August 16, 2022
Mr. David P. Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: QUAD CITIES NUCLEAR GENERATINGNOTIFICATION OF NRC REQUEST
FOR INFORMATION FOR POST-APPROVAL SITE INSPECTION FOR LICENSE
RENEWALPHASE IV; INSPECTION REPORT 05000254/2022010;
Dear Mr. Rhoades:
On November 14, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin an
inspection in accordance with Inspection Procedure 71003 (Phase IV). This onsite inspection is
scheduled to be performed November 14, 2022 through November 18, 2022.
The purpose of the inspection is to review the implementation of the Aging Management
Program (AMP) elements during the Period of Extended Operation. The inspection team will
select for review a sample of the sites AMPs.
This Request for Information is separated into three Sections (A, B and C). Section A
information will be used to facilitate the AMP sample selections. The team leader will make
AMP selections and inform the licensee. Based on these selections, the licensee will provide
the additional information requested under Section B. This information will be used as part of
the inspection preparation and implementation. Requests under Section C should be available
to the inspectors during the on-site week of inspection. See the table below for specific dates:
Requested Action: Date:
Section A Information October 3, 2022
Section B Information October 17, 2022
Section C Information November 14, 2022
Experience has shown that this inspection is resource intensive both for the NRC inspector and
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive
inspection for both sides, we have enclosed a request for documents needed for this inspection.
It is important that all of these documents are up-to-date, and complete, in order to minimize the
number of additional documents requested during the preparation and/or the onsite portion of
the inspection.
D. Rhoades -2-
We understand that our regulatory contact for this inspection will be Mr. R. Swart of your
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector Matthew Domke at 630-829-9562.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
Signed by Domke, Matthew
on 08/16/22
Matthew Domke, Reactor Inspector
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-254, 50-265
Enclosure:
Document Request for License Renewal
Phase IV Inspection
cc: Distribution via LISTSERV
D. Rhoades -3-
Letter to David P. Rhoades from Matthew Domke dated August 16, 2022.
SUBJECT: QUAD CITIES NUCLEAR GENERATINGNOTIFICATION OF NRC REQUEST
FOR INFORMATION FOR POST-APPROVAL SITE INSPECTION FOR LICENSE
RENEWALPHASE IV; INSPECTION REPORT 05000254/2022010;
DISTRIBUTION:
Lou McKown
RidsNrrDorlLpl3
RidsNrrPMQuadCities Resource
RidsNrrDroIrib Resource
DRPIII
DRSIII
ADAMS Accession Number: ML22228A103
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
OFFICE RIII
NAME MDomke:mb
DATE 08/16/2022
OFFICIAL RECORD COPY
QUAD CITIES NUCLEAR GENERATING STATION-REQUEST FOR INFORMATION
FOR THE UPCOMING POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
(PHASE IV)
Inspection Procedure: IP 71003, Post-Approval Site Inspection for License Renewal
(Phase IV)
Inspection Dates: November 14-18, 2022 (on-site)
Inspection Report: 05000254/2022010 and 05000265/2022010
Lead Inspector: Matthew Domke, Reactor Inspector
On November 14, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-
Approval Site Inspection for License Renewal (Phase IV) at Quad Cities Nuclear Generating
Station. The purpose of the inspection is to review the implementation of the aging
management program elements during the Period of Extended Operation (PEO). The
inspection team will select for review a sample of the sites Aging Management Programs
(AMPs).
This Request for Information (RFI) is separated into three Sections, A, B, and C. Inspectors will
refine selections from Section A so that the licensee can provide additional information
requested under Section B. This information will be used as part of the inspection preparation
and implementation. Requests under Section C should be available to the inspectors during the
on-site inspection week.
Requested Action: Date:
Section A Information October 3, 2022
Section B Information October 17, 2022
Section C Information November 14, 2022
A. Information Requested to Facilitate AMP Sample Selection
(1) Provide a list of all site AMPs.
(2) Provide copies of corporate and/or site-specific program document/procedure related
to overall aging management program.
(3) Provide list of AMPs that were new or enhanced in the License Renewal Application
(LRA).
(4) Provide list of AMPs that had commitment changes since entering the PEO.
(5) Provide list of AMPs that have incorporated newly identified structures, systems, and
components (SSCs) since entering the PEO. List or describe which SSCs were
incorporated.
(6) Provide list of AMPs that have incorporated components from One-Time Inspection
activities since entering the PEO.
Enclosure
(7) Provide any self-assessments and/or audits related to license renewal program
implementation and/or AMP effectiveness.
(8) Provide a list of corrective action documents that were initiated as result of license
renewal activities, self-assessments, and/or audits (since entering the PEO).
(9) Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,
Technical Specifications Bases, Technical Requirements Manual, and Individual Plant
Examination of External Events (IPEEE).
(10) Site-specific responses and/or evaluations for NRC generic communications
associated with license renewal that were issued after entering the PEO.
(11) Risk-ranking of top 250 basic events from your internal and external events
site-specific probabilistic safety analysis (PSA) sorted by Birnbaum Importance,
Risk-Reduction Worth, Risk-Achievement Worth, and Fussell-Vesely (Provide in Excel
format). Please include basic event names/description.
(12) Provide a list of the top 10 risk important systems for the internal events model and
external events model.
B. Information Requested for Each AMP Selected for Review (As Applicable)
(1) Program basis documents and administrative procedures describing key program
attributes such as program objectives, scope, detection and monitoring methods,
administrative controls, acceptance criteria, corrective actions, and scope expansion
requirements.
(2) Provide a summary document listing which implementing procedures are included in
the selected AMP and what are their required performance frequency.
(3) Copies of implementing procedures for program activities (e.g., visual examination
procedures, ultrasonic examination procedures, maintenance procedures, system
walkdowns, etc.)
(4) Completed Work Orders (WOs) for the most recent aging management activities
performed, including associated inspection and testing reports, as applicable. This
request is limited to the last two completed activities (per procedure). If this request
becomes too onerous based on the number of WO reach out to the lead inspector for
additional scope clarification.
(5) Copies of aging related corrective actions documents associated with the selected
AMP, and SSCs under its purview (for the last three years). A search of corrective
actions documents should include keywords such as: aging, age management,
degradation, wear, delamination, peeling, crazing, chipping, leak, crack,
corrosion, rust, leaching, embrittlement, fatigue, blister, spalling, oxidation,
loss of function, failed acceptance criteria, flow-accelerated, or other site-specific
terms/codes used in aging monitoring as appropriate.
(6) Updated license renewal scoping drawings showing the SSCs within the scope of the
AMP.
2
(7) Any gap analyses performed to assess the differences between the current AMP and
the recommendations in the latest revision of NUREG-1801, Generic Aging Lessons
Learned (GALL), and subsequent Interim Staff Guidance.
(8) Copy of evaluations performed for applicable external and internal operating
experience (OE) issues associated with license renewal. This request is limited to OE
items issued after entering the PEO.
(9) Description of instances where examination scope expansion was required based on
the examination of an SSC in accordance with the AMP. Please describe the logic to
select the scope expansion, and any resulting changes to the AMP. (This request is
limited to work performed in the PEO.)
(10) Description of instances where AMP examinations/inspections were eliminated or
deferred. (This request is limited to work performed in the PEO.)
(11) Description of instances where examination/inspection scope changes were required
based on limitations encountered during the examination. (This request is limited to
work performed in the PEO.)
C. Information Requested to be Available During the Onsite Week of Inspection
(1) Provide a brief presentation (informal) to the inspection team regarding aging
management at the site. Topics to be covered:
a. How are aging related issue identified, documented and evaluated within the
corrective action program and/or other aging tracking software/program.
b. Describe which individuals and/or organizations are responsible for identifying
and evaluating aging related issues.
c. Describe the responsibilities regarding age management, if any, of the following:
i. System/Strategic Engineers
ii. AMP Owners
iii. Corporate office
(2) Copy of simplified system drawings (a.k.a. Horse Notes or Training Notes).
(3) A computer with network access to the sites corrective action program.
3