Completion of License Renewal Activities Prior to Entering the Period of Extended Operations
ML24191A243
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/09/2024
From: Hardy J
Entergy Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
GNRO2024-00025
Download: ML24191A243 (1)


Text

~ entergy GNRO2024-00025 July 9, 2024 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150 Jeffery A. Hardy Manager Regulatory Assurance Grand Gulf Nuclear Station Tel: 802-380-5124

SUBJECT:

Completion of License Renewal Activities Prior to Entering the Period of Extended Operations Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 Renewed License No. NPF-29 In accordance with the Grand Gulf Nuclear Station Unit 1 (GGNS) Renewed Facility Operating License Condition (C)(50)(b)(3), Entergy Operations Inc. (Entergy) confirms the establishment of GGNS new programs and enhancements to existing programs of Reference 2 are complete except for the following items.

Item 7, Compressed Air Monitoring Program The procedures that will direct the performance of inspections during the period of extended operation (PEO) will be approved prior to entry into PEO on November 2, 2024.

Item 12, Fire Water System Program A project to ensure sprinkler heads are tested or replaced in accordance with NFPA-25 (2011 Edition), Section 5.3.1 will be initiated prior to November 2, 2024. A procedure change to formalize monitoring the fire water system jockey pump has been initiated and will be approved prior to November 2, 2024.

Item 16, Internal Surfaces In Miscellaneous Piping and Ducting Components Program The procedures that will direct the performance of inspections during the PEO will be approved prior to November 2, 2024.

GNRO2024-00025 Page 2 of 2 Item 23, One Time Inspections (OTI) Program The remaining inspections will be completed and the program results will be documented in an engineering report by September 30, 2024.

Item 29, Selective Leaching Program Inspections are complete. The draft engineering report documenting program results will be approved by September 30, 2024.

Item 31, Water Chemistry Control - Closed Treated Water Systems Program The procedures that will direct performance of inspections during the PEO will be approved prior to November 2, 2024.

Certain license renewal programs and activities described in the Updated Final Safety Analysis Report (UFSAR) have been revised as allowed by GGNS License Condition (C)(S0)(a).

This letter contains no new regulatory commitments. Should you have questions concerning the content of this letter, please contact me at 802-380-5124.

SQA~ /

JAH/ram

Reference:

1. Issuance of Renewed Facility Operating License for the Grand Gulf Nuclear Station Unit 1, dated December 1, 2016, (ML16292A462)
2. NUREG-2211, "Safety Evaluation Report, Related to the License Renewal of Grand Gulf Nuclear Station, Unit 1, dated November 30, 2016 (ML16320A015) cc:

NRC Region IV - Regional Administrator NRC Senior Resident Inspector, Grand Gulf Nuclear Station NRR Project Manager