ML17223B111

From kanterella
Revision as of 07:00, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Nov 1990 for St Lucie Units 1 & 2
ML17223B111
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/1990
From: Breen J
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17223B107 List:
References
NUDOCS 9102260054
Download: ML17223B111 (2)


Text

OPERATING STATUS OPERATING DATA REPORT DOCKET Na 50-335 DATE 12/1%/90 COMPLETED BY Ji Ji BREEN TELEPHONE 407/465/3550 1, UNIT NAME: ST, LUCIE UNIT 1 2, REPORTING PERIOD t NOVEMBER 1990 3 LXCENSED THERMAL POWER (MWT): 2700 4, NAMEPLATE RATING (GROSS MME)i 850 5o DESIGN FLECTRIC*L RATXNG (NET MHE)+830 6.MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE);872 MAXIMUM DEPENDABLE CAPACITY (NET MHE)!839 Bi IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT>GIVE REASONS'OHER LEVEL TO WHICH RESTRICTED~

XF ANY (NET MHE)10.REASONS FOR RESTRICTIONS

~XF ANY e MONTHLY-YTD-CUMULATIVE ii, HOURS IN REPORT PERIOD', 12 o NUMBER OF HOURS REACTOR HAS CRITICAL 13m REACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LXNE 15'NIT RESERVE SHUTDOHN HOURS 16'ROSS THERMAL ENERGY GENERATED (MHH)17, GROSS ELECTRXCAL ENERGY GENERATED (MPH)18'ET ELECTRICAL ENERGY GENERATED (MNH)19.UNXT SERVICE FA'CTOR 20 i UNXT A VAXLABILXTY FACTOR 21'APACITY FACTOR (USXNG MOC NET)22'APACXTY FACTOR.(USXNG DER NET)23'NXT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 720eO 0+0 720+0 OoO 1943136 654080 621821 iepip 100+0 102 i 9 104'.Oea 8016 4825i9 OiO 4723.4 Owe 12333068 4109430 3870868 58i9 58i9 57+6 58o2--I Se5 122232oO 92214i5 205i3 91360o4 39 i 3 235290708 77552500 73269733 74+7 74 i 8 74i4 73 4 3 25 IF SHUT DOWN AT END OF REPORT PERIOD~ESTIMATED DATE OF STARTUP'91022 CK P5PPP335'R OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-389 DATE 12/i9/9e COMPLETED BY J, J, BREEN TELEPHONE 407/465/3550 1, UNIT NAMF: ST o LUCIE UNIT 2 2 o REPORTING PERIOD'OVEMBER 1990'.3.LICENSED THERMAL POHER<MAT): 2700 NAMEPLATE RATING<GROSS MME)o 850 5.DESIGN ELECTRICAL RATING (NET MHE)o 830 6o MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MME)f 839 8, XF CHANGES OCCUR XN CAPACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GXVE REASONS'.POHER LEVEL TO WHICH RESTRICTED

~IF ANY<NET MHE)LQi REASONS FOR RESTRXCTXONSr IF ANY'ONTHLY-YTD-CUMULATIVE iio HOURS XN REPORT PERIODS l:2i NUMBER OF HOURS REACTOR HAS CRXTXCAL l3o REACTOR RESERVE SHUTDOWN HOURS L4i HOURS GENERATOR'N-LINE L5i UNIT RESER'VE SHUTDOHN HOURS f6'ROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY.GENERATED (MWH)18'ET ELECTRXCAL ENERGY GENERATED (MNH)19 i UNXT SERVICE FACTOR 20.UNZT A VAXLABILITY FACTOR 21'APACXTY FACTOR (USXNG MDC NET)22'APACXTY FACTOR (USXNG DER NET)23'NXT FORCED OUTAGE RATE 24, SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 45'0+0 OoO OiO 0.0-7288 OoO OiO OoO OiO 0+0 8016 5987i4 OiO 5839i8 OiO 15415909 5113870 4822084 72i9 72'7io7 72@5 10 i8 64129ie 54156+3 OiO 53194'0+0 139213305 46365780 43835198 82o9 82i9 83i2 83+2 5i9 25, IF SHUT DOWN AT END OF REPORT PERIOD~ESTXMATED DATE OF STARTUP'2/4/90