05000266/LER-1983-003, Forwards LER 83-003/01T-0: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20072P984
| number = ML20204F632
| issue date = 03/22/1983
| issue date = 04/19/1983
| title = Forwards LER 83-003/01T-0
| title = Forwards LER 83-003/01T-0
| author name = Fay C
| author name = Burstein S
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| addressee name = Keppler J
| addressee name = Keppler J
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = TAC-12955, TAC-12956, NUDOCS 8304040434
| document report number = NUDOCS 8305020208
| package number = ML20072P990
| package number = ML20204F637
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
Line 32: Line 32:


=text=
=text=
{{#Wiki_filter:r l
{{#Wiki_filter:
l%sconsm Elecinc macomr 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 March 22, 1983 Mr. J. G. Keppler, Regional Administrator Office of Inspection and Enforcement, Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois                  60137
 
==Dear Mr. Keppler:==
 
DOCKET NO. 50-266 LICENSEE EVENT REPORT NO. 83-003/0lT-0 POINT BEACH NUCLEAR PLANT, UNIT 1 Enclosed is Licensee Event Report No. 83-003/0lT-0 (a 14-day follow-up report) with an attachment which provides a description of an event reportable in accordance with Technical Specification 15.6.9.2.A.2, " Operation of the unit or affected systems when any parameter of operation subject to a limiting condition for operation is less conservative than the least conservative aspect of the limiting condition for operation established in the Technical Specifications".
Very truly yours,
                                                                              /
                                                                        }f .V    /
Vice President-Nuclear Power C. W. Fay Enclosure Copy to NRC Resident Inspector e304040434 030322 PDR ADOCK 05000266                                                              MAR 2 8 1983 S                        PDR
                                                                                                ,
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Revision as of 19:53, 13 December 2020

Forwards LER 83-003/01T-0
ML20204F632
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/19/1983
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20204F637 List:
References
NUDOCS 8305020208
Download: ML20204F632 (1)


LER-2083-003, Forwards LER 83-003/01T-0
Event date:
Report date:
2662083003R00 - NRC Website

text