ML19260D083: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . | {{#Wiki_filter:. . | ||
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH December YEAR 1979 Revised 1-29-80 SUBMITTED: | VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH December YEAR 1979 Revised 1-29-80 SUBMITTED: | ||
hD G .. o n A SUPERINTENDEST - OPERATIONS APPROVED: | hD G .. o n A SUPERINTENDEST - OPERATIONS APPROVED: | ||
M W s W - l-MANAGER 3 1937 187 8002070 33 0 | M W s W - l-MANAGER 3 1937 187 8002070 33 0 | ||
OPERATING DATA REPORT DOCKET NO. 60-179 DATE I/ N HO COMPLETED BY I4 P M'dison TELEPHONE /031844-5151 OPERATING STATUS North Anna, Unit 1 Notes | OPERATING DATA REPORT DOCKET NO. 60-179 DATE I/ N HO COMPLETED BY I4 P M'dison TELEPHONE /031844-5151 OPERATING STATUS North Anna, Unit 1 Notes | ||
: 2. Reporting Period: December 1979 (Revised) | : 2. Reporting Period: December 1979 (Revised) | ||
: 3. Licensed Thermal Power (MWt): 977R , | : 3. Licensed Thermal Power (MWt): 977R , | ||
: 4. Nameplate Rating (Gross'MWe): Qa7 | : 4. Nameplate Rating (Gross'MWe): Qa7 | ||
: 5. Design Electrical Rating (Net MWe): 907 | : 5. Design Electrical Rating (Net MWe): 907 | ||
Line 36: | Line 32: | ||
N/A | N/A | ||
: 9. Power Level To Which Restricted,If Any (Net MWe): N/A | : 9. Power Level To Which Restricted,If Any (Net MWe): N/A | ||
: 10. Reasons For Restrictions,if Any: N/A | : 10. Reasons For Restrictions,if Any: N/A nis Month Yr.-to-Date Cumulative i1. Hours In Reporting Period 744 8.760 17.777 | ||
nis Month Yr.-to-Date Cumulative i1. Hours In Reporting Period 744 8.760 17.777 | |||
: 12. Number Of Hours Reactor Was Critical 0 5.478.4 in 165 7 | : 12. Number Of Hours Reactor Was Critical 0 5.478.4 in 165 7 | ||
: 13. Reactor Reserve Shutdown Hours 0 51.5 148.3 | : 13. Reactor Reserve Shutdown Hours 0 51.5 148.3 | ||
Line 58: | Line 50: | ||
H in | H in | ||
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup: Im"'"y in icon | : 25. If Shur Down At End Of Report Period. Estimated Date of Startup: Im"'"y in icon | ||
: 26. Units In Test Status (Prior to Commerci:1 Operation): Forecast Achieved | : 26. Units In Test Status (Prior to Commerci:1 Operation): Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 188 -m}} | ||
INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 188 -m}} |
Latest revision as of 22:25, 1 February 2020
ML19260D083 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 01/29/1980 |
From: | Wil Madison VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
Shared Package | |
ML19260D082 | List: |
References | |
NUDOCS 8002070370 | |
Download: ML19260D083 (2) | |
Text
. .
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH December YEAR 1979 Revised 1-29-80 SUBMITTED:
hD G .. o n A SUPERINTENDEST - OPERATIONS APPROVED:
M W s W - l-MANAGER 3 1937 187 8002070 33 0
OPERATING DATA REPORT DOCKET NO.60-179 DATE I/ N HO COMPLETED BY I4 P M'dison TELEPHONE /031844-5151 OPERATING STATUS North Anna, Unit 1 Notes
- 2. Reporting Period: December 1979 (Revised)
- 3. Licensed Thermal Power (MWt): 977R ,
- 4. Nameplate Rating (Gross'MWe): Qa7
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 928 7'. Maximum Dependable Capacity (Net MWe):
898
- 3. If Changes Occur in Capacity Ratings (Items Number 3 nrough 7) Since I_ut Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any: N/A nis Month Yr.-to-Date Cumulative i1. Hours In Reporting Period 744 8.760 17.777
- 12. Number Of Hours Reactor Was Critical 0 5.478.4 in 165 7
- 13. Reactor Reserve Shutdown Hours 0 51.5 148.3
- 14. Hours Generator On-Line 0 6.401 5 in nq7 9
- 15. Unit Reserve Shutdown Hours 0 o n
- 16. Gross Thermal Energy Generated (MWH) 0 1 a .0R 3.118 26 770 - 417
- 17. Gross Electrical Energy Generated (MWH) 0 _,
4.445.917 g.346_14q 0 4,188,866 7,853.446
- 18. Net Electrical Energy Generated (MWH)
- 19. Umt Service Factor 0 61.7 73.0
- 20. Unit Avulability Factor O 61.7 73.0
- 21. Unit Capacity Factor (Using MDC Net) 0 53.7 63.5
- 22. Unit Capacity Factor (Using DER Net)
U 52./ 62.8
- 23. Unit Forced Outage Rate U 4.8 3.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): .'
H in
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup: Im"'"y in icon
- 26. Units In Test Status (Prior to Commerci:1 Operation): Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 188 -m