ML19207C511: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:. V.
{{#Wiki_filter:. V.
      .
h    .
h    .
         ,(&
         ,(&
*
                         \ CODSum8TS B POW 8r Stephen H. HoweH wp (Q@      Q Sennor Mce l+rssient Gener al Of fices: 1945 West Parnell Road, Jackson, Michigan 49201 * (517) 788 0453 August 14, lW9 Howe-222-79 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND MUCLEAR PLANT -
                         \ CODSum8TS B POW 8r Stephen H. HoweH wp (Q@      Q Sennor Mce l+rssient Gener al Of fices: 1945 West Parnell Road, Jackson, Michigan 49201 * (517) 788 0453 August 14, lW9 Howe-222-79 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND MUCLEAR PLANT -
INSPECTION REPORT NO 50-329/79-12 AND NO 50-330/79-12
INSPECTION REPORT NO 50-329/79-12 AND NO 50-330/79-12
Line 29: Line 27:
NRC Items of Nonecupliance, Inspection Report No 50-329/79-12 and No 50-330/79-12, Hove-204-79, dated July 20, lJT9 On July 31, 1979, in a telecommunication, your Mr Knop requested that CPCo provide a supplement to the referenced response to the subject report.
NRC Items of Nonecupliance, Inspection Report No 50-329/79-12 and No 50-330/79-12, Hove-204-79, dated July 20, lJT9 On July 31, 1979, in a telecommunication, your Mr Knop requested that CPCo provide a supplement to the referenced response to the subject report.
Specifically, he requested additional information concerning the review of supplier quality verification documents. The enclosure to this letter provides the requested supplemental information.
Specifically, he requested additional information concerning the review of supplier quality verification documents. The enclosure to this letter provides the requested supplemental information.
                                                    '
          '
gfu p1*''
gfu p1*''
u t; A.        ) ; i. 7
u t; A.        ) ; i. 7 A
                                                                                                                    .
                                                           ) []Q g g p y p                  ! 7909126      i  ,U un Una R                  .
A
                                                           ) []Q g g p y p                  ! 7909126      i  ,U
                                                        '
un Una R                  .
 
  *
    .
: f.  .
: f.  .
Enclosure to Hove-222-79
Enclosure to Hove-222-79 SUPPLDIE!TfAL INFOP33. TION TO li0k'E 20T-79 IU FJSPOI!SE TO IE REPole 50-329/79-12 mm 50-330/79-12
-
                                .
SUPPLDIE!TfAL INFOP33. TION TO li0k'E 20T-79 IU FJSPOI!SE TO IE REPole 50-329/79-12 mm 50-330/79-12
: 1. Letter Howe-204-79, Enclosure 1, Item C2 outlined a supplier quality
: 1. Letter Howe-204-79, Enclosure 1, Item C2 outlined a supplier quality
           ' verification documentation review program, the purpose of which is to detect nonconfoming conditions in the data packages such as those given as examples in the 79-12 report. The progrem neither requires a review of an (100%) quality verification documents nor calls for a review of Engineering documents. A sampling plan derived from MIL-STD-105D is used to determine if a given supplier's quality veri-fication documents should be classified as " good" or " indeterminate."
           ' verification documentation review program, the purpose of which is to detect nonconfoming conditions in the data packages such as those given as examples in the 79-12 report. The progrem neither requires a review of an (100%) quality verification documents nor calls for a review of Engineering documents. A sampling plan derived from MIL-STD-105D is used to determine if a given supplier's quality veri-fication documents should be classified as " good" or " indeterminate."

Latest revision as of 07:12, 2 February 2020

Forwards Supplemental Info in Response to IE Insp Repts 50-329/79-12 & 50-330/79-12
ML19207C511
Person / Time
Site: Midland
Issue date: 08/14/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19207C510 List:
References
HOWE-222-79, NUDOCS 7909120146
Download: ML19207C511 (2)


Text

. V.

h .

,(&

\ CODSum8TS B POW 8r Stephen H. HoweH wp (Q@ Q Sennor Mce l+rssient Gener al Of fices: 1945 West Parnell Road, Jackson, Michigan 49201 * (517) 788 0453 August 14, lW9 Howe-222-79 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND MUCLEAR PLANT -

INSPECTION REPORT NO 50-329/79-12 AND NO 50-330/79-12

Reference:

Letter, S H Howell to J G Keppler, Midland Nuclear Plant -

NRC Items of Nonecupliance, Inspection Report No 50-329/79-12 and No 50-330/79-12, Hove-204-79, dated July 20, lJT9 On July 31, 1979, in a telecommunication, your Mr Knop requested that CPCo provide a supplement to the referenced response to the subject report.

Specifically, he requested additional information concerning the review of supplier quality verification documents. The enclosure to this letter provides the requested supplemental information.

gfu p1*

u t; A. ) ; i. 7 A

) []Q g g p y p  ! 7909126 i ,U un Una R .

f. .

Enclosure to Hove-222-79 SUPPLDIE!TfAL INFOP33. TION TO li0k'E 20T-79 IU FJSPOI!SE TO IE REPole 50-329/79-12 mm 50-330/79-12

1. Letter Howe-204-79, Enclosure 1, Item C2 outlined a supplier quality

' verification documentation review program, the purpose of which is to detect nonconfoming conditions in the data packages such as those given as examples in the 79-12 report. The progrem neither requires a review of an (100%) quality verification documents nor calls for a review of Engineering documents. A sampling plan derived from MIL-STD-105D is used to determine if a given supplier's quality veri-fication documents should be classified as " good" or " indeterminate."

If a supplier's documents are classified as good, then a reduced sampling plan vill be used to over-inspect the documentation packages and the effectiveness of the primary inspection conducted in the course of the normal procurement process. If a supplier's docu=ents are given an indeterminate classification, then all quality verification docu=ents from that supplier vill be subject to the over-incpection.

2. Letter Hove-204-79, Enclosure 1, Item C2a stated that Bechtel's Procurement Supplier Quality Organization was requested to conduct a fomal review of valve documentation packages to assure compliance with the requirement for the docu=entation of vall thickness measurements.

This review has been completed. Seventy-five documentation packages from four purchase orders to Westinghouse (1), Target Rock (1) and Henry Pratt (2) were reviewed. All contained the required vall thickness measurements. The purchase order for which Borg Warner supplied valves (7220-M-1293), as of the date of the revier, had documentation submitted for 223 valves, but vall thickness reports were submitted for only 126 valves. Corrective action to obtain the missing documentation has been initiated. It is concluded that this problem is unique to Borg Warner and not limited to the documentation package in which the discrepancy was initially identified.

944 204 was/sm 8/14/79 MOT 0 ram.