Phase 4 Post-Approval License Renewal Inspection Report 05000254/2022010 and 05000265/2022010
ML22347A172
Person / Time
Site: Quad Cities  
Issue date: 12/13/2022
From: Adorno N
NRC/RGN-III/DORS/ERPB
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2022010
Download: ML22347A172 (1)


Text

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - PHASE 4 POST-APPROVAL LICENSE RENEWAL INSPECTION REPORT 05000254/2022010 AND 05000265/2022010

Dear Mr. Rhoades:

On November 18, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Quad Cities Nuclear Power Station and discussed the results of this inspection with Mr. Adnan Ali and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Néstor J. Féliz Adorno, Chief Engineering & Reactor Projects Branch Division of Operating Reactor Safety Docket Nos. 05000254 and 05000265 License Nos. DPR-29 and DPR-30

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000254 and 05000265

License Numbers:

DPR-29 and DPR-30

Report Numbers:

05000254/2022010 and 05000265/2022010

Enterprise Identifier:

I-2022-010-0053

Licensee:

Constellation Nuclear

Facility:

Quad Cities Nuclear Power Station

Location:

Cordova, IL

Inspection Dates:

November 14, 2022 to November 18, 2022

Inspectors:

J. Bozga, Senior Reactor Inspector

M. Domke, Reactor Inspector

K. Fay, Reactor Inspector

E. Fernandez, Senior Reactor Inspector

Approved By:

Néstor J. Féliz Adorno, Chief

Engineering & Reactor Projects Branch

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Phase 4 Post-Approval License Renewal Inspection at Quad Cities Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===71003 - Post-Approval Site Inspection for License Renewal The NRC conducted this Phase 4 Post-Approval Site Inspection for License Renewal in accordance with the License Renewal Inspection Program (LRIP). Per Inspection Manual Chapter 2516, the LRIP is the process used by NRC staff to verify the adequacy of Aging Management Programs (AMPs), Time Limited Aging Analyses (TLAAs), and other activities associated with an applicants request to renew an operating license of a commercial nuclear power plant beyond the initial licensing period under Title 10 of the Code of Federal Regulations (CFR), Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants.

The inspection evaluated the licensee implementation of aging management activities by performing detailed reviews of the aging management programs listed below. The team reviewed license renewal program assessments, commitments, engineering evaluations, procedures, program documents, completed tests, completed maintenance activities, nondestructive examination reports, technical reports, correspondence, and drawings. This inspection took place about 10 years after the licensee entered the period of extended operation (PEO) for both units. The PEO included the additional 20 years beyond the original 40-year licensed term. Unit 1 and Unit 2 will end the period of extended operation on December 12, 2032.

Post-Approval Site Inspection for License Renewal===

(1) B.1.9, BWR Vessel Internals
(2) B.1.10, Thermal Aging and Neutron Embrittlement of Cast Austenitic Stainless Steel
(3) B.1.11, Flow Accelerated Corrosion
(4) B.1.15, Inspection of Overhead Heavy Load and Light Load Handling Systems (refueling)
(5) B.1.31, Inspection of Water-Control Structures associated with Nuclear Power Plants
(6) B.1.32, Protective Coating Monitoring and Maintenance
(7) B.1.35, Environmental Qualification of Electrical Components
(8) B.1.33 - Electrical Cables and Connections not subject to 10 CFR 50.49 EQ requirements
(9) B.2.06, Heat Exchanger Test and Inspection

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 18, 2022, the inspectors presented the Phase 4 Post-Approval License Renewal Inspection results to Mr. Adnan Ali and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1340878

OPEX Review for OE35083 Related to P/T Curves

03/14/2012

1473829

Structures Monitoring 2A Circ Water Bay Inspection

2/11/2013

2442528

PM Will Go Past It's Scheduled Due Date

01/05/2015

2515796

1B and 1C Circ Bay Inspections Scheduled Past Late Date

06/17/2015

2648617

Q2R23 IVVI Uncompleted Scope

03/31/2016

4114398

OPEX - GEH Fluence Legacy Modeling Issue

03/13/2018

4147111

QDC IRIS review Cabling Pulling Issue

05/29/2020

28779

Q1R25 OLL.APS -Level 1 Coating Not Ordered As Required

03/12/2019

29050

Q1R25 FAC: 1D2 Feedwater HTR Shell Inspection Not in

Scope

03/13/2019

232650

PSU Q1R25: HPCI Lube Oil Cooler HX is Leaking Oil

03/25/2019

232744

Drywell Subpile Room Coatings Unsatisfactory

03/28/2019

239630

Finish FAC Pipe Replacement In Q2R25

04/15/2019

295184

Structures Monitoring: 1 C CW Pump Foundation Grout Loss

11/06/2019

295188

Structures Monitoring: Cracks in Crib House Basement Walls

11/06/2019

298963

FAC/EPC Inspection Scope Additions due to OPEX

11/21/2019

4356440

Q1R26 -DW EL 592' Recommended Coating Repairs

07/13/2020

4365467

Q2R26 - DW EL 579' Recommended Coating Repairs

08/26/2020

4406792

Quad Cities Review of Cable Aging Management Program

03/05/2021

Corrective Action

Documents

4451349

BWRVIP-135 Rev4 BWR Vessel and Internals ISP

10/07/2021

4537163

Non-EQ Cable Administrative Issues

11/15/2022

Corrective Action

Documents

Resulting from

Inspection

4537598

Administrative Issue with WO 01418897-01

11/17/2022

28241

Structures Monitoring 2019 & Q1 R25

2960

Structures Monitoring 2020

635707

Structures Monitoring 2021

637143

Structures Monitoring 2022

Engineering

Changes

SVP-16-044

Exam Scope Changes Required Based on Limitations

08/07/2016

71003

Engineering

Evaluations

003N7987

Dresden & Quad Cities Generating Stations Fuel Support

Piece Fluence Evaluation

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2017-030

BWRVIP Assessment of BWR Orificed Fuel Support Casting

Aging Management

2/23/2017

389855

Evaluate the Head Leak on 0-9400-102

398095

Technical Justification to Deviate from BWRVIP Inspection

Guidance for Unit 1 Jet Pump Riser Brace 5/6 & 7/8 RB-2

Welds

2055

Technical Justification to Deviate from BWRVIP Inspection

Guidance for Quad Cities Unit 1 and Unit 2 Core Shroud

Welds

404894

Evaluation of Q2R23 IVVI Inspection Findings

20251

Technical Justification for Elimination of CASS Aging

Management Inspection on Unit 1 and Unit 2

(none)

Quad Cities Generating Station Unit 2 Q2R26 Flow

Accelerated Corrosion Final Report

03/20/2022

Program Basis

Document

(B.1.31) Inspection of Water-Control Structures Associated

with Nuclear Power Plants

Program Basis

Document

(B.1.15) Inspection of Overhead Heavy Load and Light Load

(Related to Refueling) Handling Systems

Program Basis

Document

(B.1.11) Flow-Accelerated Corrosion

Program Basis

Document

(B.133) Electrical Cables and Connections Not Subject to

CFR 50.49 Environmental Qualifications Requirements

Miscellaneous

Program Basis

Document

(B. 1.35) Environmental Qualification (EQ) of Electric

Components

ER-AA-300-150

Cable Condition Monitoring Program

ER-AA-308-008

Exelon Safety-Related (Service Level I) Protective Coatings

ER-AA-330-014

Exelon Safety-Related (Service Level III) Coatings

ER-AA-430

Conduct of Flow Accelerated Corrosion Activities

ER-AA-450

Structures Monitoring

ER-AB-331-101

Evaluation for Thermal Aging/Neutron Embrittlement of BWR

Reactor Internal Components

ER-QC-330-1000

Primary Containment and Coatings Inspections

Procedures

QCEMS 0250-17

600 Volt and 5,000 Volt Butyl Rubber Cable Environmental

Qualification Surveillance

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

QCMPM 5800-01

Annual Crane Inspection And Preventive Maintenance

Inspection

0765230 02

MOV Instructions to Unwire/Rewire/Functional Test

05/21/2007

0765238 02

MOV Instructions to Unwire/Rewire/Functional Test

05/21/2007

0765240 02

MOV Instructions to Unwire/Rewire/Functional Test

05/21/2007

0765241 02

MOV Instructions to Unwire/Rewire/Functional Test

05/21/2007

1334414 01

MM Clean/Inspect HX CR HVAC TRN B RCU Condenser

01/21/2012

20731 01

Megger Cables 21403, 21404, and 21405 License Renewal

03/29/2012

4666136 01

MM (LR) Control Room HVAC Component Inspection

QCTS 0400-05

04/18/2019

4802805 01

Perform MA-AA-723-500 ATT. 3 On HTR Bay Cables

03/22/2021

4908126-01

Flow Accelerated Corrosion Inspections (Unit 1)

03/27/2021

4937651 01

ED-U1 Coating Inspection Drywell (LR)

03/21/2021

4952944 01

ED-Unit 1 Torus Coating Inspection -Underwater Phase

03/25/2021

29114-01

Flow Accelerated Corrosion Inspections (Unit 2)

04/05/2022

5044448 02

MS (LR) Unit 2 Torus Coating Repair -Underwater Phase

03/31/2022

5057280 01

ED-U2 Drywell Coatings Inspection (LR)

03/31/2022

5154119-02

(LR) Intake Soundings Inside and Outside of Forebay

11/22/2021

5180804 01

(LR) SBO Battery Room AHU Maintenance

2/15/2022

214739-01

(LR) Intake Soundings Inside and Outside of Forebay

06/08/2022

231968 01

(LR) SBO Battery Room AHU Maintenance

08/18/2022

281627-01

MM U-2 Turbine Building Overhead Crane Periodic

Inspection

09/22/2022

291268-01

MM EWP Monthly Reactor Building Overhead Crane

Inspection

10/10/2022

Work Orders

293037-01

MM U-1 Turbine Building Overhead Crane Periodic

Inspection

09/30/2022