Triennial Fire Protection Inspection Report 05000254/2022011 and 05000265/2022011
ML23006A061
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 01/06/2023
From: Richard Skokowski
NRC/RGN-III/DORS/EB2
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2022011
Download: ML23006A061 (1)


Text

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000254/2022011 AND 05000265/2022011

Dear David Rhoades:

On December 15, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Quad Cities Nuclear Power Station and discussed the results of this inspection with Drew Griffiths, Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Richard A. Skokowski, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000254 and 05000265 License Nos. DPR-29 and DPR-30

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000254 and 05000265

License Numbers: DPR-29 and DPR-30

Report Numbers: 05000254/2022011 and 05000265/2022011

Enterprise Identifier: I-2022-011-0034

Licensee: Constellation Nuclear

Facility: Quad Cities Nuclear Power Station

Location: Cordova, IL

Inspection Dates: November 28, 2022 to December 15, 2022

Inspectors: I. Hafeez, Senior Reactor Inspector B. Jose, Senior Reactor Inspector A. Shaikh, Senior Reactor Inspector

Approved By: Richard A. Skokowski, Chief Engineering Branch 2 Division of Operating Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Quad Cities Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)===

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) A and B diesel fire pumps and fire water distribution system
(2) Unit 1 emergency diesel generator (EDG) carbon dioxide (CO2) suppression system
(3) Unit 2 MO-2-1301-16 reactor core isolation cooling (RCIC) inboard steam isolation valve

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Combustible control program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved fire protection program (FPP) do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the updated final safety analysis report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire safe shutdown (SSD) operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) Engineering Change (EC) 618590 Evaluation of Unrated Barrier Between TB-1 and U2 TB Trackway Extension Storage Facility
(2) EC 368863 Justification for Lack of Detection and Fixed Suppression in Fire Zone

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On December 15, 2022, the inspectors presented the triennial fire protection inspection results to Drew Griffiths, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.05 Calculations QDC-4100-M-Quad Cities Design Basis Hydraulic Calculations 01/08/2020

0537

QDC-4100-M-Combustible Loading Calculation for Crib House 8

0691

Corrective Action AR 00668567 Discrepancy in Fire Zone 8.2.10 09/06/2007

Documents AR 04165168 Light Corrosion Observed during Fire Protection 08/17/2018

Walkdown

AR 04374594 Housekeeping Issue 10/05/2020

AR 04474552 Observed Fire Protection Non-Compliances 01/28/2022

AR 04484533 Housekeeping Issue in the U-1 Condensate Pit 03/13/2022

AR 04536223 C-Factor Test Complete SAT with an Incomplete Portion 11/10/2022

AR01082089 Sprinkler Replacement-License Renewal Commitment 06/18/2010

Corrective Action AR 04539906 NRC FP ID: Procedure Clarification Needed 11/30/2022

Documents MA-QC-716-026-1001

Resulting from AR 04539934 NRC FP ID: Broken Robust Barriers 11/30/2022

Inspection AR 04541535 NRC FP ID: DFP Capacity Test Pump Curves and 12/08/2022

Procedure Update

AR 04543001 NRC FP ID-U1 EDG Day Tank Room Sprinkler Heads 12/15/2022

Drawings 4E-1063 Electrical Installation Turbine Building Plan EL 595-0 Rev. CS

Southeast

4E-1350B Schematic Diagram Diesel Generator No.1 Auxiliaries and Rev. AM

Start Relays

4E-1595 Schematic Diagram Fire Protection Part 2 CO2 System Rev. W

4E-1678D Wiring and Schematic Drawing Reactor Building Essential Rev. AF

480V MCC 19-1

4E-1841A Wiring Diagram CO2 Fire Protection Equipment and Rev. AC

Cabinet 2212-47

4E-2350B Schematic Diagram Diesel Gen. 2 Auxiliaries and Start Rev. AO

Relays

4E-2484E Schematic Diagram RCIC System W

4E-6706B Interconnection Block Fire Protection System Loops 6-3 Rev. W

and 6-4

Inspection Type Designation Description or Title Revision or

Procedure Date

4E-6731E Wiring Diagram Junction Box 1TB-21 and 2TB-218 Fire Rev. E

Protection System

M-813 Diagram of Diesel Generator Room Ventilation Rev. E

M-89 Diagram of Reactor Core Isolation Cooling (RCIC) Piping 01

Engineering 618590 Fire Protection Engineering Evaluation of Unrated Barrier 2

Changes Between TB-I and Unit 2 Turbine Building Trackway

Extension Storage Facility

EC 368863 GL 86-10 Evaluation Justification for Lack of Detection Rev. 0

and Fixed Suppression in Fire Zone 8.2.10

EC 390767 Multiple Spurious Operation Scenario 2-NEW-1 0

Evaluation for MO-2-1301-16

Miscellaneous QCAN901 Fenwal Detectors 12/01/2008

Procedures OP-AA-201-009 Control of Transient Combustible Material 28

QCTS 0850-05 Fire System "C" Factor Test 19

Work Orders 01348124-01 Sprinkler Replacement-License Renewal Commitment: 03/31/2018

MM EWP

01886437-01 Fire System "C" Factor Flow Test 08/18/2017

04893706-01 Fire System "C" Factor Flow Test 08/06/2020

04984556-01 Diesel Fire Pump "A" Capacity Test 05/04/2021

05005598-01 Diesel Fire Pump "B" Capacity Test 06/02/2021

05152931-01 (NEIL) Standby Diesel Generator Cardox Fire Protection Rev. 1

Functional Test

05178652 Perform Walkdown of Unit 1/2 Fire Protection System 01/28/2022

234564 Perform Walkdown of Unit 1/2 Fire Protection System 07/29/2022

6