|
---|
Category:Inspection Report
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 IR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 IR 05000416/20230902023-06-27027 June 2023 Public Meeting Notice: Grand Gulf Nuclear Station, Dated IR 05000416/2023090 - Preliminary White Finding Choice Letter ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 IR 05000416/20220062023-03-0101 March 2023 Annual Assessment Letter for Grand Gulf Nuclear Station Report 05000416/2022006 IR 05000416/20224022023-01-17017 January 2023 Security Baseline Inspection Report 05000416/2022402 (Cover Letter) IR 05000415/20223012022-12-19019 December 2022 NRC Examination Report 05000415/2022301 IR 05000416/20220032022-11-0303 November 2022 Integrated Inspection Report 05000416/2022003 IR 05000416/20224032022-11-0101 November 2022 Security Baseline Inspection Report 05000416 2022403 (Cover Letter Only) IR 05000416/20220132022-10-24024 October 2022 Revised Grand Gulf Nuclear Station Design Basis Assurance Inspection Report 05000416/2022013 IR 05000416/20220502022-10-20020 October 2022 Special Inspection Reactive Report 05000416/2022050 ML22280A0292022-10-11011 October 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000416/2022013 IR 05000416/20223012022-09-30030 September 2022 NRC Initial Operator Licensing Examination Approval 05000416/2022301 IR 05000416/20220052022-08-18018 August 2022 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2022005) IR 05000416/20220022022-08-11011 August 2022 Integrated Inspection Report 05000416/2022002 IR 05000416/20220112022-06-0606 June 2022 Biennial Problem Identification and Resolution Inspection Report 05000416/2022011 IR 05000416/20220012022-05-0909 May 2022 Integrated Inspection Report 05000416/2022001 IR 05000416/20220122022-04-20020 April 2022 License Renewal Phase 1 NRC Inspection Report 05000416/2022012 IR 05000416/20210062022-03-0202 March 2022 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2021006) IR 05000416/20210042022-02-0808 February 2022 Integrated Inspection Report 05000416/2021004 IR 05000416/20214202022-02-0707 February 2022 Cover Letter for Grand Nuclear Station, Unit 1 Security Baseline Inspection Report 05000416/2021420 IR 05000416/20200132022-02-0303 February 2022 Amended - Grand Gulf Nuclear Station - Triennial Fire Protection Inspection Report 05000416/2020013 and Notice of Violation ML22011A0992022-01-14014 January 2022 IR 2021012 EOI CO3 ML21349B3372021-12-15015 December 2021 NOV_EA-20-125 21-096 21-110_GG Combined Case IR 05000416/20213012021-12-14014 December 2021 NRC Examination Report 05000416/2021301 IR 05000416/20210402021-11-18018 November 2021 NRC Supplemental Inspection Report 05000416/2021040 and Assessment Follow-Up Letter IR 05000416/20210032021-11-10010 November 2021 Integrated Inspection Report 05000416/2021003 and Independent Spent Fuel Storage Installation Report 07200050/2021001 ML21265A3562021-09-22022 September 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000416/2021004) and Request for Information 2024-09-09
[Table view] Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24149A1592024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24087A1962024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 2024-09-09
[Table view] |
Text
ary 11, 2007
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC SECURITY TEAM INSPECTION REPORT 05000416/2006006.
Dear Mr. Brian:
On December 8, 2006, the US Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Grand Gulf Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results which were discussed on December 8, 2006, with Mr. Krupa, Acting General Manager, and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. The finding was NRC-identified.
Safeguards Information determination made by:
WARNING: Violation of Section 147 of the Atomic Name/Title David Holman/Security Inspecgtor Energy Act, protection requirements for "SAFEGUARDS Organization NRC/RIV/DRS/PSB Basis 10 CFR 73.21 INFORMATION," is subject to civil and criminal penalties.
Signature /RA/ Date 12/18/06 Document transmitted herewith contains . When separated from enclosure(s) or attachment(s), this document is decontrolled. Entergy Operations, Inc. -2-NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it is entered into your corrective action program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-001: with copies to the Regional Administrator Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-001; and the NRC Resident Inspector at the Grand Gulf Nuclear Station.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information - Withhold under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Docket No.: 50-416 License No.: NPF-29 Nonpublic Enclosure: Inspection Report 05000416/2006006 w/attachment: Supplemental Information Document transmitted herewith contains . When separated from enclosure(s) or attachment(s), this document is decontrolled. Entergy Operations, Inc. -3-cc w/o enclosure:
Executive Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 General Manager, Plant Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Director Nuclear Safety & Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213-8298 Director, Nuclear Safety Assurance Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Document transmitted herewith contains . When separated from enclosure(s) or attachment(s), this document is decontrolled.