Category:Inspection Report
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 IR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion IR 05000461/20230062024-02-28028 February 2024 Annual Assessment Letter for Clinton Power Station (Report 05000461/2023006) IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 IR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 IR 05000461/20234202023-08-29029 August 2023 Security Baseline Inspection Report 05000461/2023420 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 IR 05000416/20230902023-06-27027 June 2023 Public Meeting Notice: Grand Gulf Nuclear Station, Dated IR 05000416/2023090 - Preliminary White Finding Choice Letter IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 IR 05000416/20220062023-03-0101 March 2023 Annual Assessment Letter for Grand Gulf Nuclear Station Report 05000416/2022006 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 IR 05000416/20224022023-01-17017 January 2023 Security Baseline Inspection Report 05000416/2022402 (Cover Letter) IR 05000415/20223012022-12-19019 December 2022 NRC Examination Report 05000415/2022301 IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 IR 05000461/20224032022-11-28028 November 2022 Material Control and Accounting Program Inspection Report 05000461/2022403 (Public) 2024-09-09
[Table view] Category:Inspection Report Correspondence
MONTHYEARIR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 IR 05000461/20224032022-11-28028 November 2022 Material Control and Accounting Program Inspection Report 05000461/2022403 (Public) IR 05000461/20224012022-05-24024 May 2022 Security Baseline Inspection Report 05000461/2022401 IR 05000461/20215012022-01-0303 January 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2021501 ML19162A0622019-06-11011 June 2019 Notification of Inspection (NRC Inspection Report 05000416/2019003) and Request for Information ML17202G5792017-07-19019 July 2017 Information Request to Support Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period at Clinton Power Station ML17102A7442017-04-12012 April 2017 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000461/2017003 (Lnr) ML16238A4532016-08-25025 August 2016 Notification of NRC Triennial Heat Sink Performance Inspection (05000416/2016003) and Request for Information IR 05000461/20164082016-07-21021 July 2016 Independent Spent Fuel Storage Installation Cover Letter for NRC Security Inspection Report 05000461/2016408(DNMS) and 07201046/2016401(DNMS) IR 05000416/20164052016-07-21021 July 2016 Cover Letter for NRC Security Baseline Inspection Report 05000416/2016405 IR 05000461/20164032016-07-14014 July 2016 Cyber Security Problem and Identification Inspection Report 05000461/2016403 - Cover Letter Only IR 05000416/20154022016-03-0202 March 2016 Non-Public Security Inspection Plan for Grand Gulf Nuclear Station (NRC Physical Security Inspection Report Number 05000416/2015402) IR 05000461/20135022014-02-12012 February 2014 Ltr 02/12/14 Clinton EP Annual Closeout (RDJ) ML14045A2412014-02-12012 February 2014 EP Annual Closeout (Rdj) IR 05000416/20110022011-06-0808 June 2011 Errata for Grand Gulf - Integrated IR 05000416-11-002, Grand Gulf, Page 34 IR 05000416/20105012011-01-10010 January 2011 IR 05000416-10-501, on 12/31/2010, Grand Gulf Nuclear Station, NRC Emergency Preparedness Annual Inspection (Cover Letter) IR 05000416/20094012010-03-26026 March 2010 NRC Physical Security Annual Inspection Report 05000416-09-401 ML0720706712007-07-26026 July 2007 Final Significance Determination for a Green Finding and Notice of Violation (NRC Physical Security Baseline Inspection Report 05000416-07-402) - Letter Only IR 05000416/20074022007-07-26026 July 2007 Final Significance Determination for a Green Finding and Notice of Violation (NRC Physical Security Baseline Inspection Report 05000416-07-402) - Letter Only ML0713104482007-05-0909 May 2007 NRC Physical Security Baseline Inspection Report 05000416-07-402; Preliminary Greater than Green Finding IR 05000461/20060032006-11-30030 November 2006 IR 05000461-06-003 on 01/30/2006 - 02/02/2006 for Exelon Nuclear Corporate; 10/23/2006 - 10/27/2006; Clinton Power Station - Cover Letter IR 05000461/20060062006-10-18018 October 2006 IR 05000461/2006006 - Cover Letter IR 05000416/20060122006-09-20020 September 2006 NRC Inspection Report for Grand Gulf 05000416-06-012. Cover Letter ML0622904912006-08-17017 August 2006 IR 05000416-06-011 on 07/07/2006 - 07/13/2006, for Grand Gulf Nuclear Station, 95001 Supplemental Inspection IR 05000461/20060052006-06-19019 June 2006 NRC Physical Security Baseline Inspection Report No. 05000461/2006005(DRS) ML0617102122006-06-15015 June 2006 Oak Ridge Institute for Science and Education - Analytical Results for 21 Water Samples, Batch One, from the Vicinity of the Clinton Station, Clinton, Illinois (Inspection Report No. 050-00461/2006-004) (Rfta No. 06-001) ML0504806372005-02-17017 February 2005 Notification of an NRC Triennial Fire Protection Baseline Inspection 05000416/2005008 IR 05000416/20020032002-05-0909 May 2002 IR 05000416/2002-003 on 03/18-04/05/2002; Entergy Operations, Inc., Grand Gulf Nuclear Station, Safety System Design and Performance Capability, and Evaluation of Changes, Tests, or Experiments. No Violations Identified IR 05000416/20010072002-04-18018 April 2002 IR 05000416/2001-007, Entergy Operations, Inc., Grand Gulf Nuclear Station, Integrated Resident & Regional Inspection on 12/30/2001-03/30/2002 Re ALARA Planning and Controls; Biennial Emergency Preparedness Exercise IR 05000461/20020052002-04-11011 April 2002 IR 05000461/2002-005, Amergen Energy Company LLC, Clinton Power Station, Inspection on 02/18-03/31/2002 Re Personnel Performance During Non-Routine Plant Evolutions. One Noncited Violation Noted IR 05000461/20020022002-04-0404 April 2002 IR 05000461/2002-002(DRS), on 02/25-03/01/2002 and 03/11-15/2002, Exelon Generation Company, LLC, Clinton Power Station. Triennial Fire Protection Baseline Inspection Report. No Violations Identified IR 05000461/20010162002-03-15015 March 2002 IR 05000461/2001-016 on 01/01-02/17/2002, Amergen Energy Company LLC, Clinton Power Station; Integrated Inspection Report; Surveillance Testing, Temporary Plant Modifications. Non-cited Violations Noted IR 05000461/20020032002-03-15015 March 2002 IR 05000461/2002-003, on 01/28 - 02/15/2002, Amergen Energy Company LLC, Clinton Power Station; Identification and Resolution of Problems. One Finding Was Identified in the Area of Effectiveness of Corrective Action IR 05000416/20010052002-01-25025 January 2002 IR 05000416/2001-005, Grand Gulf Nuclear Station. Inspection on 09/30 - 12/30/01, Int Res & Reg Insp Rpt; Gaseous & Liquid Effluents; Radiation Environmental Monitoring; Radiation Monitoring Instr; 50.5 Insp; Emerg Action Level & Emerg Plan IR 05000461/20010152002-01-17017 January 2002 IR 05000461/2001-015 DRP, Clinton Power Station, Inspection on 11/19-12/31/2001 Re Licensed Operator Requalification & Occupational Radiation Safety. Two Noncited Violations Noted 2022-05-24
[Table view] Category:Letter
MONTHYEARML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation IR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24149A1592024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 2024-09-09
[Table view] |
Text
ust 17, 2006
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC SUPPLEMENTAL INSPECTION REPORT 05000416/2006011
Dear Mr. Brian:
On July 13, 2006, the US Nuclear Regulatory Commission (NRC) completed a supplemental inspection pursuant to Inspection Procedure 95001 at your Grand Gulf Nuclear Station to follow up on previous security inspection findings. The enclosed report presents the results of this inspection, which were discussed with Mr. G. Williams, Vice-President Operations, and other members of your staff on July 13, 2006. The NRC was informed of your readiness for the inspection on May 15, 2006.
NRC performed the inspection to verify the adequacy of the root cause evaluation and corrective actions implemented in response to a finding of greater than green security significance, as documented in NRC Inspection Report 05000416/2005013. This supplemental inspection was conducted to provide assurance that the root causes and contributing causes of the greater than green finding were understood, to independently assess the extent of the condition and cause, and to provide assurance that the corrective actions to security significant performance issues were sufficient to address the root causes and contributing causes, and prevent recurrence. To accomplish these objectives, the inspector reviewed your root cause analysis and evaluation of extent of condition and conducted an independent inspection to verify or refute your conclusions.
This inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to compliance with the Commissions rules and regulations, orders, and with the conditions of your license. Within these areas, the Grand Gulf Nuclear Station -2-inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.
Based on the results of this inspection no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://WWW.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely, Roy J. Caniano for Dwight D. Chamberlain, Director Division of Reactor Safety Docket No.: 50-416 License No.: NPF-29 Nonpublic Enclosure: Inspection Report 05000416/2006-011 w/Attachment: Supplemental Information cc w/encl:
Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Grand Gulf Nuclear Station -3-General Manager Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Director Nuclear Safety & Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213-8298 Director, Nuclear Safety and Regulatory Affairs Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150