September 1, 2020

SUBJECT:

UPDATED INSPECTION PLAN FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (REPORT 05000254/2020005 AND 05000265/2020005)

Dear Mr. Hanson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for Quad Cities Nuclear Power Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP), including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020 memo, Inspection Guidance During Transition From COVID-19 Mandatory Telework (ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these baseline inspections are being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9628 with any questions you have regarding this letter.

Sincerely,

/RA/

Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects

Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30

Enclosure(s):

Inspection Plan

cc: Distribution via LISTSERV Letter to Bryan from Kenneth Riemer dated September 1, 2020.

SUBJECT:

UPDATED INSPECTION PLAN FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (REPORT 05000254/2020005 AND 05000265/2020005)

DISTRIBUTION:

Jessie Quichocho Elise Burket RidsNrrDorlLpl3 RidsNrrPMQuadCities Resource RidsNrrDroIrib Resource John Giessner Kenneth OBrien Jamnes Cameron Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov

ADAMS Accession Number: ML20244A295 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII

RIII

NAME CPhillips:wc via email KRiemer via email

DATE 8/20/2020 8/24/2020

OFFICIAL RECORD COPY

07200053 - Quad Cities (ISFSI)

07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count ISFSI Security Inspection

1 04/14/2021 04/16/2021 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations 9/2/2020 8:16:31 AM Page 1 of 5 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Quad Cities 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count ISFSI Cask Loading Inspection 3Q2020

1, 2 07/20/2020 07/24/2020 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1, 2 09/08/2020 09/11/2020 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants Emergency Preparedness Exercise Inspection / Performance Indicator Verification

1, 2 08/10/2020 08/18/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 08/10/2020 08/14/2020 IP 71151 001397 Performance Indicator Verification 3rd Quarter Integrated Inspection

1, 2 08/16/2020 09/30/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Design Bases Assurance Inspection (Team)

1, 2 08/31/2020 09/04/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1, 2 09/07/2020 09/11/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1, 2 09/14/2020 09/18/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

Security Baseline Inspection

1, 2 10/01/2020 12/31/2020 IP 71130.09 001656 Security Plan Changes 1, 2 11/09/2020 11/13/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 11/09/2020 11/13/2020 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 11/09/2020 11/13/2020 IP 71151 001338 Performance Indicator Verification Radiation Protection Baseline Inspection

1, 2 10/05/2020 11/06/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation Biennial Problem Identification and Resolution Inspection

1, 2 10/05/2020 10/23/2020 IP 71152B 000747 Problem Identification and Resolution 9/2/2020 8:16:31 AM Page 2 of 5 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Quad Cities 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count License Renewal Phase 4

1, 2 11/16/2020 11/20/2020 IP 71003 000687 Post-Approval Site Inspection for License Renewal Corporate Security Baseline Inspection

1, 2 01/12/2021 01/14/2021 IP 71130.01 000733 Access Authorization Security Baseline Inspection

1, 2 02/15/2021 02/19/2021 IP 71130.01 000733 Access Authorization 1, 2 02/15/2021 02/19/2021 IP 71130.02 000734 Access Control 1, 2 02/15/2021 02/19/2021 IP 71151 001338 Performance Indicator Verification Inservice Inspection Quad Cities Unit 1

1 03/08/2021 04/05/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Radiation Protection Baseline Inspection

1, 2 03/15/2021 03/19/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/15/2021 03/19/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/15/2021 03/19/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Quad Cities June 2021 Initial License Exam

1 05/09/2021 05/15/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 05/30/2021 06/05/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

1, 2 06/06/2021 06/12/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Radiation Protection Baseline Inspection

1, 2 06/07/2021 06/11/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program 9/2/2020 8:16:31 AM Page 3 of 5 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Quad Cities 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Force-On-Force Planning and Exercise Weeks -QC

1, 2 06/21/2021 06/25/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 07/12/2021 07/16/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Radiation Protection Baseline Inspection

1, 2 08/16/2021 08/20/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Emergency Preparedness Baseline Inspection / Performance Indicator Verification

1, 2 09/13/2021 09/17/2021 IP 71114.02 000717 Alert and Notification System Testing 1, 2 09/13/2021 09/17/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 09/13/2021 09/17/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 09/13/2021 09/17/2021 IP 71151 001397 Performance Indicator Verification Security Baseline Inspection

1, 2 10/01/2021 12/31/2021 IP 71130.09 001656 Security Plan Changes Security Baseline Inspection

1, 2 10/18/2021 10/22/2021 IP 71130.07 000739 Security Training Radiation Protection Baseline Inspection

1, 2 10/25/2021 10/29/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation Design Basis Assurance Inspection (Programs)

1, 2 11/01/2021 11/19/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Quad Cities 2021 Biennial Licensed Operator Requalification Program Inspection

1, 2 11/07/2021 11/20/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance 9/2/2020 8:16:31 AM Page 4 of 5 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Quad Cities 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Triennial Heat Sink Inspection

1, 2 12/06/2021 12/10/2021 IP 71111.07T 000700 Heat Sink Performance Triennial Fire Protection Inspection

1, 2 01/11/2022 01/11/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Inservice Inspection Quad Cities Unit 2

2 03/21/2022 04/01/2022 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP Baseline Inspection

1 03/28/2022 04/01/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

03/28/2022 04/01/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls

03/28/2022 04/01/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Evaluations of Changes, Test, and Experiments Inspection

1, 2 05/23/2022 05/27/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments RP Baseline Inspection

1 06/06/2022 06/10/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 9/2/2020 8:16:31 AM Page 5 of 5 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report