SUBJECT:
QUAD CITIES NUCLEAR POWER STATION - PHASE 4 POST-APPROVAL LICENSE RENEWAL INSPECTION REPORT 05000254/2022010 AND 05000265/2022010
Dear Mr. Rhoades:
On November 18, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Quad Cities Nuclear Power Station and discussed the results of this inspection with Mr. Adnan Ali and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Néstor J. Féliz Adorno, Chief Engineering & Reactor Projects Branch Division of Operating Reactor Safety Docket Nos. 05000254 and 05000265 License Nos. DPR-29 and DPR-30
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000254 and 05000265
License Numbers:
Report Numbers:
05000254/2022010 and 05000265/2022010
Enterprise Identifier:
I-2022-010-0053
Licensee:
Constellation Nuclear
Facility:
Quad Cities Nuclear Power Station
Location:
Cordova, IL
Inspection Dates:
November 14, 2022 to November 18, 2022
Inspectors:
J. Bozga, Senior Reactor Inspector
M. Domke, Reactor Inspector
K. Fay, Reactor Inspector
E. Fernandez, Senior Reactor Inspector
Approved By:
Néstor J. Féliz Adorno, Chief
Engineering & Reactor Projects Branch
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Phase 4 Post-Approval License Renewal Inspection at Quad Cities Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
===71003 - Post-Approval Site Inspection for License Renewal The NRC conducted this Phase 4 Post-Approval Site Inspection for License Renewal in accordance with the License Renewal Inspection Program (LRIP). Per Inspection Manual Chapter 2516, the LRIP is the process used by NRC staff to verify the adequacy of Aging Management Programs (AMPs), Time Limited Aging Analyses (TLAAs), and other activities associated with an applicants request to renew an operating license of a commercial nuclear power plant beyond the initial licensing period under Title 10 of the Code of Federal Regulations (CFR), Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants.
The inspection evaluated the licensee implementation of aging management activities by performing detailed reviews of the aging management programs listed below. The team reviewed license renewal program assessments, commitments, engineering evaluations, procedures, program documents, completed tests, completed maintenance activities, nondestructive examination reports, technical reports, correspondence, and drawings. This inspection took place about 10 years after the licensee entered the period of extended operation (PEO) for both units. The PEO included the additional 20 years beyond the original 40-year licensed term. Unit 1 and Unit 2 will end the period of extended operation on December 12, 2032.
Post-Approval Site Inspection for License Renewal===
- (1) B.1.9, BWR Vessel Internals
- (2) B.1.10, Thermal Aging and Neutron Embrittlement of Cast Austenitic Stainless Steel
- (3) B.1.11, Flow Accelerated Corrosion
- (4) B.1.15, Inspection of Overhead Heavy Load and Light Load Handling Systems (refueling)
- (5) B.1.31, Inspection of Water-Control Structures associated with Nuclear Power Plants
- (6) B.1.32, Protective Coating Monitoring and Maintenance
- (7) B.1.35, Environmental Qualification of Electrical Components
- (8) B.1.33 - Electrical Cables and Connections not subject to 10 CFR 50.49 EQ requirements
- (9) B.2.06, Heat Exchanger Test and Inspection
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On November 18, 2022, the inspectors presented the Phase 4 Post-Approval License Renewal Inspection results to Mr. Adnan Ali and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1340878
OPEX Review for OE35083 Related to P/T Curves
03/14/2012
1473829
Structures Monitoring 2A Circ Water Bay Inspection
2/11/2013
2442528
PM Will Go Past It's Scheduled Due Date
01/05/2015
2515796
1B and 1C Circ Bay Inspections Scheduled Past Late Date
06/17/2015
2648617
Q2R23 IVVI Uncompleted Scope
03/31/2016
4114398
OPEX - GEH Fluence Legacy Modeling Issue
03/13/2018
4147111
QDC IRIS review Cabling Pulling Issue
05/29/2020
28779
Q1R25 OLL.APS -Level 1 Coating Not Ordered As Required
03/12/2019
29050
Q1R25 FAC: 1D2 Feedwater HTR Shell Inspection Not in
Scope
03/13/2019
232650
PSU Q1R25: HPCI Lube Oil Cooler HX is Leaking Oil
03/25/2019
232744
Drywell Subpile Room Coatings Unsatisfactory
03/28/2019
239630
Finish FAC Pipe Replacement In Q2R25
04/15/2019
295184
Structures Monitoring: 1 C CW Pump Foundation Grout Loss
11/06/2019
295188
Structures Monitoring: Cracks in Crib House Basement Walls
11/06/2019
298963
FAC/EPC Inspection Scope Additions due to OPEX
11/21/2019
4356440
Q1R26 -DW EL 592' Recommended Coating Repairs
07/13/2020
4365467
Q2R26 - DW EL 579' Recommended Coating Repairs
08/26/2020
4406792
Quad Cities Review of Cable Aging Management Program
03/05/2021
Corrective Action
Documents
4451349
BWRVIP-135 Rev4 BWR Vessel and Internals ISP
10/07/2021
4537163
Non-EQ Cable Administrative Issues
11/15/2022
Corrective Action
Documents
Resulting from
Inspection
4537598
Administrative Issue with WO 01418897-01
11/17/2022
28241
Structures Monitoring 2019 & Q1 R25
2960
Structures Monitoring 2020
635707
Structures Monitoring 2021
637143
Structures Monitoring 2022
Engineering
Changes
SVP-16-044
Exam Scope Changes Required Based on Limitations
08/07/2016
71003
Engineering
Evaluations
003N7987
Dresden & Quad Cities Generating Stations Fuel Support
Piece Fluence Evaluation
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2017-030
BWRVIP Assessment of BWR Orificed Fuel Support Casting
2/23/2017
389855
Evaluate the Head Leak on 0-9400-102
398095
Technical Justification to Deviate from BWRVIP Inspection
Guidance for Unit 1 Jet Pump Riser Brace 5/6 & 7/8 RB-2
2055
Technical Justification to Deviate from BWRVIP Inspection
Guidance for Quad Cities Unit 1 and Unit 2 Core Shroud
404894
Evaluation of Q2R23 IVVI Inspection Findings
20251
Technical Justification for Elimination of CASS Aging
Management Inspection on Unit 1 and Unit 2
(none)
Quad Cities Generating Station Unit 2 Q2R26 Flow
Accelerated Corrosion Final Report
03/20/2022
Program Basis
Document
(B.1.31) Inspection of Water-Control Structures Associated
with Nuclear Power Plants
Program Basis
Document
(B.1.15) Inspection of Overhead Heavy Load and Light Load
(Related to Refueling) Handling Systems
Program Basis
Document
(B.1.11) Flow-Accelerated Corrosion
Program Basis
Document
(B.133) Electrical Cables and Connections Not Subject to
CFR 50.49 Environmental Qualifications Requirements
Miscellaneous
Program Basis
Document
(B. 1.35) Environmental Qualification (EQ) of Electric
Components
Cable Condition Monitoring Program
Exelon Safety-Related (Service Level I) Protective Coatings
Exelon Safety-Related (Service Level III) Coatings
Conduct of Flow Accelerated Corrosion Activities
Structures Monitoring
Evaluation for Thermal Aging/Neutron Embrittlement of BWR
Reactor Internal Components
ER-QC-330-1000
Primary Containment and Coatings Inspections
Procedures
QCEMS 0250-17
600 Volt and 5,000 Volt Butyl Rubber Cable Environmental
Qualification Surveillance
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
QCMPM 5800-01
Annual Crane Inspection And Preventive Maintenance
Inspection
0765230 02
MOV Instructions to Unwire/Rewire/Functional Test
05/21/2007
0765238 02
MOV Instructions to Unwire/Rewire/Functional Test
05/21/2007
0765240 02
MOV Instructions to Unwire/Rewire/Functional Test
05/21/2007
0765241 02
MOV Instructions to Unwire/Rewire/Functional Test
05/21/2007
1334414 01
MM Clean/Inspect HX CR HVAC TRN B RCU Condenser
01/21/2012
20731 01
Megger Cables 21403, 21404, and 21405 License Renewal
03/29/2012
4666136 01
MM (LR) Control Room HVAC Component Inspection
QCTS 0400-05
04/18/2019
4802805 01
Perform MA-AA-723-500 ATT. 3 On HTR Bay Cables
03/22/2021
4908126-01
Flow Accelerated Corrosion Inspections (Unit 1)
03/27/2021
4937651 01
ED-U1 Coating Inspection Drywell (LR)
03/21/2021
4952944 01
ED-Unit 1 Torus Coating Inspection -Underwater Phase
03/25/2021
29114-01
Flow Accelerated Corrosion Inspections (Unit 2)
04/05/2022
5044448 02
MS (LR) Unit 2 Torus Coating Repair -Underwater Phase
03/31/2022
5057280 01
ED-U2 Drywell Coatings Inspection (LR)
03/31/2022
5154119-02
(LR) Intake Soundings Inside and Outside of Forebay
11/22/2021
5180804 01
(LR) SBO Battery Room AHU Maintenance
2/15/2022
214739-01
(LR) Intake Soundings Inside and Outside of Forebay
06/08/2022
231968 01
(LR) SBO Battery Room AHU Maintenance
08/18/2022
281627-01
MM U-2 Turbine Building Overhead Crane Periodic
Inspection
09/22/2022
291268-01
MM EWP Monthly Reactor Building Overhead Crane
Inspection
10/10/2022
Work Orders
293037-01
MM U-1 Turbine Building Overhead Crane Periodic
Inspection
09/30/2022