MONTHYEARIR 05000254/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Quad Cities Nuclear Power Station (Report 05000254/2024005; 05000265/2024005) ML24197A0482024-07-12012 July 2024 Information Request for the Quad Cities Nuclear Station Biennial Problem Identification and Resolution Inspection IR 05000254/20230062024-02-28028 February 2024 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2023006 and 05000265/2023006) ML24053A1192024-02-22022 February 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000265/2024010 and 05000254/2024010 ML23339A1762023-12-0505 December 2023 Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) IR 05000254/20230052023-08-25025 August 2023 Updated Inspection Plan and Assessment Follow-Up Letter for Quad Cities Nuclear Power Station (Report 05000254/2023005; 05000265/2023005) ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000254/20220062023-03-0101 March 2023 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2022006 and 05000265/2022006) ML23013A1502023-01-17017 January 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2023002 IR 05000254/20234012023-01-11011 January 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000254/2023401; 05000265/2023401 ML22249A2332022-09-0606 September 2022 Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report 05000254/2022011 05000265/2022011 IR 05000254/20220052022-08-22022 August 2022 Updated Inspection Plan for Quad Cities Nuclear Power Station (Report 05000254/2022005; 05000265/2022005) IR 05000254/20220102022-08-16016 August 2022 Notification of NRC RFI for Post-Approval Site Inspection for License Renewal Phase IV Inspection Report 05000254/2022010 05000265/2022010 ML22178A1362022-06-28028 June 2022 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Quad Cities Station ML22039A1912022-02-0808 February 2022 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection IR 05000254/20210052021-09-0101 September 2021 Updated Inspection Plan for Quad Cities Nuclear Power Station (Report 05000254/2021005 and 05000265/2021005) ML21203A0662021-07-22022 July 2021 Quad Nuclear Power Station - Notification of NRC DBAI (Programs) and Initial Request for Information: Inspection Report 05000254/2021010; 05000265/2021010 IR 05000254/20200062021-03-0404 March 2021 Annual Assessment Letter for Quad Cities Nuclear Power Station Units 1 and 2 (Report 05000254/2020006 and 05000265/2020006) ML21033A5772021-02-0202 February 2021 Notification of Nrc Baseline Inspection and Request for Information; Inspection Report 05000254/2021001 ML20266G3542020-09-22022 September 2020 Notification of NRC Request for Information for Post-Approval Site Inspection for License Renewal-Phase IV; Inspection Report 05000254/2020012; 05000265/2020012 IR 05000254/20200052020-09-0101 September 2020 Updated Inspection Plan for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2020005 and 05000265/2020005) ML20183A2852020-07-0101 July 2020 Request for Information for an NRC Triennial Baseline Bases Assurance Inspection (Team): Inspection Report 05000254/2020011 and 05000265/2020011 ML20162A1302020-06-10010 June 2020 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Quad Cities Nuclear Power Station IR 05000254/20190062020-03-0303 March 2020 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2019006 and 05000265/2019006) IR 05000254/20190052019-08-28028 August 2019 Updated Inspection Plan for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2019005 and 05000265/2019005) IR 05000254/20180062019-03-0404 March 2019 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2018006 and 05000265/2018006) ML19014A0932019-01-11011 January 2019 Ltr. 01/11/19 Quad Cities Nuclear Power Station, Unit 1 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2019001; 05000265/2019001 (DRS-J.Neurauter) IR 05000254/20180052018-08-28028 August 2018 Updated Inspection Plan for Quad Cities Nuclear Power Station -Quad Nuclear Power Station, Units 1 and 2 (Report 05000254/2018005 and 05000265/2018005) IR 05000254/20170062018-03-0202 March 2018 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2017006; 05000265/2017006) IR 05000254/20170052017-08-28028 August 2017 Updated Inspection Plan (Inspection Report 05000254/2017005 and 05000265/2017005) IR 05000254/20160062017-03-0101 March 2017 Annual Assessment Letter for Quad Cities Nuclear Station, Units 1 and 2 (Report 05000254/2016006; 05000265/2016006) ML17033A0622017-02-0101 February 2017 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2017001; 05000265/2017001 IR 05000254/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Quad Cities Nuclear Power Station Units 1 and 2 (Report 05000254/2016005 and 05000265/2016005) ML16175A3552016-06-23023 June 2016 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Quad Cities Nuclear Power Station IR 05000254/20150062016-03-0202 March 2016 Annual Assessment Letter for Quad Cities Nuclear Power Stations, Units 1 and 2 (Inspection Report 05000254/2015006 and 05000265/2015006) IR 05000254/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2015005; 05000265/2015005) IR 05000254/20140012015-03-0404 March 2015 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2014001; 05000265/2014001) ML14245A3582014-09-0202 September 2014 Mid-Cycle Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 IR 05000254/20130012014-03-0404 March 2014 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2013001; 05000265/2013001) ML14049A4382014-02-14014 February 2014 Inspection Report Plan for 05000254-14-003 & 05000265-14-003 ML13246A2242013-09-0303 September 2013 2013 Quad Cities Nuclear Power Station Mid-Cycle Letter Combined IR 05000254/20120012013-03-0404 March 2013 Annual Assessment Letter for Quad Cities Nuclear Power Station, Unit 1 and 2 (Reports 05000254/2012001 and 05000265/2012001) ML13023A3582013-01-23023 January 2013 Ltr. 01/23/13 Quad Cities ISI, Unit 1, Request for Information ML12249A4102012-09-0404 September 2012 Mid-Cycle Assessment Letter for Quad Cities Nuclear Power Station, Unit 1 and 2 IR 05000254/20110062011-09-0101 September 2011 Mid-Cycle Letter for Quad Cities Nuclear Power Station, Units 1 and 2; 05000254/2011-006; 05000265/2011-006 IR 05000254/20110012011-03-0404 March 2011 Annual Assessment Letter for Quad Cities Nuclear Power Station (Report 05000254-11-001 and 05000265-11-001) ML1024400782010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Quad Cities Nuclear Power Station ML1006104912010-03-0303 March 2010 EOC Annual Assessment Letter, Inspection/Activity Plan ML0924403202009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan IR 05000254/20090012009-03-0404 March 2009 Annual Assessment Letter - Quad Cities Nuclear Power Station, Units 1 and 2 (05000254/2009001; 05000265/2009001) 2024-08-28
[Table view] Category:Letter
MONTHYEARIR 05000254/20240112024-11-13013 November 2024 Biennial Problem Identification and Resolution Inspection Report 05000254/2024011 and 05000265/2024011 IR 05000254/20240032024-11-12012 November 2024 Integrated Inspection Report 05000254/2024003, 05000265/2024003 and 07200053/2024001 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-101, License Amendment Request for One-Time Extension of Standby Gas Treatment System Technical Specifications Completion Time to Support Piping Repair2024-11-0404 November 2024 License Amendment Request for One-Time Extension of Standby Gas Treatment System Technical Specifications Completion Time to Support Piping Repair RS-24-126, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4)2024-10-31031 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4) 05000265/LER-2024-002-01, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-10-30030 October 2024 Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure SVP-24-065, Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor2024-10-29029 October 2024 Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor IR 05000254/20240102024-10-28028 October 2024 Age Related Degradation Inspection Report 05000254/2024010 and 05000265/2024010 and Notice of Violation RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-059, Correction to Registration of Use of Casks to Store Spent Fuel2024-10-0404 October 2024 Correction to Registration of Use of Casks to Store Spent Fuel ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24247A1642024-09-30030 September 2024 Alternative Request RP-01 IR 05000254/20244022024-09-12012 September 2024 Material Control and Accounting Program Inspection Report 05000254/2024402 and 05000265/2024402 (Public) SVP-24-054, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds2024-09-11011 September 2024 Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000254/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Quad Cities Nuclear Power Station (Report 05000254/2024005; 05000265/2024005) RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval ML24183A1082024-08-0808 August 2024 – Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b SVP-24-049, Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities2024-08-0707 August 2024 Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 SVP-24-048, Registration of Use of Casks to Store Spent Fuel2024-07-31031 July 2024 Registration of Use of Casks to Store Spent Fuel 05000265/LER-2024-002, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-07-22022 July 2024 Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions SVP-24-041, Regulatory Commitment Change Summary Report2024-07-0505 July 2024 Regulatory Commitment Change Summary Report SVP-24-043, Registration of Use of Casks to Store Spent Fuel2024-07-0505 July 2024 Registration of Use of Casks to Store Spent Fuel ML24162A0982024-07-0303 July 2024 – Issuance of Amendment Nos. 301 and 297 Adoption of 10 CFR 50.69 Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors SVP-24-040, Registration of Use of Casks to Store Spent Fuel2024-06-25025 June 2024 Registration of Use of Casks to Store Spent Fuel RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed ML24110A0492024-05-28028 May 2024 Audit Report Related to the TSTF-505 and 10 CFR 50.59 Amendments ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000254/20240012024-05-14014 May 2024 Integrated Inspection Report Nos. 05000254/2024001 and 05000265/2024001 RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion 05000265/LER-2024-001, Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing2024-05-10010 May 2024 Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing SVP-24-034, Annual Radiological Environmental Operating Report2024-05-10010 May 2024 Annual Radiological Environmental Operating Report RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report ML24109A0662024-05-0202 May 2024 – Relief Request I5R-26, Revision 0 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-028, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-04-26026 April 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVP-24-029, Radioactive Effluent Release Report for 20232024-04-26026 April 2024 Radioactive Effluent Release Report for 2023 ML24114A1712024-04-23023 April 2024 State of Illinois (IEMA-OHS) Comment Quad Cities HI-STORM Exemption Environmental Assessment SVP-24-024, Corrected Radioactive Effluent Release Report for 20222024-04-0505 April 2024 Corrected Radioactive Effluent Release Report for 2022 IR 05000254/20245012024-04-0505 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000254/2024501 and 05000265/2024501 RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report 2024-09-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 23, 2016 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT THE QUAD CITIES NUCLEAR POWER STATION
Dear Mr. Hanson:
This letter is to request information to support our scheduled Problem Identification and Resolution (PI&R) inspection beginning September 12, 2016, at your Quad Cities Nuclear Power Station. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) baseline Inspection Procedure 71152.
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
The documents requested are copies of condition reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The information requested prior to the inspection may be provided in either CD-ROM/DVD (preferred) or hard copy format and should be ready for NRC review by August 26, 2016. Mr. Raymond Ng, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please contact Mr. Ng at 630-829-9574 or raymond.ng@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
B. Hanson The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30
Enclosure:
RFI to Support PI&R Inspection cc: Distribution via LISTSERV
B. Hanson The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30
Enclosure:
RFI to Support PI&R Inspection cc: Distribution via LISTSERV DISTRIBUTION:
Jeremy Bowen Allan Barker RidsNrrDorlLpl3-2 Resource Carole Ariano RidsNrrPMQuadCities Resource Linda Linn RidsNrrDirsIrib Resource DRPIII Cynthia Pederson DRSIII Darrell Roberts ROPassessment.Resource@nrc.gov Richard Skokowski ADAMS Accession Number: ML16175A355 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII NAME RNg:rj KStoedter DATE 06/23/16 06/23/16 OFFICIAL RECORD COPY
Requested Information to Support Problem Identification and Resolution Inspection Please provide the information on a compact disc or thumb drive (one for each of four team members), if possible. Unless otherwise specified, the time frame for requested information is for the period of July 1, 2014, through the time the data request is answered. Please label any electronic files with file content information. In the case of list of condition reports requested, the list should be sortable electronically.
In addition, inspectors will require computer access to the corrective action program (CAP) database while on site.
PROGRAM DOCUMENTS
- 1. Copies of current administrative procedures associated with the corrective action program. This should include procedures related to: (1) corrective action process; (2) operating experience program; (3) self-assessment program; (4) maintenance rule program; (5) operability determination process; (6) degraded/non-conforming condition process (e.g., RIS 2005-20); (7) system health process or equivalent equipment reliability improvement programs; and (8) operational decision making (ODMI) process.
- 2. A current copy of the Employee Concerns Program/Ombudsman administrative procedure.
- 3. Description of any substantive changes made to the CAP since the last Problem Identification and Resolution (PI&R) Inspection (September 2014). Please include the effective date with each listed change.
ASSESSMENTS
- 4. A copy of Quality Assurance (QA) audits of the corrective action program.
- 5. A copy of self-assessments and associated condition reports generated in preparation for this PI&R inspection.
- 6. A list of all other QA audits completed with a brief description of findings identified.
- 7. The schedule of future QA audits.
- 8. A copy of completed CAP self-assessments and the plan/schedule for future CAP self-assessments.
- 9. A chronological list of department and site self-assessments completed (include date completed).
- 10. A list of condition reports (CRs) written for findings or concerns identified in self-assessments and audits. Include a short description/title of the finding, its status, and include a cross-reference to the audit or self-assessment number.
2
CORRECTIVE ACTION DOCUMENTS
- 11. A list of completed root cause evaluations with a brief description of the issue. Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the root cause package, to the documents and/or CRs directing and tracking the actions.
- 12. A list of completed apparent cause evaluations with a brief description of the issue.
Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the apparent cause package, to the documents and/or CRs directing and tracking the actions.
- 13. A list of completed common cause evaluations with a brief description of the issue.
Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the common cause package, to the documents and/or CRs directing and tracking the actions.
- 14. A list of all open condition reports sorted by significance level. Include CR number, the date initiated, a brief description/title, system affected if any, anticipated completion date, if available, and whether there is an associated operability evaluation. This list should be sortable by responsible department and listed in order of initiation date (oldest listed first).
- 15. A list of closed CRs sorted by significance level and then initiation date. Include CR number, a brief description/title, date closed, assigned organization, system affected and whether there was an associated operability evaluation. This list should be sortable by responsible department and listed in order of initiation date (oldest listed first).
- 16. A list of open corrective actions, sorted by significance/priority level, with a brief description/title, initiating date and due date. The list should include the number of due date extension and be sortable by the responsible department.
- 17. A list of CRs generated by the corporate office that involve or affect plant operation, sorted by significance level. Include the date initiated, a brief description/title, site(s) affected, system affected, assigned organization, and status (if closed include date closed; if open, include scheduled date to be closed).
- 18. A list of completed effectiveness reviews with a brief description of the results. Include a cross-reference to the CRs for which the effectiveness review was conducted and, if applicable, CR numbers documenting any additional follow-up actions.
- 19. A list of CRs initiated for inadequate or ineffective corrective actions. Include the date initiated, a brief description/title, significance/priority level, system affected, assigned organization, and status (if closed include date closed; if open, include scheduled date to be closed). Include a cross-reference to the CR or evaluation that generated the original corrective action.
- 20. A copy of any performance reports or indicators used to track CAP effectiveness for the past 24 months. The most recent data and end-of-quarter data will suffice; monthly reports are not required.
3
- 21. A data table (or similar format) showing the total number of CRs generated per year since 2011 sortable by department (i.e. operations, engineering, security etc.).
- 22. A data table showing the number of issues identified externally (NRC, INPO, other etc.)
per year as compared to internally since 2011.
TRENDS
- 23. A list of CRs initiated for trends of conditions adverse to quality. Include the date initiated, a brief description/title, significance/priority level, and status (if closed include date closed; if open, include scheduled date to be closed).
- 24. Copies of any completed trend reports for CRs. Quarterly trend reports are acceptable; copies of all monthly reports are not required.
- 25. Copies of all apparent, common and/or root cause evaluations regarding adverse human performance trends.
OPERATING EXPERIENCE
- 26. A copy of the most recent operating experience program effectiveness review.
- 27. A list of CRs initiated to evaluate industry and NRC operating experience, and NRC generic communications (e.g. bulletins, information notices, generic letters, etc.).
Include date the CR was initiated, a brief description/title, and the status (if closed include date closed; if open, include scheduled date to be closed).
SYSTEMS AND COMPONENTS
- 28. A list of the top ten risk significant systems and top ten risk significant components.
- 29. A list of operability determinations/evaluations. Include a brief description/title, date initiated, date closed or date scheduled to be closed. Also include any open operability evaluations that were initiated prior to July 1, 2014.
- 30. Cause analysis, corrective actions documents, health reports, and trend analysis for systems and components considered Maintenance Rule (a)(1). Provide this information starting one year earlier from when the system or component entered (a)(1) status.
Include dates when system/components entered (a)(1) status and, if applicable, returned to (a)(2) status. For recurring reports, quarterly reports are sufficient; monthly reports are not required.
- 31. A list of temporary modifications that were installed since July 1, 2014, with a brief description/title, installation date, and status. Include any in-place temporary modifications that were installed prior to July 1, 2014.
4
SCWE
- 32. Results of completed safety culture/safety conscious work environment surveys or self-assessments. Include reference to associated CRs and status of the CRs actions.
Also include schedule/plans for future surveys.
REGULATORY ISSUES
- 33. A list of CRs for issues (findings, violations, etc.) documented in NRC inspection reports.
Include the CR number, brief description/title, date initiated and the status (if closed include date closed; if open, include scheduled date to be closed).
- 34. A list of CRs for licensee identified violations that have been documented in NRC inspection reports. Include the CR number, brief description/title, date initiated and the status (if closed include date closed; if open, include scheduled date to be closed).
- 35. A list of CRs associated with NRC identified issues. Include the CR number, brief description/title, date initiated and the status (if closed include date closed; if open, include scheduled date to be closed).
- 36. A list of degraded/non-conforming conditions. Include the CR number, brief description/title, date initiated and date closed or projected closeout date. Include open issues that were identified prior to July 1, 2014.
- 37. A list of current control room deficiencies and operator work-arounds, sorted by priority, with a brief description/title and corresponding CR and/or work order number.
5-YEAR REVIEW
- 38. A list of CRs regarding safety related relay failures that have been generated since July 1, 2011. Include the CR number, brief description/title, level of evaluation (i.e. root cause, apparent cause, common cause etc.), date initiated, and the status (if closed include date closed; if open, include scheduled date to be closed).
- 39. A list of CRs regarding aging-related degradations or failures that have been generated since July 1, 2011. Include the CR number, brief description/title, level of evaluation (i.e. root cause, apparent cause, common cause, etc.), date initiated, and the status (if closed include date closed; if open, include scheduled date to be closed).
ADMIN
- 40. A copy of the latest plant organizational chart and phone listing.
- 41. Scheduled dates, times, and location for all meetings associated with implementing the CAP (e.g. CR screening meetings, corrective action review board meetings). Include work order screening/assessment meetings.
5
Documents requested to be available on-site during the inspection:
- a. Updated Final Safety Analysis Report.
- b. Technical Specifications and Bases
- c. Procedures and procedure index.
- d. A copy of the QA manual.
- e. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.
- f. A list of the codes used in the CAP with their descriptions.
- g. A copy of the latest independent/offsite organization review of safety culture/safety conscious work environment and internal equivalent assessments if not provided as part of the requested data package.
6