IR 05000254/2022401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000254/2022401 and 05000265/2022401
ML22325A350
Person / Time
Site: Quad Cities  
Issue date: 11/22/2022
From: Steven Orth
NRC/RGN-III/DRSS/SEPIR
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2022401
Download: ML22325A350 (1)


Text

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000254/2022401 AND 05000265/2022401

Dear Mr. David Rhoades:

On October 19, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Quad Cities Nuclear Power Station and discussed the results of this inspection with Mr. Dave Carrick, Operations Director and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000254 and 05000265 License Nos. DPR-29 and DPR-30

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000254 and 05000265

License Numbers:

DPR-29 and DPR-30

Report Numbers:

05000254/2022401 and 05000265/2022401

Enterprise Identifier:

I-2022-401-0035

Licensee:

Constellation Nuclear

Facility:

Quad Cities Nuclear Power Station

Location:

Cordova, IL

Inspection Dates:

July 18, 2022 to October 19, 2022

Inspectors:

E. Bonano, Physical Security Inspector

J. Kutlesa, Emergency Preparedness Inspector

Approved By:

Steven K. Orth, Chief

Security, Emergency Preparedness,

and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Quad Cities Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: 02.06 (a - d); 02.07 (a); 02.08 (a, b, e)

Tier III: 02.09

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program.

The following elements were evaluated from this IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All Requirements

Tier II: 02.09 (a, b); 02.10 (a); 02.11

(a) Tier III: 02.15 (a, c)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1) Tier I: All Requirements

Tier II: 02.05 (a); 02.06 (a-l, n); 02.07 (a, b, c, e)

Tier III: 02.08; 02.09 (a, b); 02.10 (a)

(2) Observed annual Force-on-Force exercise on Aug 9, 2022.

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan (PSP) change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP and PSP revision 17 remains current.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) March 2021 through September

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 19, 2022, the inspectors presented the security baseline inspection results to Mr. Dave Carrick, Operations Director and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-101-112

Exelon Security Search Processes

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

SY-AA-101-118

Control of Badges

SY-AA-101-120

Control of Security Access Control Devices

SY-AA-101-130

Security Responsibilities for Station Personnel

SY-AA-1025-229

Acceptance of the Exelon Fitness for Duty and Unescorted

Access Program Requirements for Contractors and Vendors

SY-AA-103-500

Access Authorization Program

SY-AA-103-511

Access Authorization In-Processing/Out-Processing of

Personnel

SY-AA-103-514

Site Authorization for Unescorted Access

SY-QC-101-1009

Vehicle Key Control

71130.02

Procedures

SY-QC-101-410

OCA Warehouse Search Activities

SY-AA-101-103

Observation and Inspection of Security Barriers

SY-QC-101-115

Operation of Active Vehicle Barriers

71130.04

Procedures

SY-QC-101-115-

401

Operation of Power Operated Gates

Calculations

10CFR73BE.QC

Protection Against Land Vehicle Bomb Blast

Quad Cities Station Security Plans

22 LLEA Letters (MOU)

01/31/2022

AR 04516088

NRC Observed Fully Integrated FOF Exercises

08/09/2022

N/A

Quad Cities Subterranean Penetration Report

NOSA-QDC-20-

(AR# 4308330)

Security Programs Audit Report

Quad Cities Station

January 21

to January

31, 2020

Miscellaneous

NOSA-QDC-21-

(AR# 4394294)

Security Programs Audit Report

Quad Cities Station

January 19

to March 05,

21

QCOA 0010-20

Security Event

SY-AA-101

Physical Protection Program

71130.05

Procedures

SY-AA-101-109

Response to Contingency Events

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-101-133-

F-01

Supporting Law Enforcement Agency Response Capability

SY-AA-150-1006-

F-01

Responder Timeline Worksheet

SY-AA-150-1006-

F-02

Adversary Timeline Worksheet

SY-AA-150-102

Security Drills and Exercises

SY-QC-101-501

Quad Cities Station Continency Plan

Self-Assessments

AR# 04468792

Security Pre-NRC Self-Assessment for Access

Control/Protective Strategy

05/12/2022