MONTHYEARML20059N0191993-11-12012 November 1993 Diagnostic Evaluation Team Rept on Quad Cities Nuclear Power Station (930823-0903 & 20-30) ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20248F0001989-09-29029 September 1989 Debris in Containment Recirculation Sumps, Technical Review Rept ML20245B6061988-08-31031 August 1988 Inadequate NPSH in HPSI Sys in Pwrs, Engineering Evaluation Rept ML20204J6141988-08-31031 August 1988 AEOD/E807, Pump Damage Due to Low Flow Cavitation ML20196G5251988-06-15015 June 1988 Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector ML20245H9601988-04-15015 April 1988 BWR Overfill Events Resulting in Steam Line Flooding, AEOD Engineering Evaluation Rept ML20148D0671988-03-17017 March 1988 Headquarters Daily Rept for 880317 ML20148B3291988-03-14014 March 1988 Headquarters Daily Rept for 880314 ML20196H6351988-03-0808 March 1988 Headquarters Daily Rept for 880308 ML20196G8881988-03-0303 March 1988 Headquarters Daily Rept for 880303 ML20147E3961988-01-0606 January 1988 Rept of Interview W/Rg Lagrange on 841206 & 14 to Discuss Info Contained in B Hayes 841017 Memo Identifying Series of Submittals Received from Util Between 1980 & 1984 ML20147E3211988-01-0606 January 1988 Rept of Interview W/Rg Lagrange to Discuss Gpu 830520 & s Re Environ Qualification equipment.Marked-up 850409 Statement from H Hukill Also Encl ML20237L3001987-08-24024 August 1987 AEOD/E709 Engineering Evaluation Rept Re Auxiliary Feedwater Trips Caused by Low Suction Pressure.Draft Info Notice Encl ML20235C9311987-06-23023 June 1987 Rept to ACRS Re Humboldt Bay Unit 3 - Core II ML20212F6581986-12-31031 December 1986 Technical Review Rept, Degradation of Safety Sys Due to Component Misalignment &/Or Mispositioned Control/Selector Switches ML20212D9091986-12-23023 December 1986 Localized Rod Cluster Control Assembly (Rcca) Wear at PWR Plants, Engineering Evaluation Rept ML20212B0321986-12-17017 December 1986 Emergency Diesel Generator Component Failures Due to Vibration, Engineering Evaluation Rept ML20214R4851986-10-0909 October 1986 Initial OL Review Rept for Seabrook Station Unit 1 ML20212K6641986-08-0707 August 1986 Inadvertent Recirculation Actuation Signals at C-E Plants, Technical Review Rept ML20206H0871986-03-0303 March 1986 Allegation Review Data Sheet for Case 4-85-A-013 Re Const Activities.Addl Info Requested from Alleger.Case Closed Due to Lack of Response.Related Info Encl ML20206H0761986-01-21021 January 1986 Allegation Review Data Sheet for Case 4-84-A-085 Re Alteration of Personnel Records.Based on Resolution of Allegation 4-84-A-094,case Closed ML20137X6151986-01-0909 January 1986 Engineering Evaluation of Deficient Operator Actions Following Dual Function Valve Failures ML20234F4751985-12-17017 December 1985 Licensing of Power Reactors by Aec ML20234F5601985-12-17017 December 1985 Draft Hazards Analysis ML20214T2211985-11-25025 November 1985 Initial OL Review Rept:Millstone Point Unit 3 ML20206H0621985-10-15015 October 1985 Allegation Review Data Sheet for Case 4-85-A-045 Re Inadequate Handling/Installation Procedures for Equipment, Vendor Control Programs & Spare Parts.Based on Insp Rept 50-482/85-22,case Closed ML20206H0371985-10-0202 October 1985 Allegation Review Data Sheet for Case 4-85-A-044 Re Lack of Effective QA Programs & QC Insps.Based on Insp Rept 50-482/85-22,allegation Closed IR 05000482/19850191985-09-30030 September 1985 Allegation Review Data Sheet for Case 4-85-A-050 Re Mishandling of Document Control Program.Concerns Addressed in Insp Rept 50-482/85-19.Dept of Labor & Allegation Cases Closed ML20206H0131985-09-27027 September 1985 Allegation Review Data Sheet for Case 4-84-A-076 Re Vague Administrative Procedures,Calibr Program Not Working,Test Engineer Authority & Harassment.Based on Insp Rept 50-482/85-03,case Closed ML20137B1231985-09-16016 September 1985 HPCS Sys Relief Valve Failures, Engineering Evaluation Rept ML20206G8431985-09-0303 September 1985 Allegation Review Data Sheet for Case 4-84-A-013 Re Improper Termination of Employee Due to Refusal to Weld Laminated Pipe.Welding non-safety Related.Case Closed on 850827.W/ 840315 Telcon Record & Addl Info IR 05000482/19850311985-08-28028 August 1985 Allegation Review Data Sheet for Case 4-85-A-077 Re 6 Rem Exposure in Containment Bldg Due to Pipe Break.Allegation Investigated During Insp 50-482/85-31 on 850715-19 & Found Unsubstantiated ML20206G8051985-08-27027 August 1985 Allegation Review Data Sheet for Case 4-84-A-114 Re Drugs Planted at Plant.Evidence Destroyed in Testing.Based on Insp Rept 50-482/85-03 & Mullikin 850429 Memo,Case Closed ML20206G7781985-08-27027 August 1985 Allegation Review Data Sheet for Case 4-84-A-195 Re Quality First.Fuel Load Issue Resolved in Insp Rept 50-482/85-10. Technical Issues to Be Resolved Prior to Full Power Licensing.Case Closed w/850815 Memo to File ML20209G3051985-08-0909 August 1985 Closure of ECCS Min Flow Valves, Engineering Evaluation Rept.Recommends IE Issue Info Notice to Remind Licensees of Importance of Min Flow Bypass Capability as Essential Pump Protection Feature ML20206H0801985-07-30030 July 1985 Allegation Review Data Sheet for Case 4-84-A-007 Re Intimidation of QC Inspector.Forwards Documents Closing Allegation.W/O Encls ML20206H1021985-07-30030 July 1985 Allegation Review Data Sheet for Case 4-84-A-008 Re Improper Const Practices.Insp Rept 50-482/84-12 Issued on 841012 & Closeout Ltr Sent on 850405 ML20147E4401985-06-20020 June 1985 Rept of Interview W/Cw Smyth on 850510.Smyth Advised of Unfamiliarity W/Environ Qualification Program in Technical Sense & W/Documentation Needed to Qualify Individual components.Marked-up Lw Harding Statement Encl ML20199G0701985-05-0303 May 1985 Partially Withheld Statement of Decision Re Allegation AQ-38 Concerning Alleged Harassment of QC Inspectors Upon Observation of Weld Defects on vendor-inspected Restraints. Allegation Substantiated.Addl Allegation Repts Encl ML20147H0101985-04-16016 April 1985 Draft Summary Rept for Regional Evaluation of Texas Utils Electric Co,Comanche Peak Steam Electric Station ML20206G9151985-03-12012 March 1985 Allegation Review Data Sheet for Case 4-84-A-015 Re Harassment of Mechanical/Welding QC Inspector for Writing Nonconformance Rept Re Improper Welding Amperage by Superintendent.Util Rept Issued & Case Closed ML20147G9901985-01-31031 January 1985 Summary Rept for Regional Evaluation of Texas Utils Electric Co,Comanche Peak Steam Electric Station ML20205Q7691985-01-18018 January 1985 Status Rept Mechanical/Piping Area. Related Info Encl ML20206G8861985-01-0909 January 1985 Allegation Review Data Sheet for Case 4-85-A-004 Re Electrical Installations.Insp Required.Related Info Encl ML20214R5681984-12-31031 December 1984 Shoreham Nuclear Power Station Initial OL Readiness Assessment ML20214T7251984-11-30030 November 1984 Summary Rept for Regional Evaluation of Diablo Canyon Unit 2 ML20206G8131984-10-0303 October 1984 Allegation Review Data Sheet for Case 4-84-A-102 Re Visual Insp Through Paint,Unfair Intimidation to Produce Results, Rejection of Previous Inspected Welds,Defective Welds & Missing Beams.Addl Info Encl ML20206G7731984-10-0101 October 1984 Allegation Review Data Sheet for Case 4-84-A-098 Re Qa/Qc Program Allegations Re Matl Verification, post-ok Reviews by Engineers & Improper Verification of Snubber Transaction Assemblies ML20206H2431984-09-13013 September 1984 Allegation Review Data Sheet for Case 4-84-A-89 Re Kickbacks & Coverups in QA Dept.State of Ks Interested.No Federal Regulations Violated If Kickback Allegations true.W/840912 Telcon Record.Related Info Encl 1993-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARSVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212J0501999-09-21021 September 1999 Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20210L8661999-08-0202 August 1999 Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20195K1481999-06-16016 June 1999 Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with1999-04-30030 April 1999 Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with ML20205Q5291999-04-16016 April 1999 SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205J6011999-04-0707 April 1999 Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20205C5671999-03-19019 March 1999 Simulator Four-Yr Certification Rept ML20207D2341999-03-0101 March 1999 Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205 ML20204B1571999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.With SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With1999-01-31031 January 1999 Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20205D1311998-12-31031 December 1998 1998 Decommissioning Funding Status Rept for Yr Ending 981231 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20196C8391998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1 ML20196C8731998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-30-1, Fracture Mechanics Evaluation on Observed Indications at Two Welds in Recirculation Piping of Quad Cities,Unit 1 Station ML20196D9651998-11-30030 November 1998 Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by Licensee ML20196G1241998-11-30030 November 1998 COLR for Quad Cities Unit 1 Cycle 16 SVP-98-364, Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196A9761998-11-20020 November 1998 Safety Evaluation Re Licensee 180-day Response to GL 95-07, Thermal Binding of Safety-Related Power-operated Gate Valves ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB SVP-98-346, Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-98-358, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With1998-10-31031 October 1998 Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With SVP-98-326, Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20153D0191998-09-18018 September 1998 Part 21 Rept Re Defect in Gap Conductance Analyses for co- Resident BWR Fuel.Initially Reported on 980917.Corrective Analyses Performed Demonstrating That Current Operating Limits Bounding from BOC to Cycle Exposure of 8 Gwd/Mtu ML20153C6771998-09-17017 September 1998 Part 21 Rept Re Defect Relative to MCPR Operating Limits as Impacted by Gap Conductance of co-resident BWR Fuel at Facilities.Operating Limit for LaSalle Unit 2 & Quad Cities Unit 2 Will Be Revised as Listed ML20151T2711998-09-0404 September 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002 ML20151Y7261998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Quad Cities Nuclear Power Station ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20151Y7301998-07-31031 July 1998 Revised MOR for Jul 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20237A6251998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Quad Cities Nuclear Power Station,Unit 1 & 2 SVP-98-328, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With1998-07-15015 July 1998 Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With SVP-98-249, Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-98-215, Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 2 ML20247N6281998-05-19019 May 1998 Rev 2 to COLR for Quad Cities Unit 2 Cycle 15 SVP-98-176, Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20216C0561998-04-30030 April 1998 Safe Shutdown Rept for Quad Cities Station,Units 1 & 2, Vols 1 & 2.W/22 Oversize Figures ML20217D0281998-04-22022 April 1998 Part 21 Rept Re Additive Constants Used in MCPR Determination for Siemens ATRIUM-9B Fuel by Core Monitoring Sys Were Found to Be non-conservative.SPC Personnel Notified All Customers w/ATRIUM-9B Lead Test Assemblies ML20217G3951998-04-0808 April 1998 TS 3/4.8.F Snubber Functional Testing Scope Quad Cities Unit 2 TS (Safety-Related) Snubber Population 129 Snubbers SVP-98-128, Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 2 1999-09-30
[Table view] |
Text
_ _ . - . _ - _ _ - , _ _ . _
t
, .~
n 1- -
y OFMCFAL4dSEtNL(7 DECy 79gg U. S. ' ATOMIC ENERGY COMMISSION DIVISION OF REACTOR LICENSING L
REPORT TO ADVISORY COMMITTEE SAFEGUARDS ON REACTO IN_THE MATTER OF_
COMMONWEALTH EDISON COMPANY APPLICATION FOR CONSTRUCTION PERMIT FOR TH DOCKETS E OUAD-CITIES UNITS 1 AND 2 _
-254 ND 50-265 SUPPLEMENTAL REPORT ay?"477
- +n
+T I k' nn'::f ; ,
t-
[;ing?;. ['s :C
(
\
i
. . 4 Note by the Director of the Divisioneactor of R Licensing The attached report has been prepared by th consideration by the ACRS .at its meeting. December 1966e Division of React t yv 1
GFFHCHAL USE-ONEY i 8709250076 870921'! i p F01A 197'111 p@
_ - - - - - - - - - - - ~ ^ ^ _
l .0FMCHALUSLOEY l
I. Introduction The regulatory staff report regarding Commonwealth Edison's Quad-Cities .
application for a construction permit was sent to the Committee on November 21, 1966. Since writing this report, the staff has received Amendment No. 4, dated November 28, 1966. This present report summarizes the results of orr continued review of the Quad-Cities application.
II. Amendment No. 4 Amendment No. 4 was prepared principally to supply more detailed information on the engineered safeguards in response to the ACRS request in its letter on Dresden Unit 3, dated August 16, 1966. This additional system and equipment design data, functional performance evaluation, and information on physical arrangement for each of the engineered safeguards systems is under review by the staff. Our review of the details of these systems will continue as construction of the plant progresses. This information, although supplied for the Dresden Unit 3 engineered safeguards, is applicable to the Quad-Cities reactors except for che redundancy indicated in the core spray systems discussed in our previous report. Analysis to date of the new information supplied on the safeguards systems is presented in section IV below.
In addition to information on engineered safeguards systems, Amendment No. 4 contains further information submitted in response to questions raised at the ACRS subcommittee meeting of November 17, 1966. The subcommittee requested information on (1) corrosion protection of,the suppression pool, (2) tornado destruction of the f acility stack, (3) turbine rotor f ailure, (4) fabrication, inspection and test requirements for conventional systems versus General Electric BWR primary system components, and (5) criteria for detection of primary system leakage within
-OFRC4AL USFrONLY-O(
u 1
_OFMGAL USE-ONET the drywell. No new information was supplied which would change the conclusion in our previous report that the plant can be built and operated safely.
III. Missile Protection Capability of Drywell Shield Plug On the basis of the staf f's analysis and conversations with Mr. James Proctor of the Naval Ordnance Laboratory, we believe that the drywell shield plug would withstand any credible missile caused by turbine overspeed f ailure or tornado-carried sections of the facility stack without loss of function. Mr. Proctor had available to him the analyses supplied in Amendments 3 and 4 to the application t
and indicated that the raethod used to calculate miscile penetration in the concrete was acceptable and that the ultimate capability of the shield plug would be about 16 million ft.lb. per square foot of impact area. The highest energy missile originating from the turbine or stack would have signi*icantly less energy than 16 million f t.lb. per square foot on impact with the concrete.
IV. New Information on Safeguards Systens A. Water Source Four screened headers till be previded in the suppression poc1, three cf which are conservatively calculated to be able to supply the water for the core spray, LPCI and HPCI systems simultaneously. We believe that this arrangement is accept-able since multiple paths from the cooling water source are provided. In addition, these systems could be supplied from the condensate storage tank if the suppression pool water source was for some reason not available.
B. LPCI As recommended in our previous report, the applicant has now provided isolation capability on the line which cross-ties the two halves of the LPCI system. The staff believes that this provides additional assurance that at least part of the system will be operable in case of a single component failure.
-OFRGAL USE-GEY t ,d h 'c ,
< . ,((
F
@EHGHAL4JSErONLlt V.- Desien' Basis Nuclear Excursion The following' discussion presents a summary of the consequences of energy re' leases'from~ rod ejection or dropout accident.
To insure the integrity of the reactor . vessel and vital vessel internal structures, the severity of potential nuclear excursions is limited by engineered safeguards. The table below illustrates the importance of'the control rod velocity limiter and the rod thimble supports to limit excursion energy release.
Peak energy. releases for other rod worths may be obtained from Figure 68 of the' Plant Design and Analysis Report.
Peak Calculated Rod Velocity and Energy Release with Control Rod Worth of 2.5%
With Velocity Limiter Without Velocity Limiter Rod Velocity tEnergy Release Rod Velocity Energy Release
- 1. Rod dropout 5 ft/see 200 cal /gm 20 ft/sec 375 cal /gm
- 2. Rod ejection 10 ft/sec ---
15 ft/sec ---
with thimble supports
- 3. Rod ejection 7 30 ft/sec 7400 cal /gm >30 ft/sec 7400 cal /gm without i thimble supports i It should be noted that case '2' in the above table (the rod ejection with J thimble supports) does not result in a significant amount of reactivity insertion since the rod is restrained f rom moving more than a few inches by the thirble j supports.
f i
The design basis nuclear transient has been taken to be the dropout of a rod worth 2.5% at 5 ft/second. The maximum rod worth is limited to this value by pro- k cedural controls backed up by a rod-worth-minimizer computer which limits the rod
-OFFHCHAL USEANLY Y
s,
QEEHGAL-USE ONLi
_4 patterns available to the operator such that no rod, if dropped, could insert in excess of 2.5% in reactivity. The nuclear transient from this rod-dropout accident results in a calculated peak fuel enthalpy of 200 cal /gm (i 25 cal /ge).
Fuel melting takes place between 220 and 280 cal /gm. The applicant has stated that no mechanical damage would result f rom this accident because the major fraction of the energy would be stored in fuel which maintains its clad integrity.
Excursiont which result in peak fuel enthalples between 300 and 400 cal /gm are calculated to result in pressure gradients on the order of 10 to 100 psi.
This energy is transferred to the water by fuel which fragments or melts and is rapidly expelled into the water. The table below summarizes the estimated damage from these excursions.
Resultant Damage to Vessel Internals from Nuclear Excursions Peak Fuel Enthalpy, cal /gm __ Component Damage 375 Channel Box Deformation of the channel box sufficient to interfere with control rod motion.
3?5 Opper Plenum Hold-down bolts yield Head
(
400 Channel Box Yields and splits 400 Upper Plenum Hold-down bolts yield and Head plenum head moves 3-5 feet.
For nuclear excursions with large amounts of fuel above 425 cal /gm (vaporiza-tion threshold), the integrity of the primary system itself would be threatened.
As stated above, excursions of this magnitude are avoided by procedural controls on rod worths and by engineered safeguards.
JGFFHSAL-USEONLY t ha , t i *
?
- 4FFHCHAL'USCONbi--
The staff is continuing its review of the excursion model and damage threshold assumptions used by General Electric. A seminar will be held December 19, 1966, to discuss the company-private document, Nuclear Excursion Analysis, APED-5797, which was recently made available to the staf f. We believe that the engineered safeguards provided will insure that potential n'uclear excursions will be limited to peak enthalpies well below the calculated threshold for major mechanical effects.
VI. Conclusion i
Our conclusion remains unchanged from that stated in our previous report on these reactors; namely, that these reactors can be built and operated without undue risk to the health and safety of the public.