IR 05000416/2024005
| ML24232A257 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/21/2024 |
| From: | Jeffrey Josey NRC/RGN-IV/DORS |
| To: | Kapellas B Entergy Operations |
| References | |
| IR 2024005 | |
| Download: ML24232A257 (1) | |
Text
August 21, 2024
SUBJECT:
UPDATED INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2024005).
Dear Brad Kapellas:
The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Grand Gulf Nuclear Staton. The Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1148 with any questions you have regarding this letter.
Sincerely, Jeffrey E. Josey, Chief Reactor Projects Branch C Division of Operating Reactor Safety
Docket No. 05000416 License No. NPF-29
Enclosure:
Inspection Plan
cc w/ encl: Distribution via LISTSERV Signed by Josey, Jeffrey on 08/21/24
ML24232A257 X SUNSI Review By: WSchaup ADAMS:
X Yes No Sensitive X Non-Sensitive Non-Publicly Available X Publicly Available Keyword NRC-002 OFFICE SPE:DORS/C BC:DORS/C NAME WSchaup JJosey SIGNATURE
/RA/
/RA/
DATE 8/21/2024 8/21/2024
Site Inspection Activity Plan Prepared on 8/14/2024 1:19:30 PM Enclosure 1 of 3 07200050 - Grand Gulf (ISFSI)
07/01/2024 - 06/30/2026 Grand Gulf ISFSI (Part 72) Loading Inspection (multiple weeks, dry runs, 72.212, first loading, triennial inspection)
6/1/2025 8/31/2025 IP 60854 001000 Preoperational Testing Of An ISFSI 6/1/2025 8/31/2025 IP 60855 001001 Operation Of An ISFSI 6/1/2025 8/31/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations
Unit Start End Activity CAC Title Staff Count
Prepared on 8/14/2024 1:19:30 PM 2 of 3 Grand Gulf 07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count License Renewal 71003 - GG (Phase 2)
1 7/15/2024 7/19/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal
7/28/2024 8/3/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151)
1 8/5/2024 8/9/2024 IP 71130.02 000734 Access Control
8/5/2024 8/9/2024 IP 71130.09 001656 Security Plan Changes
8/5/2024 8/9/2024 IP 71151 001338 Performance Indicator Verification Fire Protection Inspection - GG
1 9/16/2024 9/20/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
9/30/2024 10/4/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - GG
1 9/30/2024 10/4/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
10/21/2024 10/25/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP 5,8
1 11/18/2024 11/22/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation
11/18/2024 11/22/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Cyber Security - GG
1 11/18/2024 11/22/2024 IP 71130.10 000741 Cybersecurity GG 2024 INITIAL EXAM 2
1 10/27/2024 11/2/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
12/1/2024 12/7/2024 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
1 2/3/2025 2/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2/3/2025 2/7/2025 IP 71124.04 000728 Occupational Dose Assessment
2/3/2025 2/7/2025 IP 71151 000746 Performance Indicator Verification EP 2025 Biennial Exercise & PI Inspection - GG
1 3/17/2025 3/21/2025 IP 71114.01 000716 Exercise Evaluation
3/17/2025 3/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
3/17/2025 3/21/2025 IP 71151 001397 Performance Indicator Verification Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151)
1 4/7/2025 4/11/2025 IP 71130.02 000734 Access Control
4/7/2025 4/11/2025 IP 71130.09 001656 Security Plan Changes
4/7/2025 4/11/2025 IP 71151 001338 Performance Indicator Verification
Prepared on 8/14/2024 1:19:30 PM 3 of 3 Comprehensive Engineering Team Inspection - Grand Gulf
1 4/28/2025 5/2/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
5/12/2025 5/16/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection GG 2025 BRQ
1 8/17/2025 8/23/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Protective Strategy (71130.05) and Target Sets (71130.14)
1 9/22/2025 9/26/2025 IP 71130.05 000737 Protective Strategy Evaluation
9/22/2025 9/26/2025 IP 71130.14 000743 Review of Power Reactor Target Sets GG 2026 INITIAL EXAM 1
1 11/30/2025 12/6/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1/11/2026 1/17/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection - GG
1 2/23/2026 2/27/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1 2/23/2026 2/27/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2/23/2026 2/27/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
2/23/2026 2/27/2026 IP 71151 000746 Performance Indicator Verification License Renewal-GG 71003 (Phase 3)
1 4/27/2026 5/1/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal RP 5,6,7,8 - GG
1 5/18/2026 5/22/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation
5/18/2026 5/22/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
5/18/2026 5/22/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program
5/18/2026 5/22/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation EP Program & PI Inspection (2026) - GG
1 6/8/2026 6/12/2026 IP 71114.02 000717 Alert and Notification System Testing
6/8/2026 6/12/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
6/8/2026 6/12/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
6/8/2026 6/12/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness
6/8/2026 6/12/2026 IP 71151 001397 Performance Indicator Verification