Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006
ML24044A248
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/28/2024
From: Jeffrey Josey
NRC/RGN-IV/DORS/PBC
To: Kapellas B
Entergy Operations
Bloodgood M
References
IR 2023006
Download: ML24044A248 (6)


Text

February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION -

REPORT 05000416/2023006

Dear Brad Kapellas:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Grand Gulf Nuclear Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program

- Operations Phase.

The NRC determined the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In calendar year 2025, the NRC has scheduled five major site activities, which was approved by NRC management. In discussions with your staff, they stated the site will be able to support these inspection activities. The NRC will conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, scheduled for July 2024.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1148 with any questions you have regarding this letter.

Sincerely, Jeffrey E. Josey, Chief Reactor Projects Branch C Division of Operating Reactor Safety Docket No. 05000416 License No. NPF-29 Enclosure:

Inspection Plan Distribution:

[Include ROPassessment.Resource@nrc.gov.]

Signed by Josey, Jeffrey on 02/28/24

ML24044A248 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/PBC SPE:DORS/PBC BC:DORS/PBC NAME MBloodgood WSchaup JJosey SIGNATURE MRB4 WTS1 JEJ1 DATE 02/22/24 02/22/24 02/28/24

Site Inspection Activity Plan 07200050 - Grand Gulf (ISFSI)

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

Grand Gulf ISFSI (Part 72) Loading Inspection (multiple weeks, dry runs, 72.212, first loading, triennial inspection)4

6/1/2025 8/31/2025 IP 60854 001000 Preoperational Testing Of An ISFSI

6/1/2025 8/31/2025 IP 60855 001001 Operation Of An ISFSI

6/1/2025 8/31/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations

Prepared on 2/22/2024 1:20:03 PM 1 of 3 Site Inspection Activity Plan Grand Gulf

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

GG 2024 INITIAL EXAM 1 4

1 1/21/2024 1/27/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection - GG 1

1 3/11/2024 3/15/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 1,3,PI 2

1 3/11/2024 3/15/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1 3/11/2024 3/15/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1 3/11/2024 3/15/2024 IP 71151 000746 Performance Indicator Verification

GG 2024 PI&R Inspection 4

1 4/29/2024 5/3/2024 IP 71152B 000747 Problem Identification and Resolution

1 5/13/2024 5/17/2024 IP 71152B 000747 Problem Identification and Resolution

Security Equipment (.04), Security Training (.07) 2

1 5/20/2024 5/24/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1 5/20/2024 5/24/2024 IP 71130.07 000739 Security Training

EP Program & PI Inspection (2024) - GG 1

1 6/17/2024 6/21/2024 IP 71114.02 000717 Alert and Notification System Testing

1 6/17/2024 6/21/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1 6/17/2024 6/21/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1 6/17/2024 6/21/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness

1 6/17/2024 6/21/2024 IP 71151 001397 Performance Indicator Verification

License Renewal 71003 - GG (Phase 2) 5

1 7/15/2024 7/19/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal

1 7/29/2024 8/2/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal

Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151) 1

1 8/5/2024 8/9/2024 IP 71130.02 000734 Access Control

1 8/5/2024 8/9/2024 IP 71130.09 001656 Security Plan Changes

1 8/5/2024 8/9/2024 IP 71151 001338 Performance Indicator Verification

Fire Protection Inspection - GG 3

1 9/16/2024 9/20/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1 9/30/2024 10/4/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - GG 5

1 9/30/2024 10/4/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

1 10/21/2024 10/25/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

Prepared on 2/22/2024 1:20:03 PM 2 of 3 Site Inspection Activity Plan

RP 5,8 2

1 11/18/2024 11/22/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

1 11/18/2024 11/22/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

Cyber Security - GG 4

1 11/18/2024 11/22/2024 IP 71130.10 000741 Cybersecurity

GG 2024 INITIAL EXAM 2 4

1 10/27/2024 11/2/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 12/1/2024 12/7/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP 1,4,PI - GG 2

1 2/3/2025 2/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1 2/3/2025 2/7/2025 IP 71124.04 000728 Occupational Dose Assessment

1 2/3/2025 2/7/2025 IP 71151 000746 Performance Indicator Verification

EP 2025 Biennial Exercise & PI Inspection - GG 5

1 3/17/2025 3/21/2025 IP 71114.01 000716 Exercise Evaluation

1 3/17/2025 3/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1 3/17/2025 3/21/2025 IP 71151 001397 Performance Indicator Verification

Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151) 1

1 4/7/2025 4/11/2025 IP 71130.02 000734 Access Control

1 4/7/2025 4/11/2025 IP 71130.09 001656 Security Plan Changes

1 4/7/2025 4/11/2025 IP 71151 001338 Performance Indicator Verification

Comprehensive Engineering Team Inspection - Grand Gulf 7

1 4/28/2025 5/2/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

1 5/12/2025 5/16/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

GG 2025 BRQ 2

1 8/17/2025 8/23/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Security Protective Strategy (71130.05) and Target Sets (71130.14) 3

1 9/22/2025 9/26/2025 IP 71130.05 000737 Protective Strategy Evaluation

1 9/22/2025 9/26/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

GG 2026 INITIAL EXAM 5

1 11/30/2025 12/6/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

Prepared on 2/22/2024 1:20:03 PM 3 of 3