September 26, 2019
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2NRC SECURITY
BASELINE INSPECTION REPORT 05000254/2019410; 05000265/2019410
Dear Mr. Hanson:
On August 14, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Quad Cities Nuclear Power Station, Units 1 and 2, and discussed the results of this inspection with Mr. Patrick Boyle, Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report.
One finding of very-low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Quad Cities Nuclear Power Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Quad Cities Nuclear Power Station.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA Karla Stoedter Acting for/
Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000254 and 05000265 License Nos. DPR-29 and DPR-30
Enclosure:
IR 05000254/2019410; 05000265/2019410
cc: D. Bush, Quad Cities Station
Security Manager
A. Khayyat, State Liaison Officer,
Illinois Emergency Management
Agency
A. Leek, State Liaison Officer,
State of Iowa
cc w/o encl: Distribution via LISTSERV
SUNSI Review
x Non-Sensitive Sensitive
x Publicly Available
Non-Publicly Available
OFFICE RIII RIII RIII
NAME GBonano:jw via Email NEgan via Email KStoedter for DBetancourt-Roldan
DATE 09/25/19 09/25/19 09/26/19