ADMINISTRATIVE INSPECTION INFORMATION
Inspection Report Number:
05000254/2020011; 05000265/2020011
Onsite Inspection Dates:
August 31-September 4, 2020; and September 14-18, 2020
Inspection Procedure:
IP 71111.21M, Design Bases Assurance Inspection (Team)
Lead Inspector:
James Neurauter, Senior Reactor Inspector, DRS
630-829-9828
james.neurauter@nrc.gov
Teammates:
Jamie Benjamin, Senior Reactor Inspector, RIII/DRS
Benny Jose, Senior Reactor Inspector, RIII/DRS
Matthew Domke, Reactor Inspector, RIII/DRS
Vance Petrella, Reactor Inspector, RIII/DRS
William Hopf, NRC Electrical Contractor
II. LOGISTICS
Email the following inspection logistics to the lead inspector by August 14, 2020, or sooner:
1. Inspection room name/number, directions from the main access facility, and phone number;
2. Interview room name/number;
3. Response team contact information (names and phone numbers) and team roles (e.g.,
management sponsor, lead, inspector counterpart);
4. Any site access/badging actions needed for each inspector;
5. Any dosimetry actions needed for each inspector;
6. Entrance meeting time (preferably after 1:30 p.m. Central Time) and location;
7. Confirmation that the team will have access to a licensee computer with a nearby printer;
8. Confirmation that the team will have Wi-Fi access;
9. Cafeteria location and hours;
10. Current management and engineering organizational chart;
11. Engineering staff normal working hours; and
12. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff
meetings).
2
III. INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions regarding this
information request. Provide the information electronically in pdf files, Excel, or other
searchable formats, preferably on some portable electronic media (e.g., CD-ROM, DVD). The
files should contain descriptive names and be indexed and hyperlinked to facilitate ease of use.
Information in lists should contain enough information to be easily understood by someone
who has knowledge of light water reactor technology.
1. Information Requested for Selection of Components/Modifications
The following information is requested by July 17, 2020, or sooner, to facilitate the initial
sample selection.
1.1. Risk-ranking of top 250 components from your site-specific probabilistic safety analysis
(PSA) sorted by Risk-Achievement Worth (RAW). Include values for Birnbaum
Importance, Risk-Reduction Worth, and Fussell-Veseley (as applicable). Provide any
basic event mapping used to develop the ranking of components.
1.2. Risk-ranking of top 100 containment-related components (i.e. Large Early Release
Frequency (LERF)) from your site-specific PSA sorted by RAW. See examples in
Inspection Manual Chapter 0609, Appendix H, Table 4.1, Containment-Related SSCs
Considered for LERF Implications. Provide any basic event mapping used to develop
the ranking of components.
1.3. Provide a list of the top 200 cut-sets from your PSA. Provide the descriptions of the
basic events in the list of cut-sets.
1.4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that
contributes more than 5 percent to the baseline plant core damage frequency.
1.5. Copies of PSA system notebooks, Human Error Reliability Analysis Notebook, and
latest PSA summary document.
1.6. If you have an External Events or Fire PSA Model, provide the information requested
in Items 1 and 2 for external events and fire. Provide narrative description of each
coded event (including fire, flood zone description).
1.7. Provide copies of the emergency operating procedures and abnormal operating
procedures.
1.8. Electronic copy of the site Individual Plant Examination of External Events, if available.
1.9. Provide the in-service testing program (IST) document identifying the in-scope valves
and pumps, and the associated IST program requirements for each component (e.g.,
IST valve table identifying category, active/passive function).
1.10. List of high-risk Maintenance Rule systems/components based on engineering or
expert panel judgment (i.e., those systems/components not identified high risk in the
PSA).
3
1.11. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category
for the last 3 years.
1.12. A list of operating experience evaluations for the last 3 years.
1.13. Information of any common cause failure of components experienced in the last 5
years at your facility.
1.14. List of Root Cause Evaluations associated with component failures or design issues
initiated/completed in the last 5 years.
1.15. List of open operability evaluations.
1.16. List of permanent plant modifications to SSCs that are field work complete. For the
purpose of this inspection, permanent plant modifications include permanent:
1.16.1 Plant changes, design changes, set point changes, completed in the last 5
years;
1.16.2 Equivalency evaluations, suitability analyses, and commercial grade
dedications completed in the last 3 years;
1.16.3 Procedure changes for EOPs, AOPs, surveillances, and test procedures in the
last 3 years; and
1.16.4 Calculation changes that have been issued for use in the last 3 years.
Note: Items 1.16.1. through 1.16.4. should be provided as separate, individual lists and
each list should contain the number of each document, title, revision/date, and the
affected system.
1.17. List of all time critical and/or risk significant operator actions. Identify those actions
that do not have job performance measures.
1.18. Copies of procedures addressing the following: modifications, design changes, set
point changes, equivalency evaluations or suitability analyses, commercial grade
dedications, and post-modification testing.
1.19. A list of corrective action documents (open and closed) in the last 3 years that address
permanent plant modifications issues, concerns, or processes. These documents
should also include the corrective action documents associated with the modification
implementation.
1.20. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,
Technical Specifications Bases, and Technical Requirements Manual.
1.21. Electronic copies of simplified plant drawings (if available). Note: these may be
uncontrolled documents such as big notes, training diagrams, etc.
4
2. Information Requested (for the approximate 7 selected components and 7 selected
modifications) to be Available by August 14, 2020, (will be reviewed by the team in the
Regional office during the weeks of August 17 and August 24, 2020)
This information should be separated for each selected component or modification,
especially if provided electronically (e.g., folder with component or modification name that
includes calculations, condition reports, maintenance history, etc.). Items 2.1- 2.16 are
associated with the selected components and item 2.17 for the selected modifications.
2.1. List of condition reports (corrective action documents) associated with each of the
selected components for the last 6 years.
2.2. The maintenance history (corrective, preventive, and elective) associated with each of
the selected components for the last 10 years. Identify frequency of preventive
maintenance activities.
2.3. Aging Management Program documents applicable to each selected component.
2.4. Copies of calculations associated with each of the selected components, excluding
data files. [Pipe stress calculations excluded from this request].
2.5. Provide an all-inclusive list of calculation revisions in effect associated with each of the
selected components. Include document number, title, and revision number.
2.6. Electronic copies of electrical drawings (ac and dc) and key diagrams.
2.7. Electronic copy of Piping and Instrumentation Drawings (P&IDs) (if available).
2.8. System Health Reports, System Descriptions, Design Basis Documents, and/or
Training Lesson Plans associated with each of the selected components.
2.9. A list of modifications, including equivalency evaluations and setpoint changes,
associated with each of the selected components. This list should include a
descriptive paragraph on the purpose of the modification. Please ensure this list only
includes design completed (not canceled) modifications.
2.10. Copies of operability evaluations (open/closed for last 3 years) associated with each of
the selected components and plans for restoring operability, if applicable.
2.11. Copies of selected operator work-around evaluations associated with each of the
selected components and plans for resolution, if applicable.
2.12. Copies of any open temporary modifications associated with each of the selected
components, if applicable.
2.13. Trend data on the selected electrical/mechanical components performance for last
3 years (For example, pumps performance including in-service testing, other vibration
monitoring, oil sample results, etc., for valves: stroke time and leak rate results,
diagnostic trend data, etc.).
5
2.14. Provide copies of the normal and alarm response procedures associated with the
selected components and selected scenarios.
2.15. Procedures addressing time critical and/or risk significant operator actions.
2.16. Completed tests and surveillances for each selected component performed during the
last 3 years. For those tests and surveillances performed at a periodicity of greater
than 3 years, provide the latest two performed. Include the associated acceptance
criteria basis calculations.
2.17. For each of the selected modifications, copies of associated documents such as
modification package, engineering changes, 50.59 screening or evaluation,
calculations, post-modification test packages, corrective action documents, design
drawings, preventive maintenance requirements and procedures, etc.
2.18. Corrective Action Program procedures, including the operability/functionality
determination procedure.
2.19. Quality Assurance Program document/procedure.
2.20. A copy of any internal/external self-assessments and associated corrective action
documents generated in preparation for the inspection.
2.21. A copy of engineering/operations related audits completed in the last 2 years.
3. Additional Information to be Provided on August 31, 2020 Onsite (for final selected
components and modifications)
3.1. During the in-office preparation activities, the team will be making final selections and
may identify additional information needed to support the inspection. The lead
inspector will provide a list of the additional information needed during the week of
August 24, 2020.
3.2. Schedule of any testing/maintenance activities to be conducted on the selected
components during the two onsite inspection weeks.
4. Information Requested to be Provided Throughout the Inspection
4.1. Any corrective action documents generated as a result of the teams questions during
this inspection as the documents are generated.
4.2. List of questions and/or document requests submitted by the team and their status
(e.g., open, closed) sorted by inspector. Provide daily by 2:30 p.m. to each inspector.
It is recommended to provide the team leader with a master list sorted by inspector
and each inspector with a list containing only the items originated by that inspector.
4.3. If available in hardcopy form, one complete set of P&IDs and simplified drawings (e.g.,
training schematics). If any of these documents is not available in hardcopy form,
contact the lead inspector.
6
4.4. Please ensure that other supporting documents for the selected items have been
located and are readily retrievable as the inspection team will likely be requesting
these documents during the inspection. Examples of supporting documents are:
4.4.1 Individual Plant Examination/Probabilistic Risk Assessment report;
4.4.2 Procurement documents for components and modifications selected (verify
retrievable);
4.4.3 Plant procedures (normal, abnormal, emergency, surveillance, etc.);
4.4.4 Vendor manuals;
4.4.5 Historical revisions of the Final Safety Analysis Report; and
4.4.6 Copy of electrical drawings, key diagrams and isometrics (paper copies).
If you have questions regarding the information requested, please contact the lead inspector.