|
---|
Category:Inspection Plan
MONTHYEARML23339A1762023-12-0505 December 2023 Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000254/20220062023-03-0101 March 2023 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2022006 and 05000265/2022006) ML23013A1502023-01-17017 January 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2023002 ML23011A2822023-01-11011 January 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000254/2023401; 05000265/2023401 ML22249A2332022-09-0606 September 2022 Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report 05000254/2022011 05000265/2022011 IR 05000254/20220052022-08-22022 August 2022 Updated Inspection Plan for Quad Cities Nuclear Power Station (Report 05000254/2022005; 05000265/2022005) ML22228A1032022-08-16016 August 2022 Notification of NRC RFI for Post-Approval Site Inspection for License Renewal Phase IV Inspection Report 05000254/2022010 05000265/2022010 ML22178A1362022-06-28028 June 2022 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Quad Cities Station ML22039A1912022-02-0808 February 2022 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection IR 05000254/20210052021-09-0101 September 2021 Updated Inspection Plan for Quad Cities Nuclear Power Station (Report 05000254/2021005 and 05000265/2021005) ML21203A0662021-07-22022 July 2021 Quad Nuclear Power Station - Notification of NRC DBAI (Programs) and Initial Request for Information: Inspection Report 05000254/2021010; 05000265/2021010 IR 05000254/20200062021-03-0404 March 2021 Annual Assessment Letter for Quad Cities Nuclear Power Station Units 1 and 2 (Report 05000254/2020006 and 05000265/2020006) ML21033A5772021-02-0202 February 2021 Notification of Nrc Baseline Inspection and Request for Information; Inspection Report 05000254/2021001 ML20266G3542020-09-22022 September 2020 Notification of NRC Request for Information for Post-Approval Site Inspection for License Renewal-Phase IV; Inspection Report 05000254/2020012; 05000265/2020012 IR 05000254/20200052020-09-0101 September 2020 Updated Inspection Plan for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2020005 and 05000265/2020005) ML20183A2852020-07-0101 July 2020 Request for Information for an NRC Triennial Baseline Bases Assurance Inspection (Team): Inspection Report 05000254/2020011 and 05000265/2020011 ML20162A1302020-06-10010 June 2020 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Quad Cities Nuclear Power Station IR 05000254/20190062020-03-0303 March 2020 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2019006 and 05000265/2019006) IR 05000254/20190052019-08-28028 August 2019 Updated Inspection Plan for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2019005 and 05000265/2019005) IR 05000254/20180062019-03-0404 March 2019 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2018006 and 05000265/2018006) ML19014A0932019-01-11011 January 2019 Ltr. 01/11/19 Quad Cities Nuclear Power Station, Unit 1 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2019001; 05000265/2019001 (DRS-J.Neurauter) IR 05000254/20180052018-08-28028 August 2018 Updated Inspection Plan for Quad Cities Nuclear Power Station -Quad Nuclear Power Station, Units 1 and 2 (Report 05000254/2018005 and 05000265/2018005) IR 05000254/20170062018-03-0202 March 2018 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2017006; 05000265/2017006) IR 05000254/20170052017-08-28028 August 2017 Updated Inspection Plan (Inspection Report 05000254/2017005 and 05000265/2017005) IR 05000254/20160062017-03-0101 March 2017 Annual Assessment Letter for Quad Cities Nuclear Station, Units 1 and 2 (Report 05000254/2016006; 05000265/2016006) ML17033A0622017-02-0101 February 2017 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2017001; 05000265/2017001 IR 05000254/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Quad Cities Nuclear Power Station Units 1 and 2 (Report 05000254/2016005 and 05000265/2016005) ML16175A3552016-06-23023 June 2016 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Quad Cities Nuclear Power Station IR 05000254/20150062016-03-0202 March 2016 Annual Assessment Letter for Quad Cities Nuclear Power Stations, Units 1 and 2 (Inspection Report 05000254/2015006 and 05000265/2015006) IR 05000254/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2015005; 05000265/2015005) IR 05000254/20140012015-03-0404 March 2015 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2014001; 05000265/2014001) ML14245A3582014-09-0202 September 2014 Mid-Cycle Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 IR 05000254/20130012014-03-0404 March 2014 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2013001; 05000265/2013001) ML14049A4382014-02-14014 February 2014 Inspection Report Plan for 05000254-14-003 & 05000265-14-003 ML13246A2242013-09-0303 September 2013 2013 Quad Cities Nuclear Power Station Mid-Cycle Letter Combined IR 05000254/20120012013-03-0404 March 2013 Annual Assessment Letter for Quad Cities Nuclear Power Station, Unit 1 and 2 (Reports 05000254/2012001 and 05000265/2012001) ML13023A3582013-01-23023 January 2013 Ltr. 01/23/13 Quad Cities ISI, Unit 1, Request for Information ML12249A4102012-09-0404 September 2012 Mid-Cycle Assessment Letter for Quad Cities Nuclear Power Station, Unit 1 and 2 IR 05000254/20110062011-09-0101 September 2011 Mid-Cycle Letter for Quad Cities Nuclear Power Station, Units 1 and 2; 05000254/2011-006; 05000265/2011-006 IR 05000254/20110012011-03-0404 March 2011 Annual Assessment Letter for Quad Cities Nuclear Power Station (Report 05000254-11-001 and 05000265-11-001) ML1024400782010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Quad Cities Nuclear Power Station ML1006104912010-03-0303 March 2010 EOC Annual Assessment Letter, Inspection/Activity Plan ML0924403202009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan IR 05000254/20090012009-03-0404 March 2009 Annual Assessment Letter - Quad Cities Nuclear Power Station, Units 1 and 2 (05000254/2009001; 05000265/2009001) ML0824602952008-09-0202 September 2008 Quad Cities - Mid-Cycle Performance Review and Inspection Plan IR 05000254/20080012008-03-0303 March 2008 EOC Annual Assessment Letter (Inspection Report 05000254-08-001; 05000265-08-001) ML0735403302007-12-19019 December 2007 Quad - Inspection Plan 1/1/08 - 12/31/08 IR 05000254/20070012007-03-0202 March 2007 EOC Annual Assessment Letter (Report 05000254-07-001; 05000265-07-001) ML0624305962006-08-31031 August 2006 8/31/06 Quad Cities - Mid-Cycle Performance Review and Inspection Plan 2023-08-07
[Table view] Category:Letter
MONTHYEARIR 05000254/20230042024-02-0505 February 2024 Integrated Inspection Report 05000254/2023004 and 05000265/2023004 ML24004A0052024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval IR 05000254/20234032023-12-22022 December 2023 Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 IR 05000254/20230102023-12-20020 December 2023 Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23339A1762023-12-0505 December 2023 Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) ML23319A3342023-11-20020 November 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000254/20230032023-11-0909 November 2023 Integrated Inspection Report 05000254/2023003 and 05000265/2023003 RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23206A0382023-09-21021 September 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230112023-09-20020 September 2023 Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval SVP-23-038, Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities2023-08-14014 August 2023 Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities IR 05000254/20230022023-08-0808 August 2023 Integrated Inspection Report 05000254/2023002 and 05000265/2023002 ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI ML23216A0562023-08-0404 August 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 SVP-23-031, Regulatory Commitment Change Summary Report2023-07-14014 July 2023 Regulatory Commitment Change Summary Report ML23181A1062023-06-30030 June 2023 Postponement- Information Meeting (Open House) with a Question-And-Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23179A1932023-06-28028 June 2023 07122023 Letter-Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Plant for Performance for 2022 Calendar Year IR 05000254/20234012023-06-26026 June 2023 Cyber Security Inspection Report 05000254/2023401 and 05000265/2023401 IR 05000265/20230402023-06-22022 June 2023 Reissue Quad Cities Nuclear Power Station 95001 Supplemental Inspection Supplemental Report 05000265/2023040 and Follow Up Assessment Letter RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23167B1722023-06-16016 June 2023 95001 Supplemental Inspection Report 05000265/2023040 and Follow-Up Assessment Letter RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23144A3632023-05-26026 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23033A4042023-05-15015 May 2023 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application Letter IR 05000254/20234022023-05-15015 May 2023 Security Baseline and ISFSI Inspection Reports 05000254/2023402, 05000265/2023402, 07200053/2023401 ML23132A2022023-05-12012 May 2023 Annual Radiological Environmental Operating Report ML23125A0612023-05-0808 May 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230012023-05-0808 May 2023 Integrated Report 05000254/2023001 and 05000265/2023001 RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell SVP-23-018, Radioactive Effluent Release Report for 20222023-04-28028 April 2023 Radioactive Effluent Release Report for 2022 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23110A0622023-04-25025 April 2023 Transmittal of Final Quad Cities Nuclear Power Plant, Unit 1 Accident Sequence Precursor Report (Licensee Event Report 254-2022-001) ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration 2024-02-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (REPORT 05000254/2013006 AND 05000265/2013006)
Dear Mr. Pacilio:
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Quad Cities Nuclear Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Quad Cities Nuclear Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014, including temporary instruction (TI) 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks and inspection procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
M. Pacilio In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (630) 829-9703 with any questions you have regarding this letter.
Sincerely,
/RA/
Christine A. Lipa, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254, 50-265 License Nos. DPR-29, DPR-30
Enclosure:
Quad Cities Nuclear Power Station Inspection/ Activity Inspection Plan cc w/encl: Distribution via ListServTM
M. Pacilio In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (630) 829-9703 with any questions you have regarding this letter.
Sincerely,
/RA/
Christine A. Lipa, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254, 50-265 License Nos. DPR-29, DPR-30
Enclosure:
Quad Cities Nuclear Power Station Inspection/ Activity Inspection Plan cc w/encl: Distribution via ListServTM DISTRIBUTION:
See next page DOCUMENT NAME: Quad Cities EOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP E RIII-DRP RIII RIII NAME CLipa:rj/mvt DATE 09/ 03/13 OFFICIAL RECORD COPY
Letter to from M. Pacilio from Lipa dated September 3, 2013
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (REPORT 05000254/2013006 AND 05000265/2013006)
DISTRIBUTION:
Vivian Campbell RidsNrrDorlLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
Page 1 of 2 Quad Cities 08/28/2013 10:34:45 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TI 182 - TI 182 BURIED PIPE INSPECTION PHASE 2 1 1, 2 08/26/2013 09/30/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 09/16/2013 09/20/2013 IP 71124.05 Radiation Monitoring Instrumentation BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 2 1 10/21/2013 10/25/2013 IP 7111402 Alert and Notification System Testing 1 10/21/2013 10/25/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 10/21/2013 10/25/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 10/21/2013 10/25/2013 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1, 2 10/21/2013 10/25/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/21/2013 10/25/2013 IP 71124.04 Occupational Dose Assessment BI OLRQ - BIENNIAL REQUAL PROGRAM INSPECTION 2 1 10/21/2013 10/25/2013 IP 7111111B Licensed Operator Requalification Program STRIKE - STRIKE CONTINGENCY-OPS/RP/MAINT 3 1, 2 11/25/2013 12/30/2013 IP 92709 Licensee Strike Contingency Plans OL PREP - INITIAL EXAM - 04/2014 3 1 03/31/2014 04/04/2014 W90292 OL - INITIAL EXAM - 2014 MARCH/APRIL - QUAD ISI INSP - ISI BASELINE 1 1 04/07/2014 04/26/2014 IP 7111108G Inservice Inspection Activities - BWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1, 2 04/14/2014 04/18/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls OL EXAM - INIT EXAM FOR QUAD CITIES - APRIL 2014 3 1 04/21/2014 05/02/2014 W90292 OL - INITIAL EXAM - 2014 MARCH/APRIL - QUAD ISFSI - ISFSI INSPECTION AT OPERATING RX 1 1, 2 05/01/2014 05/30/2014 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI EPX - EP EXERCISE INSPECTION/PI VERIFICATION 2 1 08/25/2014 08/29/2014 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 06/09/2014 06/13/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 08/04/2014 08/08/2014 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Quad Cities 08/28/2013 10:34:45 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - BIENNIAL PI&R INSPECTION 1 1 09/08/2014 09/26/2014 IP 71152B Problem Identification and Resolution BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 10/20/2014 10/24/2014 IP 71124.07 Radiological Environmental Monitoring Program 1 10/20/2014 10/24/2014 IP 71151-BI01 Reactor Coolant System Activity 1 10/20/2014 10/24/2014 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/20/2014 10/24/2014 IP 71151-PR01 RETS/ODCM Radiological Effluent BI ENG - COMPONENT DESIGN BASIS INSPECTION 7 1, 2 11/03/2014 12/05/2014 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.