{{#Wiki_filter:1 | {{#Wiki_filter:1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000456/2012004 AND 05000457/2012004 FOR BRAIDWOOD STATION UNITS 1 AND 2 The following is a feeder for integration into the Braidwood Station Inspection Report Nos. 05000456/2012004 and 05000457/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | ||
No findings were identified during this inspection. | |||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | |||
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | |||
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A510 as listed in the Attachment. | |||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | |||
The NRC review was not documented in a safety evaluation report and did not constitute 2 | |||
approval of licensee-generated changes; therefore, this revision is subject to future inspection. | |||
The specific documents reviewed during this inspection are listed in the Attachment. | |||
The following is a | : b. Findings No findings were identified. | ||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | |||
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF) | |||
Activation and Operation, Revision 16 3 | |||
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000456/2012004 AND 05000457/2012004 FOR BRAIDWOOD STATION UNITS 1 AND 2 The following is a feeder for integration into the Braidwood Station Inspection Report Nos. 05000456/2012004 and 05000457/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 | CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | ||
: 2. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | |||
REPORT DETAILS | : a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A510 as listed in the Attachment. | ||
: | |||
: a. Inspection Scope | |||
The NSIR headquarters staff performed an in | |||
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A510 as listed in the Attachment. | |||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | ||
The NRC review was not documented in a safety evaluation report and did not constitute | The NRC review was not documented in a safety evaluation report and did not constitute 4 | ||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel | approval of licensee-generated changes; therefore, this revision is subject to future inspection. | ||
The specific documents reviewed during this inspection are listed in the Attachment. | |||
N/A | : b. Findings No findings were identified. | ||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | |||
None. | LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | ||
LIST OF DOCUMENTS REVIEWED | Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF) | ||
Activation and Operation, Revision 16 5 | |||
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: | |||
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000461/2012004 FOR CLINTON POWER STATION UNIT 1 The following is a feeder for integration into the Clinton Power Station Inspection Report No. 05000461/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 | CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | ||
: | : 3. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | ||
: a. Inspection Scope | : a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment. | ||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | |||
The NRC review was not documented in a safety evaluation report and did not constitute 6 | |||
approval of licensee-generated changes; therefore, this revision is subject to future inspection. | |||
The specific documents reviewed during this inspection are listed in the Attachment. | |||
: b. Findings No findings were identified. | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | |||
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment. | LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | ||
: b. Findings | Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF) | ||
Activation and Operation, Revision 16 7 | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel | |||
N/A | |||
None. | |||
LIST OF DOCUMENTS REVIEWED | |||
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: | |||
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000237/2012004 AND 05000249/2012004 FOR DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3 The following is a feeder for integration into the Dresden Nuclear Power Station Inspection Report Nos. 05000237/2012004 and 05000249/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 | CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | ||
: | : 4. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | ||
: a. Inspection Scope | : a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment. | ||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | |||
The NRC review was not documented in a safety evaluation report and did not constitute 8 | |||
approval of licensee-generated changes; therefore, this revision is subject to future inspection. | |||
The specific documents reviewed during this inspection are listed in the Attachment. | |||
: b. Findings No findings were identified. | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | |||
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment. | LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | ||
: b. Findings | Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF) | ||
Activation and Operation, Revision 16 9 | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel | |||
N/A | |||
None. | |||
LIST OF DOCUMENTS REVIEWED | |||
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: | |||
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000373/2012004 AND 05000374/2012004 FOR LASALLE COUNTY STATION UNITS 1 AND 2 The following is a feeder for integration into the LaSalle County Station Inspection Report Nos. 05000373/2012004 and 05000374/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 | CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | ||
: | : 5. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | ||
: a. Inspection Scope | : a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment. | ||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | |||
The NSIR headquarters staff performed an in | The NRC review was not documented in a safety evaluation report and did not constitute 10 | ||
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment. | |||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the | |||
The NRC review was not documented in a safety evaluation report and did not constitute | |||
approval of licensee-generated changes; therefore, this revision is subject to future inspection. | |||
The specific documents reviewed during this inspection are listed in the Attachment. | |||
: b. Findings No findings were identified. | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | |||
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF) | |||
Activation and Operation, Revision 16 11 | |||
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment. | |||
: b. Findings | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel | |||
N/A | |||
None. | |||
LIST OF DOCUMENTS REVIEWED | |||
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: | |||
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000263/2012004 FOR MONTICELLO NUCLEAR GENERATING PLANT The following is a feeder for integration into the Monticello Nuclear Generating Plant Inspection Report No. 05000263/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 | CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | ||
: 6. REACTOR SAFETY Cornerstone: | : 6. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | ||
: a. Inspection Scope | : a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121850657 and ML12205A056 as listed in the Attachment. | ||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | |||
The NSIR headquarters staff performed an in | The NRC review was not documented in a safety evaluation report and did not constitute 12 | ||
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121850657 and ML12205A056 as listed in the Attachment. | |||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the | |||
approval of licensee-generated changes; therefore, this revision is subject to future inspection. | |||
The specific documents reviewed during this inspection are listed in the Attachment. | |||
: b. Findings No findings were identified. | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | |||
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Emergency Plan, Revision 37 A.2-101, Classification of Emergencies, Revision 46 A.2-110, Response to a Security Threat, Revisions 9 and 10 A.2-213, Responsibilities of the Emergency Director, Revision 25 A.2-501, Communications During an Emergency, Revision 24 A.2-803, Emergency Communications at the EOF, Revision 13 13 | |||
The following is a feeder for integration into the Palisades Nuclear Plant Inspection Report No. | OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000255/2012004 FOR PALISADES NUCLEAR PLANT The following is a feeder for integration into the Palisades Nuclear Plant Inspection Report No. 05000255/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | ||
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | |||
: 7. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | |||
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12202A061 as listed in the Attachment. | |||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | |||
The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. | |||
The specific documents reviewed during this inspection are listed in the Attachment. | |||
14 | |||
: b. Findings No findings were identified. | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | |||
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EI-1, Emergency Classification and Actions, Revision 55 EI-4.3, Emergency Operations Facility Activation, Revision 26 15 | |||
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000440/2012004 FOR PERRY NUCLEAR POWER PLANT The following is a feeder for integration into the Perry Nuclear Power Plant Inspection Report No. 05000440/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
The following is a feeder for integration into the Perry Nuclear Power Plant Inspection Report No. | |||
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | |||
: 8. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | |||
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12152A268 as listed in the Attachment. | |||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | |||
The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. | |||
The specific documents reviewed during this inspection are listed in the Attachment. | |||
16 | |||
: b. Findings No findings were identified. | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | |||
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Emergency Plan, Revision 35 17 | |||
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000282/2012004 AND 05000306/2012004 FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS 1 AND 2 The following is a feeder for integration into the Prairie Island Nuclear Generating Plant Inspection Report Nos. 05000282/2012004 and 05000306/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
The following is a feeder for integration into the Prairie Island Nuclear Generating Plant Inspection Report | |||
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 | CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | ||
: 9. REACTOR SAFETY Cornerstone: | : 9. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | ||
: a. Inspection Scope | : a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121850150 as listed in the Attachment. | ||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | |||
The NSIR headquarters staff performed an in | The NRC review was not documented in a safety evaluation report and did not constitute 18 | ||
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121850150 as listed in the Attachment. | |||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the | |||
The NRC review was not documented in a safety evaluation report and did not constitute | |||
None. | approval of licensee-generated changes; therefore, this revision is subject to future inspection. | ||
LIST OF DOCUMENTS REVIEWED | The specific documents reviewed during this inspection are listed in the Attachment. | ||
: b. Findings No findings were identified. | |||
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | ||
Section 1EP4: | LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | ||
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes F3-2, Classification of Emergencies, Revision 43 F3-6, Activation and Operation of Technical Support Center, Revision 25 F8-3, Activation and Operation of the EOF, Revision 12 Emergency Plan, Revision 46 19 | |||
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000254/2012004 AND 05000265/2012004 FOR QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 The following is a feeder for integration into the Quad Cities Nuclear Power Station Inspection Report Nos. 05000254/2012004 and 05000265/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 | CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS | ||
: 10. REACTOR SAFETY Cornerstone: | : 10. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04) | ||
: a. Inspection Scope | : a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment. | ||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. | |||
The NSIR headquarters staff performed an in | The NRC review was not documented in a safety evaluation report and did not constitute 20 | ||
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment. | |||
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the | |||
The NRC review was not documented in a safety evaluation report and did not constitute | |||
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | approval of licensee-generated changes; therefore, this revision is subject to future inspection. | ||
Section 1EP4: | The specific documents reviewed during this inspection are listed in the Attachment. | ||
: b. Findings No findings were identified. | |||
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. | |||
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | |||
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF) | |||
Activation and Operation, Revision 16 21}} |
Latest revision as of 22:27, 11 November 2019
ML12262A382 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 09/12/2012 |
From: | Mike Norris Office of Nuclear Security and Incident Response |
To: | Mel Holmberg NRC/RGN-II/DRS/PSB1 |
Michael Norris | |
References | |
IR-12-004 | |
Download: ML12262A382 (21) | |
Text
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000456/2012004 AND 05000457/2012004 FOR BRAIDWOOD STATION UNITS 1 AND 2 The following is a feeder for integration into the Braidwood Station Inspection Report Nos. 05000456/2012004 and 05000457/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A510 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 2
approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF)
Activation and Operation, Revision 16 3
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000456/2012004 AND 05000457/2012004 FOR BRAIDWOOD STATION UNITS 1 AND 2 The following is a feeder for integration into the Braidwood Station Inspection Report Nos. 05000456/2012004 and 05000457/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 2. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A510 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 4
approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF)
Activation and Operation, Revision 16 5
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000461/2012004 FOR CLINTON POWER STATION UNIT 1 The following is a feeder for integration into the Clinton Power Station Inspection Report No. 05000461/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 3. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 6
approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF)
Activation and Operation, Revision 16 7
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000237/2012004 AND 05000249/2012004 FOR DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3 The following is a feeder for integration into the Dresden Nuclear Power Station Inspection Report Nos. 05000237/2012004 and 05000249/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 4. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 8
approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF)
Activation and Operation, Revision 16 9
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000373/2012004 AND 05000374/2012004 FOR LASALLE COUNTY STATION UNITS 1 AND 2 The following is a feeder for integration into the LaSalle County Station Inspection Report Nos. 05000373/2012004 and 05000374/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 5. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 10
approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF)
Activation and Operation, Revision 16 11
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000263/2012004 FOR MONTICELLO NUCLEAR GENERATING PLANT The following is a feeder for integration into the Monticello Nuclear Generating Plant Inspection Report No. 05000263/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 6. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121850657 and ML12205A056 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 12
approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Emergency Plan, Revision 37 A.2-101, Classification of Emergencies, Revision 46 A.2-110, Response to a Security Threat, Revisions 9 and 10 A.2-213, Responsibilities of the Emergency Director, Revision 25 A.2-501, Communications During an Emergency, Revision 24 A.2-803, Emergency Communications at the EOF, Revision 13 13
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000255/2012004 FOR PALISADES NUCLEAR PLANT The following is a feeder for integration into the Palisades Nuclear Plant Inspection Report No. 05000255/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 7. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12202A061 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
14
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EI-1, Emergency Classification and Actions, Revision 55 EI-4.3, Emergency Operations Facility Activation, Revision 26 15
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000440/2012004 FOR PERRY NUCLEAR POWER PLANT The following is a feeder for integration into the Perry Nuclear Power Plant Inspection Report No. 05000440/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 8. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12152A268 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
16
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Emergency Plan, Revision 35 17
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000282/2012004 AND 05000306/2012004 FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS 1 AND 2 The following is a feeder for integration into the Prairie Island Nuclear Generating Plant Inspection Report Nos. 05000282/2012004 and 05000306/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 9. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121850150 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 18
approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes F3-2, Classification of Emergencies, Revision 43 F3-6, Activation and Operation of Technical Support Center, Revision 25 F8-3, Activation and Operation of the EOF, Revision 12 Emergency Plan, Revision 46 19
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000254/2012004 AND 05000265/2012004 FOR QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 The following is a feeder for integration into the Quad Cities Nuclear Power Station Inspection Report Nos. 05000254/2012004 and 05000265/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 10. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 20
approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, Standardized Radiological Emergency Plan, Revision 21 EP-AA-112, Emergency Response Organization (ERO) Emergency Response Facility (ERF)
Activation and Operation, Revision 16 21