Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6121997-08-29029 August 1997 LER 97-007-00:on 970730,automatic Reactor Trip Occurred. Caused by Closure of B Main Steam Isolation Valve.Failed W Relay & Equivalent Relays Were replaced.W/970829 Ltr ML17354A6081997-08-18018 August 1997 LER 97-006-00:on 970722,manual Reactor Trip Occurred Due to Failed Rod Control Power Supplies.Replaced Twelve Power Supplies in Rod Control Logic & Power cabinets.W/970818 Ltr ML17354A5801997-07-14014 July 1997 LER 97-005-00:on 970618,RCP Oil Collection Sys Was Found Outside Design Basis.Caused Because Design Did Not Consider Component Parts to Be Potential Leakage Sources.Entire RCP Oil Collection Sys Was reviewed.W/970714 Ltr ML17354A5141997-05-22022 May 1997 LER 97-002-00:on 970423,automatic Reactor Tripped.Caused by Actuation of Turbine Overspeed Protection Circuit. Administrative Procedures Governing Inadequate Work Controls Will Be Revised to Capture Lessons learned.W/970522 Ltr ML17354A5061997-05-0909 May 1997 LER 97-003-00:on 970410,mode Changed W/O Meeting Requirements of TS 3.0.4 Due to Inadequate Procedural Guidance.Night Order Was Issued to Inform Personnel That S/G Blowdown Keylock Switches Were Left in drain.W/970509 Ltr ML17354A5051997-05-0909 May 1997 LER 97-004-00:on 970411,auxiliary Feedwater Automatic Start Upon Trip of All Main Feedwater Pumps,Occurred.Caused by Mispositioned Valve Closing.Valves Listed as Inappropriately Positioned Were repositioned.W/970509 Ltr ML17354A4781997-04-25025 April 1997 LER 97-001-00:on 970327,ECCS Recirculation Loop Leakage Was Found to Be in Condition Outside Design Basis Due to Gasket Movement During Installation During Spring 1966 Reassembly. Gasket Replaced & Pump tested.W/970425 Ltr ML17354A4581997-03-28028 March 1997 LER 97-002-00:on 970303,manual Reactor Trip Following Rod Control Urgent Failure Alarm Occurred.Caused by Phase Failure Detection on Stationary a Circuits of 2BD Rod Control Cabinet.Air Conditioning replaced.W/970328 Ltr ML17354A4511997-03-26026 March 1997 LER 97-001-00:on 970118,missed Surveillance on CR Position Verification Occurred Due to Inoperable Rod Deviation Monitor.Faulty Circuit Common Connection Was Corrected & Rdm Operability Was restored.W/970326 Ltr ML17354A4061997-02-0303 February 1997 LER 96-004-03:on 970107,identified Three Instances of Inadequate Surveillance Testing.Caused by Inadequate Surveillance Procedures.Surveillance Procedures Revised ML17354A3771996-12-27027 December 1996 LER 96-012-00:on 961204,determined Containment Average Temp Being Determined Based on Only Two Temp Elements Instead of Three as Required by Tss.Caused by Log Only Requiring One Entry.Log revised.W/961227 Ltr ML17354A3261996-11-0606 November 1996 LER 96-011-00:on 961009,potential for Overpressurizing Post Accident Containment Vent Filter Housings Occurred.Caused by Improper Change Mgt.Monitoring Sys Operating Procedures revised.W/961106 Ltr ML17354A3071996-10-22022 October 1996 LER 96-010-00:on 960924,manual Reactor Shutdown Occurred. Caused by Failed Rod Control Sys Regulation Card in 2AC Power cabinet.2AC Power Cabinet DC Power Supplies,Cabling & Connectors checked.W/961022 Ltr ML17353A8711996-08-27027 August 1996 LER 96-009-00:on 960729,failed to Reflect Heavy Load Design Info in Procedural Controls.Caused by Failure to Incorporate 1982 Procedure Changes.Suspended Lifting of Heavy Loads & Took Turbine Bldg Crane OOS.W/960827 Ltr ML17353A7411996-06-18018 June 1996 LER 96-008-00:on 960521,surveillance Method for Testing Emergency Diesel Generators (EDG) Determined Inadequate. Caused by Personnel Error.All Four EDGs Rapid Start Tested & EDG Surveillance Procedures modified.W/960618 Ltr ML17353A7401996-06-18018 June 1996 LER 96-004-02:on 960524,identified Inadequate Surveillance Testing.Caused by Inadequate Surveillance Procedures.Entered Tech Spec Statements,Tested Required Instruments Functions & Revised Plant procedure.W/960618 Ltr ML17353A6901996-05-13013 May 1996 LER 96-004-01:on 960220,identified Potential Tech Spec non-compliance Associated W/Surveillance Testing of AFW Actuation Circuitry on Sg.Caused by Inadequate Surveillance Procedures.Procedures revised.W/960513 Ltr ML17353A6741996-05-0606 May 1996 LER 96-001-00:on 960409,manual Rt Occurred Due to Turbine Governer Control Oil Perturbation.Disassembled & Inspected Governor Valve for Cleanliness & Corrosion products.W/960506 Ltr ML17353A6651996-04-29029 April 1996 LER 96-007-00:on 960329,inadvertent ESF Actuation Occurred During Refueling Outage Due to Cognitive Personnel Error. Personnel Involved Counseled & Integrated Safeguards Test Procedures Being revised.W/960429 Ltr ML17353A6601996-04-25025 April 1996 LER 96-006-00:on 960327,manual Rt Occurred Due to 3C Transformer Lockout & Loss of 3B SG Mfp.Replaced SAM Timer Relay in 3AC16.W/960425 Ltr ML17353A6491996-04-23023 April 1996 LER 96-005-00:on 960326,certain Safety Injection Accumulator Filled Evolutions Resulted in cross-tied Configuration.C/A: Night Order Written & Operations Procedure 3/4-OP-064 revised.W/960423 Ltr ML17353A6051996-03-18018 March 1996 LER 96-003-00:on 960222,two Arpi Inoperable & TS 3.0.3 Entered.Proposed License Amend Submitted to Revise Allowed Misalignment from +/-12 Steps to =/-18 Steps Between Arpi & Dpi at Less than 90% power.W/960318 Ltr ML17353A6041996-03-18018 March 1996 LER 96-004-00:on 960220,surveillance Testing of AFW Actuation Circuitry Was Inadequate.Caused by Inadequate Surveillance Procedures.Tested Untested Portions of Actuation Logic for AFW Automatic Start signal.W/960318 Ltr ML17353A5861996-03-0606 March 1996 LER 96-002-00:on 960209,automatic Turbine Trip/Rt Occurred Due to High SG Level.Caused by Personnel Error.Replaced Both Hinge Pins on B Sgfp Discharge Check valve.W/960306 Ltr ML17353A5761996-03-0101 March 1996 LER 96-001-00:on 960131,intake CWS Flow Rates Found W/ Potential to Be Less than Required by Design Basis.Caused by Influx of Aquatic Grass & Algae Onto Basket Strainers of Icw Flow Path.Mechanically Cleaned strainers.W/960301 Ltr ML17353A4451995-11-0909 November 1995 LER 95-007-00:on 951017,manual Rt Occurred Following Drop of Four Control Rods.Caused by Water Intrusion Into Rod Control Power Cabinet 2BD.Inspected Control Power Cabinet 2BD for Other Water damage.W/951109 Ltr ML17353A4241995-10-12012 October 1995 LER 95-006-00:on 950913,analysis Showed That CCW Exchangers Susceptible to Damage Due to flow-induced Vibration.Ccw Sys Has Been Flow Balanced to Closer tolerances.W/951012 Ltr ML17353A3601995-09-13013 September 1995 LER 95-005-00:on 950818,containment Pressure Testing Procedure Resulted in Inhibiting Both Trains of Containment Pressure from Initiated Esf.Revised Procedure to Require Testing of Each Train separately.W/950913 Ltr ML17353A2951995-07-17017 July 1995 LER 94-005-02:on 941103,both Units Outside Design Basis Due to Design Defect in Safeguards Bus Sequencer Test Logic. Resumed Monthly Manual Testing of Sequencer ML17352B1581995-05-0505 May 1995 LER 95-004-00:on 950407,unit Being Shutdown to Investigate Recurring non-urgent Failure Alarms from Redundant Rod Control Power Supplies.Reactor Manually Tripped.All Four PS-3 Power Supplies replaced.W/950505 Ltr ML17352B1181995-04-0707 April 1995 LER 95-003-00:on 950309,intake Cooling Water Flow Rate Through CCW Heat Exchangers Fell Below Assumed Design Basis. Caused by an Influx of Aquatic Grass & Algae Onto Basket Strainers.Strainers cleaned.W/950407 Ltr ML17352B0701995-03-13013 March 1995 LER 95-002-00:on 950215,inadequate Definition of Loops Filled Resulted in Units in Condition Prohibited by Ts. Issued TS Position Statement to Define Term Loops Filled as Used in TS 6.4.1.1.4.W/950313 Ltr ML17352B0321995-02-0909 February 1995 LER 94-005-01:on 941103,design Defect Found in Safeguards Bus Sequencer Test Logic,Placing Facility Outside Design Basis.Design Mods to Eliminate Software Logic Problems Will Be Implemented During Next Refueling outages.W/950209 Ltr ML17352B0101995-01-20020 January 1995 LER 94-006-00:on 941226,C Main Feedwater Control Valve Failed Closed,Causing Reactor & Turbine Trips.Caused by Loose Screw Terminal Connection.I/P Transducers Replaced W/ New Model W/Different Design Wire connection.W/950120 Ltr ML17352A9511994-12-13013 December 1994 LER 94-006-00:on 941130,Unit 4 Tripped Automatically.Caused by Failure of Flexible Link Connection Between Main Generator B Phase Bus & Associated Isolated Phase Bus Bar. All Bolts on Flexible Link checked.W/941213 Ltr ML17352A8871994-11-10010 November 1994 LER 94-005-00:on 941103,design Defect in Safeguards Bus Sequencer Test Logic Places Both Units Outside Design Basis. Caused by 3A Sequencer Failed to Respond as Expected to Opposite Unit SI signal.W/941110 Ltr ML17352A8851994-11-10010 November 1994 LER 94-004-00:on 941103,Unit 3 Outside Design Basis Due to Two of Three Required Safety Injection Pumps Inoperable. Control Switches for 3A & 3B Safety Injection Pumps Immediately Returned to automatic.W/941110 Ltr ML17352A8421994-10-21021 October 1994 LER 94-004-00:on 940923,Unit 4 Tripped Automatically from Rated Power.Caused by Faulty Regulator Transistor.Faulty Backup Power Supply Replaced & Maint History for Power Supplies reviewed.W/941021 Ltr ML17352A8431994-10-20020 October 1994 LER 94-005-00:on 940924,Unit 4 Manually Tripped.Caused by Manual Actuation.Light Bulb & Socket replaced.W/941020 Ltr ML17352B1671994-08-16016 August 1994 LER 94-003-00:on 940720 & 21,util Discovered That Several Required Valve Stroke Time Surveillances Had Not Been Performed.Caused by Personnel Error.Personnel Reassigned & Procedures and Surveillance Tracking Software Enhanced 1999-07-20
[Table view] Category:RO)
MONTHYEARML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6121997-08-29029 August 1997 LER 97-007-00:on 970730,automatic Reactor Trip Occurred. Caused by Closure of B Main Steam Isolation Valve.Failed W Relay & Equivalent Relays Were replaced.W/970829 Ltr ML17354A6081997-08-18018 August 1997 LER 97-006-00:on 970722,manual Reactor Trip Occurred Due to Failed Rod Control Power Supplies.Replaced Twelve Power Supplies in Rod Control Logic & Power cabinets.W/970818 Ltr ML17354A5801997-07-14014 July 1997 LER 97-005-00:on 970618,RCP Oil Collection Sys Was Found Outside Design Basis.Caused Because Design Did Not Consider Component Parts to Be Potential Leakage Sources.Entire RCP Oil Collection Sys Was reviewed.W/970714 Ltr ML17354A5141997-05-22022 May 1997 LER 97-002-00:on 970423,automatic Reactor Tripped.Caused by Actuation of Turbine Overspeed Protection Circuit. Administrative Procedures Governing Inadequate Work Controls Will Be Revised to Capture Lessons learned.W/970522 Ltr ML17354A5061997-05-0909 May 1997 LER 97-003-00:on 970410,mode Changed W/O Meeting Requirements of TS 3.0.4 Due to Inadequate Procedural Guidance.Night Order Was Issued to Inform Personnel That S/G Blowdown Keylock Switches Were Left in drain.W/970509 Ltr ML17354A5051997-05-0909 May 1997 LER 97-004-00:on 970411,auxiliary Feedwater Automatic Start Upon Trip of All Main Feedwater Pumps,Occurred.Caused by Mispositioned Valve Closing.Valves Listed as Inappropriately Positioned Were repositioned.W/970509 Ltr ML17354A4781997-04-25025 April 1997 LER 97-001-00:on 970327,ECCS Recirculation Loop Leakage Was Found to Be in Condition Outside Design Basis Due to Gasket Movement During Installation During Spring 1966 Reassembly. Gasket Replaced & Pump tested.W/970425 Ltr ML17354A4581997-03-28028 March 1997 LER 97-002-00:on 970303,manual Reactor Trip Following Rod Control Urgent Failure Alarm Occurred.Caused by Phase Failure Detection on Stationary a Circuits of 2BD Rod Control Cabinet.Air Conditioning replaced.W/970328 Ltr ML17354A4511997-03-26026 March 1997 LER 97-001-00:on 970118,missed Surveillance on CR Position Verification Occurred Due to Inoperable Rod Deviation Monitor.Faulty Circuit Common Connection Was Corrected & Rdm Operability Was restored.W/970326 Ltr ML17354A4061997-02-0303 February 1997 LER 96-004-03:on 970107,identified Three Instances of Inadequate Surveillance Testing.Caused by Inadequate Surveillance Procedures.Surveillance Procedures Revised ML17354A3771996-12-27027 December 1996 LER 96-012-00:on 961204,determined Containment Average Temp Being Determined Based on Only Two Temp Elements Instead of Three as Required by Tss.Caused by Log Only Requiring One Entry.Log revised.W/961227 Ltr ML17354A3261996-11-0606 November 1996 LER 96-011-00:on 961009,potential for Overpressurizing Post Accident Containment Vent Filter Housings Occurred.Caused by Improper Change Mgt.Monitoring Sys Operating Procedures revised.W/961106 Ltr ML17354A3071996-10-22022 October 1996 LER 96-010-00:on 960924,manual Reactor Shutdown Occurred. Caused by Failed Rod Control Sys Regulation Card in 2AC Power cabinet.2AC Power Cabinet DC Power Supplies,Cabling & Connectors checked.W/961022 Ltr ML17353A8711996-08-27027 August 1996 LER 96-009-00:on 960729,failed to Reflect Heavy Load Design Info in Procedural Controls.Caused by Failure to Incorporate 1982 Procedure Changes.Suspended Lifting of Heavy Loads & Took Turbine Bldg Crane OOS.W/960827 Ltr ML17353A7411996-06-18018 June 1996 LER 96-008-00:on 960521,surveillance Method for Testing Emergency Diesel Generators (EDG) Determined Inadequate. Caused by Personnel Error.All Four EDGs Rapid Start Tested & EDG Surveillance Procedures modified.W/960618 Ltr ML17353A7401996-06-18018 June 1996 LER 96-004-02:on 960524,identified Inadequate Surveillance Testing.Caused by Inadequate Surveillance Procedures.Entered Tech Spec Statements,Tested Required Instruments Functions & Revised Plant procedure.W/960618 Ltr ML17353A6901996-05-13013 May 1996 LER 96-004-01:on 960220,identified Potential Tech Spec non-compliance Associated W/Surveillance Testing of AFW Actuation Circuitry on Sg.Caused by Inadequate Surveillance Procedures.Procedures revised.W/960513 Ltr ML17353A6741996-05-0606 May 1996 LER 96-001-00:on 960409,manual Rt Occurred Due to Turbine Governer Control Oil Perturbation.Disassembled & Inspected Governor Valve for Cleanliness & Corrosion products.W/960506 Ltr ML17353A6651996-04-29029 April 1996 LER 96-007-00:on 960329,inadvertent ESF Actuation Occurred During Refueling Outage Due to Cognitive Personnel Error. Personnel Involved Counseled & Integrated Safeguards Test Procedures Being revised.W/960429 Ltr ML17353A6601996-04-25025 April 1996 LER 96-006-00:on 960327,manual Rt Occurred Due to 3C Transformer Lockout & Loss of 3B SG Mfp.Replaced SAM Timer Relay in 3AC16.W/960425 Ltr ML17353A6491996-04-23023 April 1996 LER 96-005-00:on 960326,certain Safety Injection Accumulator Filled Evolutions Resulted in cross-tied Configuration.C/A: Night Order Written & Operations Procedure 3/4-OP-064 revised.W/960423 Ltr ML17353A6051996-03-18018 March 1996 LER 96-003-00:on 960222,two Arpi Inoperable & TS 3.0.3 Entered.Proposed License Amend Submitted to Revise Allowed Misalignment from +/-12 Steps to =/-18 Steps Between Arpi & Dpi at Less than 90% power.W/960318 Ltr ML17353A6041996-03-18018 March 1996 LER 96-004-00:on 960220,surveillance Testing of AFW Actuation Circuitry Was Inadequate.Caused by Inadequate Surveillance Procedures.Tested Untested Portions of Actuation Logic for AFW Automatic Start signal.W/960318 Ltr ML17353A5861996-03-0606 March 1996 LER 96-002-00:on 960209,automatic Turbine Trip/Rt Occurred Due to High SG Level.Caused by Personnel Error.Replaced Both Hinge Pins on B Sgfp Discharge Check valve.W/960306 Ltr ML17353A5761996-03-0101 March 1996 LER 96-001-00:on 960131,intake CWS Flow Rates Found W/ Potential to Be Less than Required by Design Basis.Caused by Influx of Aquatic Grass & Algae Onto Basket Strainers of Icw Flow Path.Mechanically Cleaned strainers.W/960301 Ltr ML17353A4451995-11-0909 November 1995 LER 95-007-00:on 951017,manual Rt Occurred Following Drop of Four Control Rods.Caused by Water Intrusion Into Rod Control Power Cabinet 2BD.Inspected Control Power Cabinet 2BD for Other Water damage.W/951109 Ltr ML17353A4241995-10-12012 October 1995 LER 95-006-00:on 950913,analysis Showed That CCW Exchangers Susceptible to Damage Due to flow-induced Vibration.Ccw Sys Has Been Flow Balanced to Closer tolerances.W/951012 Ltr ML17353A3601995-09-13013 September 1995 LER 95-005-00:on 950818,containment Pressure Testing Procedure Resulted in Inhibiting Both Trains of Containment Pressure from Initiated Esf.Revised Procedure to Require Testing of Each Train separately.W/950913 Ltr ML17353A2951995-07-17017 July 1995 LER 94-005-02:on 941103,both Units Outside Design Basis Due to Design Defect in Safeguards Bus Sequencer Test Logic. Resumed Monthly Manual Testing of Sequencer ML17352B1581995-05-0505 May 1995 LER 95-004-00:on 950407,unit Being Shutdown to Investigate Recurring non-urgent Failure Alarms from Redundant Rod Control Power Supplies.Reactor Manually Tripped.All Four PS-3 Power Supplies replaced.W/950505 Ltr ML17352B1181995-04-0707 April 1995 LER 95-003-00:on 950309,intake Cooling Water Flow Rate Through CCW Heat Exchangers Fell Below Assumed Design Basis. Caused by an Influx of Aquatic Grass & Algae Onto Basket Strainers.Strainers cleaned.W/950407 Ltr ML17352B0701995-03-13013 March 1995 LER 95-002-00:on 950215,inadequate Definition of Loops Filled Resulted in Units in Condition Prohibited by Ts. Issued TS Position Statement to Define Term Loops Filled as Used in TS 6.4.1.1.4.W/950313 Ltr ML17352B0321995-02-0909 February 1995 LER 94-005-01:on 941103,design Defect Found in Safeguards Bus Sequencer Test Logic,Placing Facility Outside Design Basis.Design Mods to Eliminate Software Logic Problems Will Be Implemented During Next Refueling outages.W/950209 Ltr ML17352B0101995-01-20020 January 1995 LER 94-006-00:on 941226,C Main Feedwater Control Valve Failed Closed,Causing Reactor & Turbine Trips.Caused by Loose Screw Terminal Connection.I/P Transducers Replaced W/ New Model W/Different Design Wire connection.W/950120 Ltr ML17352A9511994-12-13013 December 1994 LER 94-006-00:on 941130,Unit 4 Tripped Automatically.Caused by Failure of Flexible Link Connection Between Main Generator B Phase Bus & Associated Isolated Phase Bus Bar. All Bolts on Flexible Link checked.W/941213 Ltr ML17352A8871994-11-10010 November 1994 LER 94-005-00:on 941103,design Defect in Safeguards Bus Sequencer Test Logic Places Both Units Outside Design Basis. Caused by 3A Sequencer Failed to Respond as Expected to Opposite Unit SI signal.W/941110 Ltr ML17352A8851994-11-10010 November 1994 LER 94-004-00:on 941103,Unit 3 Outside Design Basis Due to Two of Three Required Safety Injection Pumps Inoperable. Control Switches for 3A & 3B Safety Injection Pumps Immediately Returned to automatic.W/941110 Ltr ML17352A8421994-10-21021 October 1994 LER 94-004-00:on 940923,Unit 4 Tripped Automatically from Rated Power.Caused by Faulty Regulator Transistor.Faulty Backup Power Supply Replaced & Maint History for Power Supplies reviewed.W/941021 Ltr ML17352A8431994-10-20020 October 1994 LER 94-005-00:on 940924,Unit 4 Manually Tripped.Caused by Manual Actuation.Light Bulb & Socket replaced.W/941020 Ltr ML17352B1671994-08-16016 August 1994 LER 94-003-00:on 940720 & 21,util Discovered That Several Required Valve Stroke Time Surveillances Had Not Been Performed.Caused by Personnel Error.Personnel Reassigned & Procedures and Surveillance Tracking Software Enhanced 1999-07-20
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
gccP~RATED DIPBUTION DKMONSTR~Y 'YSIZM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8910190123 DOC.DATE: 89/10/12 NOTARIZED: NO DOCKET FACIL:50-251 Turkey Point Plant, Unit'4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION POWELL,D.R. Florida Power & Light Co.
HARRIS,K.N. Florida Power & Light Co.
'RECIP.NAME RECIPIENT AFFILIATION SUWECT: LER auto stop oil line break.'/8 89-011-00:on 890915,turbine stop valve closure due to SIZE:
ltr.
DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL
'1 ID CODE/NAME LTTR ENCL PD2-2 LA 1 PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 DEDRO 1 1 NRR/DEST/ESB 8D 1' 1 NRR/DEST/ICSB 7 NRR/DEST/MTB 9H 1
1 1
1 NRR/DEST/MEB NRR/DEST/PSB 9H 8D 1
1 '1
. 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1 N REP RPB 10 2 2 NUDOCS-ABSTRACT 1 1 REG 02 1 1 RES/DSIR/EIB 1 '1 C82 FILE 01 1 1 EXTERNAL EG&G WILLIAMS~ S 4 4 L ST LOBBY WARD 1 1 LPDR NSIC MAYS,G NUDOCS FULL TXT 1
1 1
1 1
"1 NRC PDR NSIC MURPHY,G.A 1, 1 1 1
NOXE TO ALL 'KIDS" RECIPIENIS'IZASE HELP US TO REDKZ HASTE! CGg~ 'IHE DXGNEÃZ CONGEAL DESK RDCN Pl-37 (EZI'. 20079) K) ELQQBAXR YOUR NAME FKR DIPHGEPZICRi LISTS BDR DOCUMEHIS YOU DQiN~T NEZDt FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 38 ENCL 38
P. O. Box 3088, Florida City, FL 33034 I 89-374 10 CFR 50.73 U. S. Nuclear Regulatory Commission Attn:, Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkey Point Unit 4 Docket No. 50-251 Reportablc Event: 89-11 Date of Event: September 15, 1989 Turbine Stop Valve Closure Due to Auto Stop Oil Leak Resulted In a Manual Reactor Tri And A Manual Safet In'ection The attached Licensee Event Report is being submitted pursuant to the requirements of 10 CFR 50.73 to provide notification of the subject event.
Very truly yours,
.
i9 /,mar~.g K. ! Harris - Vice Prcsidcnt Tur ey Point Plant Nuclear KNH/JEC/VAK/DRP/DWH Attachment CC: Stcv,art D; Ebnctcr, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant
NAC Ports 555 (9021 VA. NIICLKAAAEOVLATORY COMMISSION APPAOVEO OMS NO. 21500)OC LICENSEE EVENT REPORT {LER) EXPIRES: 5/21( 55 PACILITY NAME (11 DOCKET NUMSEA (21 PA Turke Point Unit 4 0 5 0 0. 02 511oFO 6 Turbine Stop Valve Closure ue o u o op Line Leak Resulted In A Manual Reactor Trip And A 11anual Safety Injection EVENT DATE IS) LER NVMSER (5) RKPOA'Z DATE (71 OZHCA FACILITIES INVOLVED IS)
MONTH DAY YEAR YEAR 5 5 0 V 5 N 7 I A I. (I;":.
Ir UMS ~ II
<<VII
NVMSCR MONTH OAY YEAR SACILITY NAMES DOCKET NUMSER(SI 0 5 0 0 0 011 001 1 2 8 9 0 5 0 0 0 OPS RAT INC THIS AEpoRT Is SUSMITTED PUASUAHT TO THK REQUIREMENTS OP 10 cpA (): Ichecs ohe ot mote ot the torte~opt Ill)
MODE IS) S02(5) 20.505(c) 50.7241(2)(N I 72.71( ~ I
~ O)YE A 20.505( ~ 111110 50.25(c I (I ) 50.724)(21(rl 72.71(c)
LKVEL (101 20 S05(s)11)(51 SOW(cl(2) 50.724) (21(rSI OTHER (Soecity rh AOIOeCt Oetorr shoih Tert. HAC Pooh 20.s05( ~ )ill(el) 50.72(sl 0 I I il 50.724) (2) (rtil)(A) 2EEA) 20.505 4) (I I (lr) 50.72(s) l21I5 I
'A".ce::.'"'::,",."'0 20.505 4) I I I I r) 50.7 241(2)(IS I 50.'72(s l(21(rIS) ( ~ I 50.72(sl(21(s)
LICCNSEE CONTACT POR THIS LKA (12)
NAME TELEPHONE NUMSER AREA CODE David R. Powell, Regulation and Compliance Supervisor 3 5246 -655 COMPLETE ONK LINE POA EACH COMPONCNT PAILUAK DCSCAI ~ CD IN THIS REPORT ()21 CAUS'E SYSTEM COMPOHEHT MAHUPAC. MANUPAC. EPORTASL TUNER CAUSE SYSTEM COMPOHEHT
x@gc<@>re$ TUNER TO NPROS W ELD X 999 N B C B' S U07 5 Y' A A I MOD H015 D J FS A60 9 Y SUPPLEMENTAL ACPOAZ EXPECTED (lcl MONTH OAY YEAR EXPECTED SUSMISSION DAZE 115)
YES (tt yet, compiete EXI'ECTED $ (IESIISSION OATEI X AssTAAcT (Limit to Ic00 Ipecet.'i.e., eppes ~ imetsty tatters Iihpie specs typerrrrttsh tiheet 115)
At 0426, on September 15, 1989, with Unit 4 operating at 100 percent power, a manual reactor trip was initiated. A High Pressure (HP) tur-bine stop valve Auto Stop Oil line weld leak identified at 0045 led to closure of 'the stop valve. When the control rods failed to insert in automatic or manual in response to the sudden turbine po~er decrease, as called for by a T-AVE/T-REF mismatch signal, a manual reactor trip was initiated. A failure of the 4C Steam Generator feedwater control valve to close during a subsequent Feedwater Isolation (slow closure) signal resulted in overfeed of the Steam Generator and "shrink" of the Reactor Coolant System inventory. A manual Safety Infection signal was initi-ated by procedure because pressurizer level dropped below 12 percent.
The Auto Stop Oil line weld failure was,due to inadequate field install-ation and fatigue failure. The failure of the control rods to drive in automatically was due to an inadequacy in the refueling Preventive Main-tenance program. The Automatic Rod Control Speed Signal output summator seas out of calibration. The feedwater control valve failure to close is due to an inadequate procedure used during a recent modification. The thermal transient experienced did not affect the structural integrity of Reactor Coolant System components'arious corrective actions have been/
will be performed.
NRC Perm 555
>9 S)I
RRC I66. I 4te M U 6 RUCLKAR RTGULATORY COMMCSIO
'"
LICENSEE EVENT REPORT (LERI TEXT. CONTINUATION >>>>OY6Onvf ~n 5I6. ~
TXPiRTS 6 II NAIAK III OOCKLT IIUM66R Ql II'ACILITY L6R IIUM66R (6I fAGI YIA1 5% OU5 RT I AL +I v >5 K) 9 RUM TR RQ+
Turkey Point Unit 4 51 89 01 00 02 oF0 6 W ~~ 6 terAe4 IRf eAAArel fffC Arm ~'W IITI 2 1 Descri tion of the Event At 0045, on September 15, 1989, the Nuclear Turb'ine Operator (NTO) notified the Plant Supervisor - Nuclear (PSN) of oil leakage in the vicinity of the left High Pressure (HP) turbine stop valve (4-10-010) guarded oil line. After removing the inspection cover, a 0.5 to I.J) gallon per minute (gpm) leak was identified on an Auto Stop Oil line weld (EIIS:TG, Component:WELD) for the left HP turbine stop valve. The oil leak-was not considered by the PSN to pose an immediate
. threat to unit operation. A Reactor Control Operator (RCO) was assigned to per-form hourly inspections of the leaking weld and Auto Stop Oil pressure for signs of increased 'leakage. Operations and maintenance personnel di,scussed options for repair of the cracked weld.
At 0426, orI September 15, 1989, with Unit 4 in Mode 1 operating at 100 percent power, the left turbine stop valve failed closed. The reduction in steam flow to the main turbine caused the steam generators to experience an increase in pressure and a decrease in level (shrink). The large power mismatch '(Reactor Power greater than Turbine Power) led to an increase in the average Reactor Cool-ant System temperature (T-AVE) and an expansion of the Reactor Coolant System fluid (swell), causing the pressurizer level to increase. At the setpoint of 75 percent pressurizer level, the 4C charging pump (EIIS:CB, Component:P) received a signal for low speed operatton. The 4C charging pump tripped following receipt of this signal.
Due to an increase in T-AVE and a decrease in the Reactor Coolant System refer-ence temperature (T-REF) (setpoint of 5 degrees F deviation between T-AVE and T-REF), control rods began "stepping in" automattcally. The Nuclear Watch Eng-ineer (NWE) noted that the control rods (EIIS:AA, Component:ROD) stopped auto-matically driving in after moving four steps. The RCO tried unsuccessfully to drive the control rods in manual. The Assistant Plant Supervisor Nuclear (APSN) noted T-AVE increasing and the main st'earn code safety valves had opened.
The APSN ordered a manual reactor trip.
At 0427, a manual reactor trip was initiated from the Control Room co'nsole by opening the Reactor Trip Breakers and Unit 4 entered Emergency Operating Pro-cedure 4-EOP-E-O, "Reactor Trip or Safety Injection." The manual reactor trip resulted in an automatic turbine trip and, with a low T-AVE (less than the 554 degrees F setpoint), an automatic Feedwater Isolatton (slow closure) signal which causes closure of the main feedwateT control valves within 20 seconds.
The Balance Of Plant (BOP) operator noted dual position indication on feedw'ater control valve FCV-498 (EIIS:SJ, Component:FCV) and increasing level in Steam Generator 4C. The BOP operator placed FCV-498 control in manual and attempted to close the valve.
Failure of FCV-498 to close within 20 seconds resulted in overfeed of Steam Generator 4c and a decrease in T-AvE. This led to a-.decrease (shrink) in press-urizer level. The RCO started charging pumps 4A and 4C to compensate for the decrease in pressurizer level, however, the level could not be maintained. When
~U 6 GRG I 666 666 5 536 466 hRC IORM 56bk
>OAM
RRC e'er
~>l AI ~ LICENSEE EVENT REPORT (LER) TEXT CONTINUATION V 5 RUCLEAR REGUIAEDRV CDMMI55ID A+~ROVED IIMP 4CI E.II H /\A'IIWIRES
~ ACIuTY IIAQE III DGCREE IIUMEER IEI EER IIUMEER IEI AAGI YI A A 55QVI RTIAE >I>>I ILIA V $ IIVCLfAR Rf GVf ATPRY COMMI$$ IO (044l LICENSEE EVENT REPORT (LER) TEXT CONTINUATION A>>P>>OVf Q OV>> 4Q $ '.c' fX>>I>>ff $ .'II SACluTY RA>>lf Ill OOCKf 7 HVMIfR 11l Lf IIVMSfR WI R ~ AGl l YTA>> STOVfhTIAC >>Iv%%4 4vhI T>> 4V4I Turke Point Unit 4 o's 25 189 004 ff'~ ~ 4nes4e4 I>>>> ~NPC A>>>>~'Al llll o o o 0 1 1 0 0 6 is very little tension placed on the adjustment set screw. Misapplication of the pressure switch, coupled with vibration experienced by the pressure switch being mounted on the charging pump, led to the pressure switch being out of calibration.
The cause of the control rod drive mechanisms failure to automatically or man-ually drive in is due to an inadequacy in the refueling Preventive Maintenance program. The Automatic Rod Control Speed signal output summator. to the Rod Con trol Logic Cabinet was found to be out of specification. The maximum expected voltage should be 9.'5 Vdc and it was found to be 10.14 Vdc. This high voltage caused the Rod Control System pulser/oscillator to call for rod speed which was faster than the sy'tem capability. A Logic Cabinet Urgent Failure Alarm halted rod motion as designed. FPL believes the Automatic Rod Contrpl module setpoint drifted over time. These components 'are normally calibrated during refueling outages. During the last refueling outage for Unit 4, a decision was made not to perform the calibrations. A Preventive Maintenance task for periodic cali-bration check's on the Automatic Rod Control Speed Signal output summator does not exist.
The cause of the 4C Steam Generator feedwater control valve FCV-4-498 failure to close within 20 seconds of receiving a Feedwater Isolation signal is due to an inadequate procedure. Foreign material was found in solenoid valve SV-4-4988 which prevented it from totally "switching states" (i.e., all three ports were open at the same time). The foreign material consisted of metal.lic particles (magnetic and non-magnetic) and thread sealant. FPL believes this material entered the solenoid valve during Plant Change/Modification (PC/M)88-241 per-formed during the recent Unit 4 refueling outage. Failure to establish adequate system cleanliness controls led to the introduction of foreign materials. The ASCO solenoid val,ves on feedwater control valves FCV-4-478 and FCV-4-488 were found to be free of debris which 'would prevent proper solenoid valve operation.
The cause of the condenser air ejector radiation monitor spiking is due to design.
During plant transients, where elevated main steam pressure causes moisture carry--
over through the steam jet air ejectors, slight impacts may occur on the thin wall of the beta/gamma Geiger-Meuller.tube. The result is momentary spiking with a re-turn to normal readings.
The cause of the EDG A lube oil low pressure switch hose leak is due to aging,and vibration induced rubbing and chafing from contact with the EDG control cabinet cover plate.
Anal s is of the Event Operator actions in response to the identified equipment problems wer e .appro-priate and resulted in a safe shutdown of the unit. These actions were in accordance with approved plant procedures.
The Reactor Coolant System thermal transient experienced during this event has been evaluated by Westinghouse. The thermal transient has been determined to be similar co the design basis reactor trip from full power event.
I h>>C $ 0>>M $ $AA ~ V S G>>G '$ $ G C." $ ~
3$ A fI I>> All
IIIIC Pere IF431
~ UE IIVCLEAR REGVLATORr COMMIENOr LICENSEE EVENT REPORT (LER) TEXT CONTINUATION AFPROVEO nue wO yI6 'A EXPIRE5 6 .'ll FACILITY IIAAIE III OOCKET NVMEER (11 LEII IIVMEER IEI PAGE,1 YEAR f 6 QVE rr TIAL e I V re I) Ir f
rrVM A evM IR lt ~ Wee Point Unit
~ aAAbnV 4
~ lI 0 5 0 0 0 P 5 1 8 9 0 1,1 00 05 of 0 H refvPPX HITC Arrrr II0 Corrective Actions
- 1) The insert between the metering valve and the Auto Stop Oil line for the Unit 4 left HP turbine stop valve was replaced. This same section of Auto.
Stop Oil line for the right HP turbine stop valve was visually inspected.
The readily accessiblw welds were found to have acceptably spaced welds.
- 2) A visuals inspection of the readily accessible welds in "the same section of-Auto Stop Oil lines to the Unit 3 left and right HP tuibine stop valves will be performed by November 1, 1989.
- 3) Viuration on the Auto Stop Oil lines to both Unit 4 HP turbine stop valves will be observed and measured during unit restart. Appropriate corrective actions will be implemented as necessary.
- 4) The 4C charging pump lube oil pressure switch was replaced with the same type switch. Loctite thread sealant was applied to the adjustment set screw for each of the Unit 3 and Unit 4 charging pump lube oil pressure switches.
- 5) Plant Changes/Modi f i cat i ons PC/M 89-388 (Uni t 3) and PC/M 89-473 (Uni t 4) were issued to replace the charging pump lube oil pressure switches with a different switch type which is more appropriate for this application and to remount the replacement switches to a'location of lower vibration. Imple-mentation of these PC/Ms should be complete prior to restart from the next refueling outage for each unit.
- 8) The Unit 3 and Unit 4 Automatic Rod Control Speed signal output summators were recalibrated.
- 7) A Preventive Maintenance task for periodically performing a calibration check on the Automatic Rod Control Speed signal output summator for Unit 3 and Unit 4 is being developed and will be issued'by December 1, 1989 for canceling refueling outage activities will be reviewed
')
The mechanism and revised appropriately prior to the next scheduled refueling outage.
- 9) The 4C Steam Generator feedwater control valve solenoid valve (SV-4-4988) was replaced with the same type solenoid valve. The ASCO solenoid .valves for Steam Generator feedwater control valves FCV-4-478 and FCV-4-488 were blown down, disassembled, and inspected. The solenoid valves were found to be free of debris which would hinder proper operation.
- 10) Cleanliness requirements for Instrument Air System tubing to instrumenta-tion will be developed and incorporated into Backfit Construction Admin-istrative Site Procedure ASP-24, "System Cleanliness," by December 1, 1989.
- 11) The background activity level after the condenser air ejector radiation monitor spike was verified to be the same as the background level before the spike. A response check of the radiation monitor was performed with satisfactory results.
- 12) The EDG A lube oil 'low pressure switch hose was repa,ired. The remaining hoses on EDG A and hoses on EDG 8 were visually inspected. No o'ther hose leaks were identified.
lrRC FORM 6AAA ~ II 5 GPC 1066 466 f '6 f 6 6 le A%I
~I NRC Form ~ LICENSEE EVENT REPORT (LER) TEXT CONTINUATION VT RVCLTAR RTOVLATPRY C~lTAICWI A>>Anvtp nut wp EXPIR(S e >I H' ACILITY RAAI'Z 111 PPCKKT IIVMILR111 LER IIVMILRIII ~ ACI TI OUI H TEAL 1 I Q IC IQ R HUM T1 ~ 4vv IN Turkey Point Unit 25 189 0 06 H ave ~ H IITvlwL ~ oANonaf 4
HITC Ann ~l 1 (171 o s o o o 0 1 1 0 OF0 6 i3) Preventive Maintenance tasks for replacing rubber hoses in the EDG engine panels every 5 years were created January 27, 1989. Initial performance of these PM tasks will occur during the next scheduled diesel outages of sufficient duration.
Additional Information No similar Licensee Event Reports Wave been identified.