b December 24, 1996 Mr. E. Watzl, Vice President Nuclear Generation Northern States Power Company 414 Nicollet Hall Minneapolis, MN 55401
 
==SUBJECT:==
PLANT PERFORMANCE REVIEW (PPR) - MONTICELLO
 
==Dear Mr. Watzl:==
 
On November 7,1996, the NRC Region III management and staff completed the semiannual Plant Performance Review (PPR) of Monticello. The Region conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitat a planning and allocation of inspection resources. The PPR for Monticello .nvolved the participation of all technical divisions in evaluating inspection results and safety performance information for the period of March 1996 through September 1996. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Monticello PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival cnsite. The enclosure details our inspection plan for the next 6 months. The rationale or basis for each inspection outside the " Core" inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections, as well as periodic inspections by staff, are not listed due to their ongoing and continuous nature.
i 9612310012 961224 PDR    ADOCK 05000263 G                  PDR
 
  '                                                                                                                              I E. Watzl                                                                                                                l e                                                                                                                              l We are interested in feedback on this program, including the need for any                                                    I changes in the inspection plan, and we invite your questions.or comments.                                            If    !
changes are necessary, you will be informed. If you have any questions, please contact me at (630) 829-9736.
Sincerely,
                                                              /s/ E. Scnwelbinz for John M. Jacobson, Chief Reactor Projects Branch 4 Docket No. 50-263 License Nos. DPR-22                                                                                                          )
 
==Enclosure:==
Inspection Plan cc w/ encl:          Plant Manager, Monticello John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA State Liaison Officer, State of Minnesota DISTRIBUTION Docket File w/ encl                                                      DRP w/ encl
    'PUBLIC IE-01 w/ encl                                                    RIII PRR w/ enc 1 OC/LFDCB w/enci                                                          Project Manager, NRR w/ encl SRI Monticello,                                                          B. L. Burgess, w/ encl Prairie Island w/ encl                                                CAAI w/ encl (e-mail)
A. B. Beach, w/ encl                                                    W. L. Axelson, w/ encl
                                                                                                                              \  \
310009                                                                                                              i Document:          S:
g g.......,,.,\miscinfo\s..ppr96 ini. .            .s. .... .rpt\insppln2.
                                                            . .    . c . c.,,mon
                                                                              .. . i . .c.f.. i c . c.,, . . . i t...f. i n.
OFFICE          RIII /                            b RIII  rw, ,_  [    RIII              &    RIII            F NAME            Ring'fbozakM                        Krok/CNd            Leach b ft              Jacobsok DATE            12/?A96                            12/96/96            12/Jo /96                12/a2/96                i 0FFICIAL RECORD COPY                                                  ,
i
 
_      . _ _. m . _.,_ _ . . _ . _ . _ _ .-. _ _ _ . ..-. _ _ .                        ._ _ _ . _ _ _ . _ __. _ . .-.                              . _ . _ . _ _ .._.                . .. .. .        .
MONTICELLO t
INSPECTION PLAN                                                                                                          .
fP - Inspection Procedure                                                                                                                                                                              >
TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION                                                TITLE /  NUMBER OF                                PLANNED                    TYPE OF INSPECTION -
PROGRAM AREA  INSPECTORS                          INSPECTION DATES                              COMMENTS-IP 81700                      Physical Security Program for            1                                1/20-24/97            Core Inspection Power Reactors IP 71001                      Requal Program Evaluation                2                                3/10-14/97            Core Inspection i
IP 62706                      Maintenance Rule Team                    5                                  6/2-6/97 Inspection                                                                                                                                                      ;
IP 84750                      Effluents / Chemistry                    2                                  6/2-6/97            Core Inspection a
f
=
                                                                                                                                                                                                                -l I
__ _ _ _ _ , _ . .                __. _ ._.                              ___. . _ _ . _ . _ _ _ . . .}}

Latest revision as of 03:35, 23 July 2020

Advises of Planned Insp Resulting from Monticello PPR Review.Details of Insp Plans for Next 6 Months Encl. Questions & Comments Welcome
ML20133A247
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/24/1996
From: Jeffrey Jacobson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Watzl E
NORTHERN STATES POWER CO.
References
NUDOCS 9612310012
Download: ML20133A247 (3)


Text

.,

O 9

b December 24, 1996 Mr. E. Watzl, Vice President Nuclear Generation Northern States Power Company 414 Nicollet Hall Minneapolis, MN 55401

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - MONTICELLO

Dear Mr. Watzl:

On November 7,1996, the NRC Region III management and staff completed the semiannual Plant Performance Review (PPR) of Monticello. The Region conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitat a planning and allocation of inspection resources. The PPR for Monticello .nvolved the participation of all technical divisions in evaluating inspection results and safety performance information for the period of March 1996 through September 1996. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Monticello PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival cnsite. The enclosure details our inspection plan for the next 6 months. The rationale or basis for each inspection outside the " Core" inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections, as well as periodic inspections by staff, are not listed due to their ongoing and continuous nature.

i 9612310012 961224 PDR ADOCK 05000263 G PDR

' I E. Watzl l e l We are interested in feedback on this program, including the need for any I changes in the inspection plan, and we invite your questions.or comments. If  !

changes are necessary, you will be informed. If you have any questions, please contact me at (630) 829-9736.

Sincerely,

/s/ E. Scnwelbinz for John M. Jacobson, Chief Reactor Projects Branch 4 Docket No. 50-263 License Nos. DPR-22 )

Enclosure:

Inspection Plan cc w/ encl: Plant Manager, Monticello John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA State Liaison Officer, State of Minnesota DISTRIBUTION Docket File w/ encl DRP w/ encl

'PUBLIC IE-01 w/ encl RIII PRR w/ enc 1 OC/LFDCB w/enci Project Manager, NRR w/ encl SRI Monticello, B. L. Burgess, w/ encl Prairie Island w/ encl CAAI w/ encl (e-mail)

A. B. Beach, w/ encl W. L. Axelson, w/ encl

\ \

310009 i Document: S:

g g.......,,.,\miscinfo\s..ppr96 ini. . .s. .... .rpt\insppln2.

. . . c . c.,,mon

.. . i . .c.f.. i c . c.,, . . . i t...f. i n.

OFFICE RIII / b RIII rw, ,_ [ RIII & RIII F NAME Ring'fbozakM Krok/CNd Leach b ft Jacobsok DATE 12/?A96 12/96/96 12/Jo /96 12/a2/96 i 0FFICIAL RECORD COPY ,

i

_ . _ _. m . _.,_ _ . . _ . _ . _ _ .-. _ _ _ . ..-. _ _ . ._ _ _ . _ _ _ . _ __. _ . .-. . _ . _ . _ _ .._. . .. .. . .

MONTICELLO t

INSPECTION PLAN .

fP - Inspection Procedure >

TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE / NUMBER OF PLANNED TYPE OF INSPECTION -

PROGRAM AREA INSPECTORS INSPECTION DATES COMMENTS-IP 81700 Physical Security Program for 1 1/20-24/97 Core Inspection Power Reactors IP 71001 Requal Program Evaluation 2 3/10-14/97 Core Inspection i

IP 62706 Maintenance Rule Team 5 6/2-6/97 Inspection  ;

IP 84750 Effluents / Chemistry 2 6/2-6/97 Core Inspection a

f

=

-l I